Permanent Occupancy | | | 4/19/2010 | | DONE |
|
|
|
|
Zoning Approval | 4/12/2010 | 4/11/2010 | 4/12/2010 | | PASS |
Andrea Tuning
|
|
|
The applicant has installed all improvements that were required wtiht eh approved site plan and landscape plan dated 2/24/2010. ANT The applicant will need public works (Jim Wylie's) approval prior to issuance of a permanent occupancy.
|
(F) Reprint permit | | | 4/15/2009 | | DONE |
|
|
|
|
Construction Site Erosion | 9/17/2008 | 9/17/2008 | 9/17/2008 | | DONE |
Clint A Smith
|
|
|
Approved per Clint Smith ESC02-00097
|
Office Staff conference/action | | | 9/17/2008 | | DONE |
Barbara Stitt
|
|
|
Per George Slane- have Public works give there ok and ESC give there ok and then we can issue an occupancy from the records. Looks like one could have originally been issued had they followed thru with bringing in the sign-off card per George Slane///9-17-08 BAS
|
BLD-Aging Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/19/2005 | 9/19/2005 | 9/19/2005 | | CANC |
Tom Arcoraci
|
|
|
|
Print Occupancy Form | | | 8/22/2005 | | DONE |
|
|
|
|
BLD-Final | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | PASS |
Tom Arcoraci
|
|
|
code zone issues Internet Inspection Request from: Barbara Moore ok for perm occ
|
Reopen Permit (ISS) | | | 7/19/2005 | | DONE |
|
|
|
Re-open per George Slane///7/19/05 BAS
|
DOC - Permit Expired | 6/7/2005 | 6/7/2005 | 6/7/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
Code Occupancy Approval | 6/6/2005 | 6/6/2005 | 6/6/2005 | P | DONE |
Bob Archibald
|
|
|
SCOTT BROWN FINAL SIGNED OFF
|
BLD-Aging Inspection | 4/28/2005 | 4/28/2005 | 4/28/2005 | | NR |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 12/30/2004 12:10:41 PM
|
FIRE-Final Inspection | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 3:03:25 PM. Contact: ###-####.
|
BLD-Final | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 3:04:25 PM. Contact: ###-####.
|
BLD-Final | 12/23/2004 | 12/28/2004 | 12/28/2004 | A | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/23/2004 at 4:19:30 PM. Contact: ###-####.
had conf. w/ owner regarding necessary items for final 12/28/2004 11:25:32 AM
|
FIRE-Final Inspection | 12/27/2004 | 12/27/2004 | 12/27/2004 | P | FAIL |
Troy Cobbley
|
|
|
Still need waterflow verification from United Water 12/27/2004 2:02:11 PM
|
FIRE-Final Inspection | 12/23/2004 | 12/27/2004 | 12/27/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of 2000 gpm from united water at hydrant and provide approved door hardware 12/27/2004 9:38:41 AM
|
BLD-Final | 12/17/2004 | 12/22/2004 | 12/22/2004 | A | CANC |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/17/2004 at 1:58:34 PM. Contact: ###-####.
to reschedule after fire insp. approval 12/22/2004 11:21:37 AM
|
FIRE-Final Inspection | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | FAIL |
Troy Cobbley
|
|
|
Per fire dept review note #3 a fire hydrant is shown on sheet #1. That sheet is missing from the plans. Provide the missing sheet for hydrant verification. Provide waterflow verification per review note #4. Targee street must be open for fire dept access. See review note #5. Provide building address per review note #8. Provide ada approved door hardware on all doors per review note #10. Thumbturns are not allowed. Provide annual inspection for all fire extinguishers. See review note #9 12/20/2004 10:21:15 AM
|
Routing - FIRE | 12/13/2004 | | 12/13/2004 | | DONE |
|
|
|
Reviewed with Mike Otto on non-sprinklered basis under IBC 2003. AS not required under IFC 2003. Required water supply is 1750 gpm for 4900 VB, NS building. Per telcon with United Water, there is an existing hydrant on the north side of the property, with an avialable flow of 2250 gpm, which is adequate if building is NS.
|
FIRE-Final Inspection | 12/9/2004 | 12/10/2004 | 12/10/2004 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans on site. I told the owner per the small amount of information I could access on this project it is a requirement for the shop area, H-4 occupancy, to be sprinklered. At this time there are no sprinklers installed. 12/10/2004 4:04:44 PM
|
BLD-Final | 12/9/2004 | 12/10/2004 | 12/10/2004 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/9/2004 at 1:56:38 PM. needs fire approval and othres 12/10/2004 8:45:48 AM 12/10/2004 8:46:21 AM
|
BLD-Final | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | NR |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 11:01:50 AM. Contact: ###-####.
needs fire and zoning approval prior to bldg 12/9/2004 2:40:56 PM
|
Print Occupancy Form | | | 12/9/2004 | | |
|
|
|
|
BLD-Wall cover | 5/6/2004 | 5/7/2004 | 5/7/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/6/2004 at 5:25:54 PM. Contact: ###-####. drywall nailer instsalled 5/7/2004 9:45:42 AM
|
BLD-Wall cover | 4/29/2004 | 4/29/2004 | 4/29/2004 | P | PART |
Russ Owen
|
|
|
###-#### mike. posted c/n , but ok to insulate and hang ceiling and walls only need to look at fire wall contractor on site will comply with c/n and call back for inspection. 4/29/2004 5:54:43 PM
|
Case Summary (BLD) | | | 11/18/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 9/26/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 9/26/2003 | | |
|
|
|
|
Receive PAYMENT IN FULL PRINT | | | 9/26/2003 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/26/2003 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/20/2003 | | 9/25/2003 | | PASS |
|
|
|
plan modification. Copy of stop work order attached to approved modification.
|
Plan resubmittals received | | | 9/25/2003 | | DONE |
|
|
|
Received two copies of response letter and struct. clacs. Routed to Mike O.
|
Routing Off Site - STRUCTURAL | 9/25/2003 | | 9/25/2003 | | PASS |
|
|
|
metal building only on modification
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/25/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 9/25/2003 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/25/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/25/2003 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/25/2003 | | |
|
|
|
|
Override - Parcel Holds | | | 9/25/2003 | | |
|
|
|
|
Permit Ready to Issue | | | 9/25/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/25/2003 | | DONE |
|
|
|
Spoke with Al and told permit ready & fees and to bring ACHD info
|
Plan assigned to (MLO) | 7/31/2003 | | 9/25/2003 | | PASS |
Mike Otto
|
|
|
9/25/2003 15:00:17 MLO - activity updated through activity BLDA022 from case BLD02-01499.
|
Routing Off Site - STRUCTURAL | 8/28/2003 | | 9/22/2003 | | FAIL |
|
|
|
Spoke with reviewing engineer regarding site conditions, lacking foundation engineering and connection to existing construction. MLO Outstanding structural issues 8/29/2003
9/22/2003 - faxed corrections to Al Marsden MLO
|
Routing - PUBLIC WORKS | 8/15/2003 | | 8/20/2003 | | PASS |
|
|
|
Plan Modification.
|
Plan resubmittals received | | | 8/18/2003 | | DONE |
|
|
|
Received three copies of revised sheet 1A, and three copies of cover letter and information. Three copies of calculations and three copies of sheets 2, S-2, & S-1. Routed to Mike O. kmm
|
Routing - PLAN CHECK | 7/31/2003 | | 8/6/2003 | | FAIL |
|
|
|
Plan Modification. Unable to fax mailed to address on previous application. Applicant failed to fill out plan modification application contact portion. MLO
|
Plans ACCEPTED BY PLAN TECH | | | 7/31/2003 | | DONE |
|
|
|
Plan Modification. Per Mike O.
|
Plan resubmittals received | | | 7/25/2003 | | DONE |
|
|
|
Received plans to change from wood to pre engineered. Routed to Russ Owens to see if he wants to do as resub. or plan mod. kmm
|
BLD-Conference | 7/10/2003 | 7/10/2003 | 7/10/2003 | A | FAIL |
Russ Owen
|
|
|
This has been insulated with out approval at last inspection I had left a c/n posted wit a framing do not cover sticker both of which have been removed, now I have posted a stop work order along with another do not cover sticker and taped a buiseness card up also. Todays inspection was not phoned in I am here for a mechanical r-i. 7/10/2003 1:19:44 PM
|
BLD-Framing/Rough-in | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | FAIL |
Russ Owen
|
|
|
###-####. I have spoke with the engineer he said he had been out to advise them again, and had giver them letter for repairs. I see no letter on site and no special inspection report for any anchor bolt /hold downs, no approved plans, so I have posted a do not cover sticker. on window also with correction about the above. 6/13/2003 4:58:40 PM
|
Override - Parcel Holds | | | 6/13/2003 | | |
|
|
|
|
BLD-Conference | 2/24/2003 | 2/25/2003 | 2/25/2003 | P | PART |
Russ Owen
|
|
|
randy; Phone #: ###-#### need to meet at 4:00 pm.Internet Inspection Request from: Marsha Smylie 2/24/2003 3:25:23 PM. Meet with Engineer,Owner,Framer and Tenant. T o go over the building structure, It was noted that the moved building will have several as built changes to the wall construction. And the structural issues were explained by myself and engineer to the parties pressent. 2/26/2003 1:47:59 PM
|
BLD-Conference | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | CANC |
Russ Owen
|
|
|
this is for 2/25 2/24/2003 2:21:53 PM
|
BLD-Conference | 2/21/2003 | 2/24/2003 | 2/24/2003 | P | CANC |
Carl Dependahl
|
|
|
reschedule... 2/24/2003 1:54:08 PM
|
BLD-Framing/Rough-in | 2/20/2003 | 2/21/2003 | 2/21/2003 | P | FAIL |
Russ Owen
|
|
|
randy or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I meet on site with Randy who will be the occupant, I went over several items with him in reguard to structural issues, there is not 1 hold down that has been installed right, I see by a "note" on the plans that interior shear will be used, there are no cross sections. Connections to the bottom sole plate in some areas will not be able to receive nailing, some areas need full length studs, Note it would appear that a large window has been added at the peak of the north end this is not shown on plan.The exterior wall framing has not been completed to receive the metal siding as the exterior wall framing was changed to smaller diminsion studs and there are areas which will need furing, These plans lack neccesary detailing. As is now there is only the north side of the schell on site, I have been informed by the person on site that there will also be interior changes. I told person on site this day that I would need to meet back on site with my suppervisor and framer also enginner , so as to have all parties present to go over the extensive corrections and or changes,that will need to be made to bring this structure into compliance at least at the structural exterior areas. NOTE: I have been informed that there will be interior changes made to the floor plan at this time I do not know as to the extent. 2/23/2003 10:01:35 AM
|
BLD-Conference | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### LARRY > 407 and 408 went to job site meet owner and gave him a c/n plans lack details and anchors bols not installed need engineer to feild address, not not side or cover anything. 2/12/2003 10:41:24 AM
|
BLD-Conference | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | DONE |
Tom Arcoraci
|
|
|
randy-- cell ###-#### or off ###-#### - done by 407 1/31/2003 2:28:40 PM
|
BLD-Foundation | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
|
BLD-Footing | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | PASS |
Steven Webb
|
|
|
###-####
|
Plan assigned to (MLO) | 6/19/2002 | | 9/9/2002 | | PASS |
Mike Otto
|
|
|
9/9/2002 08:19:23 MLO - activity updated through activity BLDA022 from case BLD02-01499.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/9/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/9/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/9/2002 | | DONE |
|
|
|
TALKED WITH AL PERMIT READY 9-9-02///DLD
|
Issue PAID IN FULL permit | | | 9/9/2002 | | DONE |
|
|
|
|
Routing - FIRE | 9/4/2002 | | 9/6/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/3/2002 | | 9/4/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/3/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets "2", "3", and "4". Routed to Mike Otto.
|
Routing - FIRE | 8/15/2002 | | 8/16/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/9/2002 | | 8/15/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 8/15/2002 | | DONE |
|
|
|
UBC corrections on revised plans
|
Routing - PUBLIC WORKS | 8/6/2002 | | 8/9/2002 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/2/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets 1A, 2, and 3 with comment letter and vicinity map addressed to Brian Murphy. routed to Mike Otto.
|
Routing - PUBLIC WORKS | 7/22/2002 | | 7/23/2002 | | FAIL |
|
|
|
No Pond found - Rereview needs drainage plan revisions.
|
Routing - PLAN CHECK | 7/23/2002 | | 7/23/2002 | | NR |
|
|
|
|
Routing - Erosion and Sediment | 7/18/2002 | | 7/22/2002 | | PASS |
|
|
|
ESC approved with conditions attached to drawing. ESC plan of very marginal quality.
|
Plan Review Completed(1st rev) | | | 7/18/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 7/17/2002 | | 7/18/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 7/17/2002 | | DONE |
|
|
|
UBC corrections
|
Routing - PLAN CHECK | 7/12/2002 | | 7/16/2002 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 7/10/2002 | | 7/12/2002 | | PASS |
|
|
|
1 1/4" service piping required, 1" to urinal branch, thermol expantion protection will be required, sewer cleanouts required every 100'.
|
Routing - PLANNING | 6/28/2002 | | 7/10/2002 | | PASS |
|
|
|
Approved per DRH02-37.
|
Routing Off Site - STRUCTURAL | 6/19/2002 | | 7/8/2002 | | PASS |
|
|
|
Contacted PDQ to take plans to outside eng.
|
Plan resubmittals received | | | 7/8/2002 | | DONE |
|
|
|
Received 1. Three copies of revised drainage plan. Contacted Stan Mchutchison at ###-#### for two additional copies. 2. Three copies of revised ESC plans with revised application. Will hold until I receive the two additional civil copies. 7/9/02 Received two additional revised civil sheet. Routed to Mike O. kmm
|
Plan Review Report | | | 6/28/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 6/28/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 6/28/2002 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/26/2002 | | 6/28/2002 | | FAIL |
|
|
|
Jim, ESC plan needs to be drawn on at least 18 x 24 sheets of paper. The plans need to be signed by Chad Jones. I have contacted Chad asking for two copies. I hope to receive them before plans route to you. Thank you.
See conditions for fail.
|
Routing - PUBLIC WORKS | 6/21/2002 | | 6/26/2002 | | FAIL |
|
|
|
Requires Drainage Plan-No Pond Found
|
Routing - PLANNING Land Div | 6/19/2002 | | 6/21/2002 | | PASS |
|
|
|
This is not a land split or new lot in this pacel. This parcel has gotten prelim. plat approval by Boise City, but according to the owner they may not continue with the subdivision process, keeping this property as one parcel.
|
Plan resubmittals received | | | 6/20/2002 | | DONE |
|
|
|
Received two copeis of revised site plan. Put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2002 | | PEND |
|
|
|
Requires 1.Site plans needs to be completed. Show building dimensions, fire hydrant placement, radius of curves and corners of roads. (6/20/02) Received two copies of site plan.
2.ESC plan needs to be on at least 18 x 24 sizes paper. Plan also needs to be signed and numbered with certification number of plan designer. (contacted Chad Jones)
|
Plan routing begun/NEW & ADDTN | | | 6/19/2002 | | DONE |
|
|
|
|
Fee Review-notes | 6/18/2002 | 6/18/2002 | 6/18/2002 | | DONE |
Amy Lawson
|
|
|
|
Application received | | | 6/18/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/18/2002 | | DONE |
|
|
|
|