Permit Information
Permit NumberBLD02-01499
StatusFinaled
Name SLOANCO LLC
Site Address 6851 W TARGEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
SLOANCO - To relocate existing 4,800 sq. ft. type VN one story building. DRH02-00037 for use as vehicle repair shop (3364 sq ft) and office (1436 sq ft). Other work includes all site improvements, paving and landscaping per approved plans and attachments. Shop is an H-4 with over 3,000 sq. ft. and is required to be fully fire sprinklered with one hour occupancy separation to the offices. 12/13/2004 - Building has been rechecked under the provisions of the 2003 IBC for fire sprinkler requirements in repair garages and NO fire sprinklers are required per J. Gilliland . MLO Also verified with Sam Rogers, Fire Dept.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  4/19/2010 DONE
Zoning Approval4/12/20104/11/20104/12/2010 PASS
DetailsAndrea Tuning
The applicant has installed all improvements that were required wtiht eh approved site plan and landscape plan dated 2/24/2010. ANT The applicant will need public works (Jim Wylie's) approval prior to issuance of a permanent occupancy.
(F) Reprint permit  4/15/2009 DONE
Construction Site Erosion9/17/20089/17/20089/17/2008 DONE
DetailsClint A Smith
Approved per Clint Smith ESC02-00097
Office Staff conference/action  9/17/2008 DONE
DetailsBarbara Stitt
Per George Slane- have Public works give there ok and ESC give there ok and then we can issue an occupancy from the records. Looks like one could have originally been issued had they followed thru with bringing in the sign-off card per George Slane///9-17-08 BAS
BLD-Aging Inspection11/21/200511/21/200511/21/2005 CANC
DetailsTom Arcoraci
DOC - Permit Expired11/21/200511/21/200511/21/2005PPASS
DetailsTom Arcoraci
BLD-Aging Inspection9/19/20059/19/20059/19/2005 CANC
DetailsTom Arcoraci
Print Occupancy Form  8/22/2005 DONE
BLD-Final7/19/20057/20/20057/20/2005APASS
DetailsTom Arcoraci
code zone issues Internet Inspection Request from: Barbara Moore ok for perm occ
Reopen Permit (ISS)  7/19/2005 DONE
Re-open per George Slane///7/19/05 BAS
DOC - Permit Expired6/7/20056/7/20056/7/2005PPASS
DetailsTom Arcoraci
Code Occupancy Approval6/6/20056/6/20056/6/2005PDONE
DetailsBob Archibald
SCOTT BROWN FINAL SIGNED OFF
BLD-Aging Inspection4/28/20054/28/20054/28/2005 NR
DetailsTom Arcoraci
FIRE-Final Inspection12/29/200412/30/200412/30/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 12/30/2004 12:10:41 PM
FIRE-Final Inspection12/29/200412/30/200412/30/2004PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 12/29/2004 at 3:03:25 PM. Contact: ###-####.
BLD-Final12/29/200412/30/200412/30/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/29/2004 at 3:04:25 PM. Contact: ###-####.
BLD-Final12/23/200412/28/200412/28/2004ACANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/23/2004 at 4:19:30 PM. Contact: ###-####.
had conf. w/ owner regarding necessary items for final 12/28/2004 11:25:32 AM
FIRE-Final Inspection12/27/200412/27/200412/27/2004PFAIL
DetailsTroy Cobbley
Still need waterflow verification from United Water 12/27/2004 2:02:11 PM
FIRE-Final Inspection12/23/200412/27/200412/27/2004AFAIL
DetailsTroy Cobbley
Provide verification of 2000 gpm from united water at hydrant and provide approved door hardware 12/27/2004 9:38:41 AM
BLD-Final12/17/200412/22/200412/22/2004ACANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/17/2004 at 1:58:34 PM. Contact: ###-####.
to reschedule after fire insp. approval 12/22/2004 11:21:37 AM
FIRE-Final Inspection12/17/200412/20/200412/20/2004AFAIL
DetailsTroy Cobbley
Per fire dept review note #3 a fire hydrant is shown on sheet #1. That sheet is missing from the plans. Provide the missing sheet for hydrant verification. Provide waterflow verification per review note #4. Targee street must be open for fire dept access. See review note #5. Provide building address per review note #8. Provide ada approved door hardware on all doors per review note #10. Thumbturns are not allowed. Provide annual inspection for all fire extinguishers. See review note #9 12/20/2004 10:21:15 AM
Routing - FIRE12/13/2004 12/13/2004 DONE
Reviewed with Mike Otto on non-sprinklered basis under IBC 2003. AS not required under IFC 2003. Required water supply is 1750 gpm for 4900 VB, NS building. Per telcon with United Water, there is an existing hydrant on the north side of the property, with an avialable flow of 2250 gpm, which is adequate if building is NS.
FIRE-Final Inspection12/9/200412/10/200412/10/2004PFAIL
DetailsTroy Cobbley
No approved plans on site. I told the owner per the small amount of information I could access on this project it is a requirement for the shop area, H-4 occupancy, to be sprinklered. At this time there are no sprinklers installed. 12/10/2004 4:04:44 PM
BLD-Final12/9/200412/10/200412/10/2004ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/9/2004 at 1:56:38 PM. needs fire approval and othres 12/10/2004 8:45:48 AM 12/10/2004 8:46:21 AM
BLD-Final12/8/200412/9/200412/9/2004PNR
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/8/2004 at 11:01:50 AM. Contact: ###-####.
needs fire and zoning approval prior to bldg 12/9/2004 2:40:56 PM
Print Occupancy Form  12/9/2004  
BLD-Wall cover5/6/20045/7/20045/7/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/6/2004 at 5:25:54 PM. Contact: ###-####. drywall nailer instsalled 5/7/2004 9:45:42 AM
BLD-Wall cover4/29/20044/29/20044/29/2004PPART
DetailsRuss Owen
###-#### mike. posted c/n , but ok to insulate and hang ceiling and walls only need to look at fire wall contractor on site will comply with c/n and call back for inspection. 4/29/2004 5:54:43 PM
Case Summary (BLD)  11/18/2003  
Override - Parcel Holds  9/26/2003  
Override - Parcel Holds  9/26/2003  
Receive PAYMENT IN FULL PRINT  9/26/2003 DONE
CHANGE STATUS TO (ISS)  9/26/2003 DONE
Routing - PLAN CHECK8/20/2003 9/25/2003 PASS
plan modification. Copy of stop work order attached to approved modification.
Plan resubmittals received  9/25/2003 DONE
Received two copies of response letter and struct. clacs. Routed to Mike O.
Routing Off Site - STRUCTURAL9/25/2003 9/25/2003 PASS
metal building only on modification
PLANS/APPL TAKEN TO FRONT DESK  9/25/2003 DONE
Override - Parcel Holds  9/25/2003  
Override - Parcel Holds  9/25/2003  
Inspection Record Card- Bld  9/25/2003 DONE
Print Occupancy Form  9/25/2003 DONE
Override - Parcel Holds  9/25/2003  
Override - Parcel Holds  9/25/2003  
Permit Ready to Issue  9/25/2003 DONE
Telephone call  9/25/2003 DONE
Spoke with Al and told permit ready & fees and to bring ACHD info
Plan assigned to (MLO)7/31/2003 9/25/2003 PASS
DetailsMike Otto
9/25/2003 15:00:17 MLO - activity updated through activity BLDA022 from case BLD02-01499.
Routing Off Site - STRUCTURAL8/28/2003 9/22/2003 FAIL
Spoke with reviewing engineer regarding site conditions, lacking foundation engineering and connection to existing construction. MLO Outstanding structural issues 8/29/2003
9/22/2003 - faxed corrections to Al Marsden MLO
Routing - PUBLIC WORKS8/15/2003 8/20/2003 PASS
Plan Modification.
Plan resubmittals received  8/18/2003 DONE
Received three copies of revised sheet 1A, and three copies of cover letter and information. Three copies of calculations and three copies of sheets 2, S-2, & S-1. Routed to Mike O. kmm
Routing - PLAN CHECK7/31/2003 8/6/2003 FAIL
Plan Modification. Unable to fax mailed to address on previous application. Applicant failed to fill out plan modification application contact portion. MLO
Plans ACCEPTED BY PLAN TECH  7/31/2003 DONE
Plan Modification. Per Mike O.
Plan resubmittals received  7/25/2003 DONE
Received plans to change from wood to pre engineered. Routed to Russ Owens to see if he wants to do as resub. or plan mod. kmm
BLD-Conference7/10/20037/10/20037/10/2003AFAIL
DetailsRuss Owen
This has been insulated with out approval at last inspection I had left a c/n posted wit a framing do not cover sticker both of which have been removed, now I have posted a stop work order along with another do not cover sticker and taped a buiseness card up also. Todays inspection was not phoned in I am here for a mechanical r-i. 7/10/2003 1:19:44 PM
BLD-Framing/Rough-in6/13/20036/13/20036/13/2003PFAIL
DetailsRuss Owen
###-####. I have spoke with the engineer he said he had been out to advise them again, and had giver them letter for repairs. I see no letter on site and no special inspection report for any anchor bolt /hold downs, no approved plans, so I have posted a do not cover sticker. on window also with correction about the above. 6/13/2003 4:58:40 PM
Override - Parcel Holds  6/13/2003  
BLD-Conference2/24/20032/25/20032/25/2003PPART
DetailsRuss Owen
randy; Phone #: ###-#### need to meet at 4:00 pm.Internet Inspection Request from: Marsha Smylie 2/24/2003 3:25:23 PM. Meet with Engineer,Owner,Framer and Tenant. T o go over the building structure, It was noted that the moved building will have several as built changes to the wall construction. And the structural issues were explained by myself and engineer to the parties pressent. 2/26/2003 1:47:59 PM
BLD-Conference2/24/20032/24/20032/24/2003PCANC
DetailsRuss Owen
this is for 2/25 2/24/2003 2:21:53 PM
BLD-Conference2/21/20032/24/20032/24/2003PCANC
DetailsCarl Dependahl
reschedule... 2/24/2003 1:54:08 PM
BLD-Framing/Rough-in2/20/20032/21/20032/21/2003PFAIL
DetailsRuss Owen
randy or ###-####; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. I meet on site with Randy who will be the occupant, I went over several items with him in reguard to structural issues, there is not 1 hold down that has been installed right, I see by a "note" on the plans that interior shear will be used, there are no cross sections. Connections to the bottom sole plate in some areas will not be able to receive nailing, some areas need full length studs, Note it would appear that a large window has been added at the peak of the north end this is not shown on plan.The exterior wall framing has not been completed to receive the metal siding as the exterior wall framing was changed to smaller diminsion studs and there are areas which will need furing, These plans lack neccesary detailing. As is now there is only the north side of the schell on site, I have been informed by the person on site that there will also be interior changes. I told person on site this day that I would need to meet back on site with my suppervisor and framer also enginner , so as to have all parties present to go over the extensive corrections and or changes,that will need to be made to bring this structure into compliance at least at the structural exterior areas. NOTE: I have been informed that there will be interior changes made to the floor plan at this time I do not know as to the extent. 2/23/2003 10:01:35 AM
BLD-Conference2/21/20032/21/20032/21/2003PCANC
DetailsCarl Dependahl
BLD-Framing/Rough-in2/11/20032/12/20032/12/2003AFAIL
DetailsRuss Owen
###-#### LARRY > 407 and 408 went to job site meet owner and gave him a c/n plans lack details and anchors bols not installed need engineer to feild address, not not side or cover anything. 2/12/2003 10:41:24 AM
BLD-Conference1/31/20031/31/20031/31/2003PDONE
DetailsTom Arcoraci
randy-- cell ###-#### or off ###-#### - done by 407 1/31/2003 2:28:40 PM
BLD-Foundation11/26/200211/26/200211/26/2002PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Amy Lawson
BLD-Footing11/25/200211/25/200211/25/2002PPASS
DetailsSteven Webb
###-####
Plan assigned to (MLO)6/19/2002 9/9/2002 PASS
DetailsMike Otto
9/9/2002 08:19:23 MLO - activity updated through activity BLDA022 from case BLD02-01499.
PLANS/APPL TAKEN TO FRONT DESK  9/9/2002 DONE
Inspection Record Card- Bld  9/9/2002 DONE
Print Occupancy Form  9/9/2002 DONE
Telephone call  9/9/2002 DONE
TALKED WITH AL PERMIT READY 9-9-02///DLD
Issue PAID IN FULL permit  9/9/2002 DONE
Routing - FIRE9/4/2002 9/6/2002 PASS
Routing - PLAN CHECK9/3/2002 9/4/2002 PASS
Plan resubmittals received  9/3/2002 DONE
Received two sets of resubmittal sheets "2", "3", and "4". Routed to Mike Otto.
Routing - FIRE8/15/2002 8/16/2002 PASS
Routing - PLAN CHECK8/9/2002 8/15/2002 FAIL
corrections sent to architect
Plan resubmittals requested  8/15/2002 DONE
UBC corrections on revised plans
Routing - PUBLIC WORKS8/6/2002 8/9/2002 PASS
Plan resubmittals received  8/2/2002 DONE
Received two sets of resubmittal sheets 1A, 2, and 3 with comment letter and vicinity map addressed to Brian Murphy. routed to Mike Otto.
Routing - PUBLIC WORKS7/22/2002 7/23/2002 FAIL
No Pond found - Rereview needs drainage plan revisions.
Routing - PLAN CHECK7/23/2002 7/23/2002 NR
Routing - Erosion and Sediment7/18/2002 7/22/2002 PASS
ESC approved with conditions attached to drawing. ESC plan of very marginal quality.
Plan Review Completed(1st rev)  7/18/2002 FAIL
Routing - FIRE7/17/2002 7/18/2002 FAIL
Plan resubmittals requested  7/17/2002 DONE
UBC corrections
Routing - PLAN CHECK7/12/2002 7/16/2002 FAIL
corrections sent to architect
Routing - PLUMBING7/10/2002 7/12/2002 PASS
1 1/4" service piping required, 1" to urinal branch, thermol expantion protection will be required, sewer cleanouts required every 100'.
Routing - PLANNING6/28/2002 7/10/2002 PASS
Approved per DRH02-37.
Routing Off Site - STRUCTURAL6/19/2002 7/8/2002 PASS
Contacted PDQ to take plans to outside eng.
Plan resubmittals received  7/8/2002 DONE
Received 1. Three copies of revised drainage plan. Contacted Stan Mchutchison at ###-#### for two additional copies. 2. Three copies of revised ESC plans with revised application. Will hold until I receive the two additional civil copies. 7/9/02 Received two additional revised civil sheet. Routed to Mike O. kmm
Plan Review Report  6/28/2002 DONE
Plan Review Report  6/28/2002 DONE
Plan Review Report  6/28/2002 DONE
Routing - Erosion and Sediment6/26/2002 6/28/2002 FAIL
Jim, ESC plan needs to be drawn on at least 18 x 24 sheets of paper. The plans need to be signed by Chad Jones. I have contacted Chad asking for two copies. I hope to receive them before plans route to you. Thank you.

See conditions for fail.
Routing - PUBLIC WORKS6/21/2002 6/26/2002 FAIL
Requires Drainage Plan-No Pond Found
Routing - PLANNING Land Div6/19/2002 6/21/2002 PASS
This is not a land split or new lot in this pacel. This parcel has gotten prelim. plat approval by Boise City, but according to the owner they may not continue with the subdivision process, keeping this property as one parcel.
Plan resubmittals received  6/20/2002 DONE
Received two copeis of revised site plan. Put with plans. kmm
Plans ACCEPTED BY PLAN TECH  6/19/2002 PEND
Requires 1.Site plans needs to be completed. Show building dimensions, fire hydrant placement, radius of curves and corners of roads. (6/20/02) Received two copies of site plan.
2.ESC plan needs to be on at least 18 x 24 sizes paper. Plan also needs to be signed and numbered with certification number of plan designer. (contacted Chad Jones)

Plan routing begun/NEW & ADDTN  6/19/2002 DONE
Fee Review-notes6/18/20026/18/20026/18/2002 DONE
DetailsAmy Lawson
Application received  6/18/2002  
Recd Pcfee & Taken To Pln CK  6/18/2002 DONE