BLD-Grading Inspection | 10/30/2003 | 10/30/2003 | 10/30/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage approved
|
BLD-Final | 10/30/2003 | 10/30/2003 | 10/30/2003 | | DONE |
|
|
|
Final/Storey
|
Letter of compliance | | | 10/30/2003 | | DONE |
|
|
|
Letter of Compliance # 24314 issued 10-30-03.
|
BLD-Conference | 10/15/2003 | 10/16/2003 | 10/16/2003 | A | PART |
Jim Storey
|
|
|
Russ; Phone #: ###-#### Internet Inspection Request from: Annette Moore final ok pending ele plm and pw. 10/16/2003 9:23:05 AM
|
Inspection Record Card- Bld | | | 10/7/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/7/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/15/2003 | 4/16/2003 | 4/16/2003 | A | PASS |
Tony Young
|
|
|
justin shear nail; Phone #: ###-#### Internet Inspection Request from: Darla Downs
int. shear ok 4/16/2003 11:56:07 AM
|
BLD-Energy code compliance | 4/9/2003 | 4/10/2003 | 4/10/2003 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
need to call for int. shear later? 4/10/2003 12:32:56 PM
|
BLD-Framing/Rough-in | 4/8/2003 | 4/8/2003 | 4/8/2003 | P | PASS |
Tony Young
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 4/2/2003 | 4/3/2003 | 4/3/2003 | A | FAIL |
Tony Young
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted 4/3/2003 12:39:03 PM
|
BLD-Framing/Rough-in | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | FAIL |
Tony Young
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
no inspection, need all trades 1st 4/1/2003 2:42:20 PM
|
BLD-Framing/Rough-in | 3/19/2003 | 3/20/2003 | 3/20/2003 | A | PART |
Tony Young
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Annette Moore
verify new hold downs at frame insp. 3/20/2003 3:40:21 PM
|
BLD-Framing/Rough-in | 3/17/2003 | 3/18/2003 | 3/18/2003 | A | FAIL |
Tony Young
|
|
|
JUSTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downs
need new eng. on missing hold downs, added windows, no cover allowed, also need to add blocks on all walls and king studs on tall walls 3/18/2003 10:30:51 AM
|
BLD-Foundation | 1/28/2003 | 1/29/2003 | 1/29/2003 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 1/28/2003 at 5:06:18 PM. Contact: ###-####. Perimeter walls pass--complete including steel per plans (except hd not installed); interior footings not complete at time of inspection -- work in progress. 1/29/2003 8:52:15 AM
|
BLD-Footing | 1/22/2003 | 1/24/2003 | 1/24/2003 | A | PART |
Tony Young
|
|
|
CURTIS; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip, ok so far 1/24/2003 11:30:08 AM
|
BLD-Grading Inspection | 1/22/2003 | 1/22/2003 | 1/22/2003 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
BLD-Conference | 1/14/2003 | 1/15/2003 | 1/15/2003 | A | PASS |
Carl Dependahl
|
|
|
Just now starting work needed extension before end of Jaunary ###-#### carl
|
Issue PAID IN FULL permit | | | 9/10/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2002 | | DONE |
|
|
|
will come in, in 1 week.
|
Plan assigned to (DJO) | 7/26/2002 | 7/26/2002 | 7/30/2002 | | PASS |
Dan Overy
|
|
|
7/30/2002 11:12:48 DJO - activity updated through activity BLDA022 from case BLD02-01518.
|
Case Summary (BLD) | | | 7/30/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 7/30/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 7/30/2002 | | DONE |
|
|
|
HAVE RED-LINED MISSING BEARING AND BEAMS. FOOTINGS F5 & F6 CALCULATIONS ARE BEING FAXED. SHEAR AT GARAGE FRONT WALL LINE WILL BE ADDRESSED BY ENGINEER AS CONFIGURATION OF CENTER PIER HAS BEEN MODIFIED. ADDITIONAL CALCULATIONS FOR ENTRY PADS AND INTERIOR STRIP FOOTINGS TO BE ADDRESSED BEFORE FRAME INSPECTION.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/30/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/30/2002 | | DONE |
|
|
|
|
Telephone call | | | 7/30/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan Reviewer's activity | | | 7/26/2002 | | PEND |
|
|
|
have called mark (glancey/rockwell) about missing bearing, incorrect engineered sheets, beam lengths, footing sections, interior strip footings, isolated exterior front porch footings, spread footings not calculated or engineered information incorrect on plans, etc. will issue once all items have been addressed.
|
Plans ACCEPTED BY PLAN CHECK | | | 7/26/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/2/2002 | | 7/11/2002 | | PASS |
Rita DeYoung
|
|
|
Approved revised grading plan
|
Routing - PUBLIC WORKS GRADING | 6/21/2002 | | 7/2/2002 | | FAIL |
Rita DeYoung
|
|
|
6/24/02 Approved as category 3 with conditions of approval in letter attached to plans.
7/2/02 - Requires a revised grading plan due to a revised site plan of 7/1/02. Per Terry Records. kmm
|
Routing - FIRE | 7/1/2002 | | 7/2/2002 | | DONE |
|
|
|
No fire sprinklers required for Highland's Hackberry subdivision 4.
|
Routing - PLANNING | 6/28/2002 | | 7/1/2002 | | PASS |
|
|
|
Revised site plan.
|
Routing - PLANNING | 6/25/2002 | | 6/26/2002 | | FAIL |
|
|
|
Wrong setbacks. Driveway not 50 ft. from intersection.
|
Routing - PUBLIC WORKS | 6/25/2002 | | 6/25/2002 | | PASS |
|
|
|
|
Telephone call | | | 6/21/2002 | | DONE |
|
|
|
Called left message for Ken Coffey to provide (2) copies of Erosion/Sediment Prepared Plans and ESC Permit Application. Stated that I cannot start routing until I receive this.
|
Routing - Erosion and Sediment | 6/21/2002 | | 6/21/2002 | | PASS |
|
|
|
ESC Permit waived with conditions attached to plans.
|
Application received | | | 6/19/2002 | | DONE |
|
|
|
6/21/02 Erosion/Sediment Prepared Plans and Application waived per Jim Rogers. Started Routing of plans.
6/19/02 Plans on hold. Waiting for (2) copies of the Erosion/Sediment Prepared Plans with the Erosion/Sediment Permit Application. Left Message.
|
Pending Assignment by DJO | 6/19/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 7/11/2002 | | | | |
|
|
|
|