Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-01532
StatusFinaled
Name BOISE CITY PDS DEPT/PUBLIC WORKS
Site Address 150 N CAPITOL BLVD
Project NameCITY HALL-2ND FLR EXPANSION
Customer Number 
ePlanReviewNo
Description
(PLANNING & DEVELOPMENT SERVICES & PUBLIC WORKS ADMINISTRATIVE OFFICES) (CITY HALL EXPANSION, 2ND FLOOR) To perform selective demolition of the entire 2nd floor. To remodel 12,870 for use as offices and support areas for PDS Dept. & PW. Work to include construction of interior, non-bearing, non-combustible, fire-resistive walls to create private offices, open office areas, break room & conference rooms; install suspended grid ceiling system; upgrade electrical, mechanical, plumbing, fire sprinkleres and alarm system to meet tenant needs and comply with current adopted Boise City codes. All per approved plans, to include red-line comments on plans and attached plan reviews of reviewing agencies. NOTE: This building is fully sprinklered. PC#02-372/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 6/1/20096/1/2009 DONE
DetailsBarbara Stitt
CHANGE STATUS TO (ISS)  6/1/2009 DONE
DetailsBarbara Stitt
Per Bob Archibald--see scanned documents 6-1-09 BAS
Permanent Occupancy  6/1/2009 DONE
DetailsBarbara Stitt
BLD-Final5/29/20095/29/20095/29/2009PPASS
DetailsBob Archibald
Ok for final. Fire requirements completed under FIR02-00515 and 00451.
BLD-Aging Inspection5/29/20085/29/20086/6/2008 PASS
DetailsDave Hannah
DOC - Permit Expired6/6/20086/6/20086/6/2008PPASS
DetailsDave Hannah
BLD-Aging Inspection3/4/20083/4/20083/4/2008 DEFR
DetailsDave Hannah
sent to 410
BLD-Aging Inspection1/3/20081/3/20081/3/2008 DEFR
DetailsDave Hannah
BLD-Aging Inspection9/18/20079/18/20079/20/2007 FAIL
DetailsDave Hannah
needs fire signoffs
BLD-Aging Inspection7/19/20077/19/20077/23/2007 PASS
DetailsDave Hannah
NEEDS FIRE FINAL
BLD-Aging Inspection8/2/20068/2/20068/8/2006 DEFR
DetailsForrest France
BLD-Aging Inspection1/5/20061/5/20061/5/2006 PASS
DetailsDave Hannah
waiting for fire final
BLD-Aging Inspection11/2/200511/2/200511/3/2005 PASS
DetailsDave Hannah
BLD-Aging Inspection4/1/20054/1/20054/4/2005 NR
DetailsTroy Cobbley
Need fire alarm permit finaled
BLD-Aging Inspection8/9/20048/9/20048/9/2004 PASS
DetailsDave Hannah
BLD-Aging Inspection6/8/20046/8/20046/8/2004 PASS
DetailsDave Hannah
wip 6/8/2004 9:27:47 AM
BLD-Aging Inspection8/18/20038/18/20038/18/2003 DONE
DetailsCarl Dependahl
awaiting damper install at bsmt ducts & misc items for "final" 8/18/2003 9:12:50 AM
BLD-Conference6/2/20036/3/20036/3/2003PPASS
DetailsCarl Dependahl
w/ 6/4/2003 10:10:10 AM
BLD-Final5/30/20036/2/20036/2/2003APART
DetailsCarl Dependahl
ok for t/o pend fire final, must resolve agreement issues. 6/2/2003 3:18:23 PM
FIRE-Final Inspection5/30/20036/2/20036/2/2003AFAIL
DetailsRick Jackson
scott sprinkler overspaced outside of conference room 4 and it needs an alarm notification horn/strobe; sprinkler over 9 foot from wall inside conference room 4 6/2/2003 3:41:12 PM
BLD-Conference6/2/20036/2/20036/2/2003PPASS
DetailsCarl Dependahl
w/ scott 6/2/2003 2:55:34 PM
BLD-Final5/29/20035/30/20035/30/2003PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/29/2003 at 7:52:08 PM. Contact: ###-####.
FIRE-Final Inspection5/29/20035/30/20035/30/2003PCANC
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/29/2003 at 7:53:01 PM. Contact: ###-####.
BLD-Conference5/30/20035/30/20035/30/2003APASS
DetailsCarl Dependahl
Scott...call in associated permits for final. 5/30/2003 2:31:24 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003PPART
DetailsCarl Dependahl
2nd fl, ele ok at walls. 5/15/2003 4:35:15 PM
BLD-Framing/Rough-in5/14/20035/15/20035/15/2003APART
DetailsCarl Dependahl
west portion 2nd fl walls, look ok pending trades insps. 5/15/2003 1:24:23 PM
BLD-Framing/Rough-in5/13/20035/14/20035/14/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 5/13/2003 at 8:09:26 PM. Contact: ###-####.
FIRE-Final Inspection5/5/20035/6/20035/6/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/5/2003 at 5:08:29 PM. Contact: ###-####. okay for area occupied by the old conference room 5/6/2003 2:06:54 PM
BLD-Final5/5/20035/6/20035/6/2003ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/5/2003 at 5:10:05 PM. Contact: ###-####.
BLD-Final5/6/20035/6/20035/6/2003PPART
DetailsCarl Dependahl
ok to use rm 246,c/n, other finals (alarms, elec) ok for t/o 5/6/2003 4:21:58 PM
BLD-Framing/Rough-in4/15/20034/16/20034/16/2003AFAIL
DetailsCarl Dependahl
keep c/n 4/15/2003 2:21:11 PM
BLD-Framing/Rough-in4/15/20034/16/20034/16/2003APART
DetailsCarl Dependahl
reinsp...straps added, braces to be installed after glazing assy's...ok to cover walls. 4/16/2003 10:20:17 AM
BLD-Framing/Rough-in4/14/20034/15/20034/15/2003PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 4/14/2003 at 4:28:42 PM. Contact: ###-####...keep c/n 4/15/2003 2:24:08 PM
BLD-Framing/Rough-in4/10/20034/11/20034/11/2003PNR
DetailsCarl Dependahl
keep c/n....ok to strap studs or equivalent, bracing to be installed afer windows per Scott, Supt. 4/11/2003 2:03:42 PM
BLD-Framing/Rough-in4/10/20034/11/20034/11/2003AFAIL
DetailsCarl Dependahl
wORKING NIGHTS...2ND FL...c/n, brace walls, splice or add full ht. studs. 4/11/2003 1:29:58 PM
BLD-Framing/Rough-in4/9/20034/10/20034/10/2003PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 4/9/2003 at 11:51:00 PM. Contact: ###-####.
BLD-Final2/27/20032/27/20032/27/2003PPART
DetailsCarl Dependahl
scott ...ok to use P&Z area at 2nd fl...existing "city" side of bldg. 2/27/2003 1:14:59 PM
BLD-Final2/21/20032/24/20032/24/2003ANR
DetailsCarl Dependahl
fn -scott ###-####
BLD-Final2/24/20032/24/20032/24/2003PFAIL
DetailsCarl Dependahl
scott, c/n: verify other finals, smoke/fire damper locations, misc finish... ok for t/o 2/24/2003 4:59:58 PM
FIRE-Final Inspection2/24/20032/24/20032/24/2003APART
DetailsRick Jackson
per Dave Miller temp occ is approved pending resolution of getting the elevator machine room fire sprinklered; alternate floor recall for elevator; notification devices in walkways and lobby; updated map at FACP 2/24/2003 1:26:02 PM
Temporary occupancy  2/24/2003 DONE
Temp. Occ. Cert. #4922 issued 2-24-03 to PDS & Public Works (east side only).
BLD-Framing/Rough-in2/20/20032/20/20032/20/2003PCANC
DetailsCarl Dependahl
clg grid adjacent to records...add seismic strut ok pend elec/hvac ok's...intall
BLD-Framing/Rough-in2/20/20032/20/20032/20/2003PPART
DetailsCarl Dependahl
grid; add strut...chk at final leave out that tile.
FIRE-Final Inspection2/18/20032/19/20032/19/2003PFAIL
DetailsRick Jackson
SCOTT; Phone #: ###-#### Internet Inspection Request from: Darla Downs FACP's aren't talking to each other; need supervised tamper switches; need horn/strobes working per NFPA 72 2/19/2003 5:06:28 PM
BLD-Final2/18/20032/19/20032/19/2003PNR
DetailsCarl Dependahl
SCOTT; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 2/20/2003 2:13:42 PM...nr, need fire ok'd. 2/20/2003 2:15:31 PM
BLD-Conference2/18/20032/18/20032/18/2003PPASS
DetailsCarl Dependahl
###-####...need fire ok for t/o. 2/18/2003 5:24:07 PM
FIRE-Conference2/18/20032/18/20032/18/2003PPART
DetailsRick Jackson
###-#### met with Scott about final requirements; will need alarm plans as they are "ready" for pick up at permit desk 2/18/2003 4:14:26 PM
BLD-Framing/Rough-in2/4/20032/5/20032/5/2003PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/04/2003 at 15:48:32. Contact: ###-####....raised floor area...walls ok pend elec 2/5/2003 4:32:19 PM
BLD-Framing/Rough-in1/20/20031/21/20031/21/2003APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/20/2003 at 15:01:53. Contact: ###-####.
BLD-Framing/Rough-in1/20/20031/21/20031/21/2003ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/20/2003 at 15:01:53. Contact: ###-####.
BLD-Framing/Rough-in1/21/20031/21/20031/21/2003PPART
DetailsCarl Dependahl
scott...computer rm floor joisting/bridging ok to "deck" 1/21/2003 1:33:19 PM 1/21/2003 1:33:59 PM
BLD-Framing/Rough-in1/16/20031/16/20031/16/2003PNR
DetailsCarl Dependahl
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...need to install blocking/or bridging at slice point per revised eng'g at 2nd fl( raised) former computer room, joisting ok...recall prior to pan install. 1/16/2003 4:26:20 PM
BLD-Framing/Rough-in1/9/20031/10/20031/10/2003APART
DetailsCarl Dependahl
ceiling insp scott ###-####, grid ok for tile 1/10/2003 2:53:22 PM
BLD-Conference12/23/200212/23/200212/23/2002PPASS
DetailsCarl Dependahl
W? Kevin Schultz...seal all shaft penetrations 12/23/2002 3:29:42 PM
BLD-Conference12/4/200212/5/200212/5/2002PPASS
DetailsCarl Dependahl
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...w/arch... 12/5/2002 4:09:43 PM
BLD-Framing/Rough-in12/2/200212/2/200212/2/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/02/2002 at 07:05:01. Contact: ###-####...partition walls ok to cover, need firestop or seal rated assy's at shafts & exit enclosures 12/2/2002 1:28:48 PM
BLD-Framing/Rough-in11/13/200211/15/200211/15/2002APART
DetailsJim Storey
###-#### ###-#### fire stopping in restarooms at tile wyanes coat. 11/15/2002 1:27:58 PM
Override - Parcel Holds  11/13/2002  
Override - Parcel Holds  11/13/2002  
Override - Parcel Holds  11/13/2002  
BLD-Conference11/5/200211/5/200211/5/2002PPASS
DetailsCarl Dependahl
Scott...c/n issued r 11/5/02 3:17:05 PM e shaft openings & penetrations 11/5/02 3:17:27 PM
Issue & PRINT permit  8/23/2002 DONE
Plan assigned to (DRS)6/13/20026/13/20027/8/2002 PASS
DetailsDan Stuart
7/8/2002 09:03:41 DRS - activity updated through activity BLDA022 from case BLD02-01532.
Routing - PLAN CHECK6/29/2002 7/8/2002 PASS
As noted and attached.
PLANS/APPL TAKEN TO FRONT DESK  7/8/2002 PASS
To permit desk for issue.
Inspection Record Card- Bld  7/8/2002 DONE
Print Occupancy Form  7/8/2002 DONE
Telephone call  7/8/2002 DONE
PERMIT READY
Routing - FIRE6/26/2002 6/29/2002 PASS
As noted & attached.
Routing - FIRE6/21/20026/21/20026/26/2002 FAIL
Plan Review Completed(1st rev)  6/26/2002 DONE
Routing - PLAN CHECK6/14/20026/14/20026/21/2002 FAIL
Clarification required. Routing to fire code analyst.
Plan resubmittals requested  6/21/2002 FAIL
Met with Ted Isbell to review. He will re-submit.
Meeting  6/21/2002  
Met with Ted to review plans and clarifications needed.
Routing - PUBLIC WORKS6/13/20026/13/20026/14/2002 CANC
Plans ACCEPTED BY PLAN TECH  6/11/2002 DONE
Application received  6/10/2002