BLD-Aging Inspection | 12/31/2003 | 12/31/2003 | 12/31/2003 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 12/31/2003 | 12/31/2003 | 12/31/2003 | A | PASS |
Tom Arcoraci
|
|
|
Expired by inspector at 12/31/2003 8:57:51 AM
|
BLD-Aging Inspection | 10/23/2003 | 10/23/2003 | 10/23/2003 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 10/23/2003 | 10/23/2003 | 10/23/2003 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/20/2003 | 8/20/2003 | 8/20/2003 | | CANC |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 5/13/2003 12:04:52 PM
|
BLD-Final | 5/12/2003 | 5/13/2003 | 5/13/2003 | P | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 11:56:21 AM. Contact: ###-####. Need all required signatures prior to structual. Reviewed necessary sign offs with contractor. Will re-call. 5/13/2003 2:17:03 PM
|
FIRE-Final Inspection | 3/6/2003 | 3/7/2003 | 3/7/2003 | A | FAIL |
Troy Cobbley
|
|
|
###-#### Need to provide manual shutdown for the ventilation system per UFC 8003.1.4.2 3/7/2003 10:56:20 AM
|
BLD-Final | 2/3/2003 | 2/4/2003 | 2/4/2003 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 12:57:53. Contact: ###-####. needs fire life safty sign off 2/4/2003 4:28:40 PM
|
BLD-Final | 2/3/2003 | 2/4/2003 | 2/3/2003 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 02/03/2003 at 12:54:07. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/03/2003 at 12:56:38.
|
BLD-Other | 10/21/2002 | 10/21/2002 | 10/21/2002 | A | DONE |
Troy Cobbley
|
|
|
I left a correction notice for the general contractor stating that city approved fire sprinkler underground plans would be required and that the piping would need to be inspected prior to burying the piping. The notice was left with one of their employees
|
BLD-Final | 10/1/2002 | 10/2/2002 | 10/2/2002 | A | NR |
Tom Arcoraci
|
|
|
###-#### ###-#### JUAN
|
BLD-Footing | 8/16/2002 | 8/19/2002 | 8/19/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### Randy mti inspecting 8/19/2002 9:54:57 AM
|
(F) Reprint permit | | | 8/19/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 8/16/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/16/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/16/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/16/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Override - Parcel Holds | | | 8/16/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 8/16/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 8/16/2002 | | |
|
|
|
|
Routing - FIRE | 8/15/2002 | | 8/15/2002 | | PASS |
|
|
|
|
Routing - FRONT DESK | 8/15/2002 | | 8/15/2002 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 6/28/2002 | | 8/15/2002 | | DONE |
Mike Otto
|
|
|
|
Plan resubmittals received | | | 8/14/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets "C1", "A1", "P3", "E2". Routed to Mike Otto.
|
Routing - PLAN CHECK | 8/14/2002 | | 8/14/2002 | | PASS |
|
|
|
|
Routing - FIRE | 8/14/2002 | | 8/14/2002 | | FAIL |
|
|
|
resubmittal did not include hydrant or water flow information
|
Plan Reviewer's activity | | | 7/25/2002 | | DONE |
|
|
|
received fax from Ken Condit of Lee Engineering responding to corrections. Building Code items have been satisifed per response but Fire Code issues still pending which include the proposal for the continuous ventilation requirement and for the duration the back-up power will operate. Condit's response forwarded to Dave MIller for his review and comment. MLO
|
Routing - FIRE | 7/11/2002 | | 7/15/2002 | | FAIL |
|
|
|
access issues , hydrant, water flow
|
Plan Review Completed(1st rev) | | | 7/15/2002 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/15/2002 | | 7/15/2002 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/8/2002 | | 7/10/2002 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/28/2002 | | 7/10/2002 | | PASS |
|
|
|
Contacted pdq to take to outside eng. kmm
|
Routing - PLANNING | 7/5/2002 | | 7/8/2002 | | PASS |
|
|
|
Approved per CZC02-6 and as noted on sheet C2/3.
|
Routing - PLUMBING | 7/8/2002 | | 7/8/2002 | | PASS |
|
|
|
ADDITIONAL CROSS CONNECTION PROTECTION MAY BE REQUIRED
|
Routing - Erosion and Sediment | 7/3/2002 | | 7/5/2002 | | PASS |
|
|
|
Waiver from ESC plan requirement approved with conditions attached to plans. ESC permit will be required.
|
Routing - PUBLIC WORKS | 7/1/2002 | | 7/3/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/28/2002 | | 7/1/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/28/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/28/2002 | | DONE |
|
|
|
|
Application received | | | 6/28/2002 | | |
|
|
|
|
Fee Review-notes | 6/28/2002 | 6/28/2002 | | | |
|
|
|
|