Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01584
StatusExpired
Name DOUG RHINEHART
Site Address 1212 N HARTMAN ST
Project NameBench Sewer District
Customer Number 
ePlanReviewNo
Description
Bench Sewer District Hydrogen Sulfide Control Station- To construct a 200 sq.ft. one story, Type VN, fully sprinklered hydrogen sulfide control station which has a 352 sq. ft. basement used for chemical storage. CZC02-00006 This building is classified as an H-7 for the amount of hazardous materials in storage. Fire sprinklers requried by the occupancy classification.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/31/200312/31/200312/31/2003 CANC
DetailsTom Arcoraci
DOC - Permit Expired12/31/200312/31/200312/31/2003APASS
DetailsTom Arcoraci
Expired by inspector at 12/31/2003 8:57:51 AM
BLD-Aging Inspection10/23/200310/23/200310/23/2003 PASS
DetailsTom Arcoraci
BLD-Final10/23/200310/23/200310/23/2003APASS
DetailsTom Arcoraci
BLD-Aging Inspection8/20/20038/20/20038/20/2003 CANC
DetailsTom Arcoraci
FIRE-Final Inspection5/12/20035/13/20035/13/2003APASS
DetailsTroy Cobbley
fire life safety finaled 5/13/2003 12:04:52 PM
BLD-Final5/12/20035/13/20035/13/2003PFAIL
DetailsSteven Webb
Scheduled by a contractor via Hello! on 5/12/2003 at 11:56:21 AM. Contact: ###-####. Need all required signatures prior to structual. Reviewed necessary sign offs with contractor. Will re-call. 5/13/2003 2:17:03 PM
FIRE-Final Inspection3/6/20033/7/20033/7/2003AFAIL
DetailsTroy Cobbley
###-#### Need to provide manual shutdown for the ventilation system per UFC 8003.1.4.2 3/7/2003 10:56:20 AM
BLD-Final2/3/20032/4/20032/4/2003PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 02/03/2003 at 12:57:53. Contact: ###-####. needs fire life safty sign off 2/4/2003 4:28:40 PM
BLD-Final2/3/20032/4/20032/3/2003ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 02/03/2003 at 12:54:07. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 02/03/2003 at 12:56:38.
BLD-Other10/21/200210/21/200210/21/2002ADONE
DetailsTroy Cobbley
I left a correction notice for the general contractor stating that city approved fire sprinkler underground plans would be required and that the piping would need to be inspected prior to burying the piping. The notice was left with one of their employees
BLD-Final10/1/200210/2/200210/2/2002ANR
DetailsTom Arcoraci
###-#### ###-#### JUAN
BLD-Footing8/16/20028/19/20028/19/2002APART
DetailsTom Arcoraci
###-#### Randy mti inspecting 8/19/2002 9:54:57 AM
(F) Reprint permit  8/19/2002  
Override - Parcel Holds  8/16/2002  
Inspection Record Card- Bld  8/16/2002 DONE
Print Occupancy Form  8/16/2002 DONE
Telephone call  8/16/2002 DONE
PERMIT READY AND FEES DUE
Override - Parcel Holds  8/16/2002  
Issue PAID IN FULL permit  8/16/2002 DONE
Override - Parcel Holds  8/16/2002  
Routing - FIRE8/15/2002 8/15/2002 PASS
Routing - FRONT DESK8/15/2002 8/15/2002 DONE
Plan assigned to (MLO)6/28/2002 8/15/2002 DONE
DetailsMike Otto
Plan resubmittals received  8/14/2002 DONE
Received two copies of resubmittal sheets "C1", "A1", "P3", "E2". Routed to Mike Otto.
Routing - PLAN CHECK8/14/2002 8/14/2002 PASS
Routing - FIRE8/14/2002 8/14/2002 FAIL
resubmittal did not include hydrant or water flow information
Plan Reviewer's activity  7/25/2002 DONE
received fax from Ken Condit of Lee Engineering responding to corrections. Building Code items have been satisifed per response but Fire Code issues still pending which include the proposal for the continuous ventilation requirement and for the duration the back-up power will operate. Condit's response forwarded to Dave MIller for his review and comment. MLO
Routing - FIRE7/11/2002 7/15/2002 FAIL
access issues , hydrant, water flow
Plan Review Completed(1st rev)  7/15/2002 FAIL
Routing - PLAN CHECK7/15/2002 7/15/2002 FAIL
Routing - PLAN CHECK7/8/2002 7/10/2002 FAIL
Routing Off Site - STRUCTURAL6/28/2002 7/10/2002 PASS
Contacted pdq to take to outside eng. kmm
Routing - PLANNING7/5/2002 7/8/2002 PASS
Approved per CZC02-6 and as noted on sheet C2/3.
Routing - PLUMBING7/8/2002 7/8/2002 PASS
ADDITIONAL CROSS CONNECTION PROTECTION MAY BE REQUIRED
Routing - Erosion and Sediment7/3/2002 7/5/2002 PASS
Waiver from ESC plan requirement approved with conditions attached to plans. ESC permit will be required.
Routing - PUBLIC WORKS7/1/2002 7/3/2002 PASS
Routing - PLANNING Land Div6/28/2002 7/1/2002 PASS
Plans ACCEPTED BY PLAN TECH  6/28/2002 DONE
Plan routing begun/NEW & ADDTN  6/28/2002 DONE
Application received  6/28/2002  
Fee Review-notes6/28/20026/28/2002