Fee Review-notes | 7/2/2002 | 7/2/2002 | 8/10/2004 | | DONE |
|
|
|
fire permit issued
|
First Notice | | 9/10/2003 | 9/10/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 8/21/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9770 issued 8-21-03 to the Children's Store
|
Permanent Occupancy | | 8/20/2003 | 8/20/2003 | | DONE |
|
|
|
|
BLD-Final | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | PASS |
Russ Owen
|
|
|
austin; Phone #: ###-#### Internet Inspection Request from: Darla Downs Ok perm oc. 8/20/2003 11:34:31 AM
|
BLD-Final | 8/18/2003 | 8/19/2003 | 8/19/2003 | A | FAIL |
Russ Owen
|
|
|
AUSTIN; Phone #: ###-#### Internet Inspection Request from: Darla Downsneed to attach fasteners to studs at shelves went over this with austin. 8/19/2003 10:52:39 AM
|
BLD-Final | 8/1/2003 | 8/1/2003 | 8/1/2003 | P | NR |
Russ Owen
|
|
|
jefferson; Phone #: ###-#### Internet Inspection Request from: Barbara MooreNew plans wanted some screws at 6 foot metal shelves to walls went over plan with person on site. 8/1/2003 4:09:33 PM
|
BLD-Final | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 3:01:02 PM. . needs some bolts in floor plates. 7/31/2003 1:53:56 PM
|
FIRE-Final Inspection | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 7/29/2003 11:51:53 AM
|
BLD-Final | 7/28/2003 | 7/29/2003 | 7/29/2003 | P | PART |
Russ Owen
|
|
|
###-#### austin, C/n given to tennant for bolting racks to floor, lower restroom mirror, remove t-bar ceiling or repair in break room area. Ok for a temp oc.7/29/2003 5:35:46 PM 7/29/2003 5:35:58 PM
|
BLD-Framing/Rough-in | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/16/2003 at 1:05:53 PM. Contact: ###-####.
|
FIRE-Final Inspection | 6/16/2003 | 6/17/2003 | 6/17/2003 | A | FAIL |
Troy Cobbley
|
|
|
austin; Phone #: ###-#### The inspection was for the fire sprinkler portion of the permit. Pendant sprinklers are overspace in numerous locations in the merchandizing areas.A sprinkler pendant needs to be provided in the closet or the ceiling is to be removed. Tire storage in the wharehouse to be less than 5'. Wood storage to be less than 10'. I could not verify a minimum .2 gpm over 130 sq. ft. density sprinkler design as the sticker on the riser is missing. I went over some life safety issues with the tenant 6/17/2003 2:02:30 PM
|
BLD-Framing/Rough-in | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PASS |
Russ Owen
|
|
|
austin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore.ok to cover bathroom. 5/15/2003 4:44:38 PM
|
BLD-Framing/Rough-in | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | PART |
Russ Owen
|
|
|
austin; Phone #: ###-#### Internet Inspection Request from: Annette Moore. needs to complete misc in left rest room other ok. 4/21/2003 3:36:37 PM
|
BLD-Wall cover | 4/17/2003 | 4/18/2003 | 4/18/2003 | P | FAIL |
Russ Owen
|
|
|
austin; Phone #: ###-#### Internet Inspection Request from: Annette Moore. needs electrical insp and shore up 1 area over rest room went over this with Austin told him to recall when done. 4/18/2003 3:58:41 PM
|
BLD-Conference | 3/19/2003 | 3/20/2003 | 3/20/2003 | P | PART |
Russ Owen
|
|
|
JEANNE; Phone #: ###-#### Internet Inspection Request from: Annette Moore. went over front ddoors 3/20/2003 4:43:26 PM
|
Additional plans submitted | | | 3/3/2003 | | PASS |
|
|
|
Tenant wants to use two doors originally indicated as exit doors only with the existing set double doors located at center of tenant space as the main entry. Okay to modify the original layout as long as exit doors have automatic flush bolts on inactive leaf with all door hardware removed and the panic hardware complys with code section 1003.3.1.9, all as allowed by section 1003.3.1.8, exception #3. The remaining leaf will look identical to the active leaf except for hardware and therefore cannot be locked shut against use. Exit signage and illumination to be per section 1003.3.2.10 & 1003.3.2.11, 2000 IBC. Verify all changes for compliance in the field with the fire and structural inspectors.
|
Inspection Record Card- Bld | | | 2/7/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 2/7/2003 | | DONE |
|
|
|
called 2-7-03
|
Issue PAID IN FULL permit | | | 2/7/2003 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 7/3/2002 | | 2/6/2003 | | PASS |
Dan Stuart
|
|
|
2/6/2003 15:30:25 DRS - activity updated through activity BLDA022 from case BLD02-01612.
|
Routing - PLAN CHECK | 2/5/2003 | | 2/6/2003 | | PASS |
|
|
|
Plans approved based on resubmittal comments of 2/5/03 & red-line comments from plan review concerning the door hardware requirements and the attachement of the steel racks to the floor per engineering and wood shelf attachment to the walls per the architect call out. Plan review comments, architects & engineers responses also included with and as part of the approved plans requiring compliance for the tenant to obtain a certificate of occupancy.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2003 | | PASS |
|
|
|
To permit desk to issue. New certificate of value provided - from $2,500.00 to $4,000.00.
|
Plan resubmittals received | | | 2/5/2003 | | DONE |
|
|
|
Received two copies of resubmittal sheets A-1 with (1) Comment Memorandum, (1) TI Application, (1) Rack Calculations and transmittal. Routed to Dan Stuart.
|
Routing - PLAN CHECK | 7/22/2002 | | 12/30/2002 | | FAIL |
|
|
|
Resubmittals & clarifications of 12/23/02 incomplete. Fax sent to Tim Perry, BRS architects stating remaining items needed submitted.
|
Plan resubmittals requested | | | 12/30/2002 | | FAIL |
|
|
|
Plan modifications submitted make changes to scope of work; application and certificate of value that require additional new submittals. Copy of corrections & clarifications required faxed & mailed to architect.
|
Plan resubmittals received | | | 12/23/2002 | | DONE |
|
|
|
Received two copies of revised floor plans sheet A-1 onew copy of Stapley engineering pallet rack study and one copy of DeBest fire protection system analysis letter. Routed to Dan S. kmm
|
Plan Review Completed(1st rev) | | | 7/22/2002 | | FAIL |
|
|
|
|
Routing - FIRE | 7/17/2002 | | 7/22/2002 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 7/17/2002 | | FAIL |
|
|
|
Copy of plan review comments requiring response from architect faxed and mailed to Tim Perry, BRS.
|
Routing - PLAN CHECK | 7/3/2002 | | 7/17/2002 | | FAIL |
|
|
|
Clarifications & resubmittals required. To fire code analyst while waitng for architects response.
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2002 | | DONE |
|
|
|
|
Application received | | | 7/2/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2002 | | DONE |
|
|
|
|