Second Notice BLD | 7/13/2005 | 7/13/2005 | 7/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/7/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 6/7/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10630 issued 6-7-05 to Idaho Self Storage.
|
(F) Reprint permit | | | 6/3/2005 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 6/13/2003 | 6/13/2003 | 6/13/2003 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 6/13/03. J.Wyllie
|
BLD-Final | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | PASS |
Jim Sly
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Perm Occ. OK. 6/10/2003 12:02:27 PM
|
Permanent Occupancy | | 6/3/2003 | 6/3/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/24/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/21/2003 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | CANC |
Troy Cobbley
|
|
|
rob; Phone #: ###-#### Permit already has a fire life safety finaled 2/20/2003 2:08:31 PM
|
BLD-Framing/Rough-in | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | PASS |
Jim Sly
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 2/7/2003 10:00:19 AM
|
BLD-Final | 2/6/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 5:16:26 PM. Office and upstairs residence finals are ok--Building permits for prior listed occupancies tied to storage units which are not ready to final. 2/7/2003 3:39:52 PM
|
BLD-Framing/Rough-in | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Energy code compliance | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | FAIL |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung NR frame (rock at 1hr). 12/20/2002 2:51:43 PM
|
BLD-Framing/Rough-in | 12/17/2002 | 12/18/2002 | 12/18/2002 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | PART |
Jim Sly
|
|
|
###-#### Shear for main bldg and storage behind....OK. 12/2/2002 1:28:28 PM
|
BLD-Conference | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | PART |
Jim Sly
|
|
|
###-####
|
BLD-Conference | 11/18/2002 | 11/18/2002 | 11/18/2002 | P | PART |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 11/5/2002 | 11/6/2002 | 11/6/2002 | A | PART |
Jim Sly
|
|
|
shear- rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Roof shear. 11/6/2002 9:11:43 AM
|
BLD-Framing/Rough-in | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | NR |
Dave Hannah
|
|
|
rob--grout insp-bld a-; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie they will use spec insp 10/15/2002 1:18:40 PM
|
BLD-Foundation | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | CANC |
Dave Hannah
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Foundation | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PART |
Dave Hannah
|
|
|
office area
|
BLD-Footing | 9/26/2002 | 9/26/2002 | 9/26/2002 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung center cmu wall ftg and office area 9/26/2002 1:38:41 PM
|
BLD-Foundation | 9/24/2002 | 9/25/2002 | 9/25/2002 | P | PASS |
Dave Hannah
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 9/23/2002 | 9/24/2002 | 9/24/2002 | A | NR |
Jim Sly
|
|
|
###-####
|
BLD-Footing | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | PART |
Dave Hannah
|
|
|
###-####OK to pour west north and east footing and about 8ft on each end of south 9/24/2002 2:47:40 PM
|
BLD-Final | 9/12/2002 | 9/13/2002 | 9/13/2002 | A | CANC |
Russ Owen
|
|
|
john ###-####
|
(F) Reprint permit | | | 9/6/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/5/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/3/2002 | | 9/4/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2002 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/4/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2002 | | DONE |
|
|
|
permit ready and need ACHD
|
Plan assigned to (JCM) | 7/9/2002 | | 9/4/2002 | | PASS |
John Menard
|
|
|
9/4/2002 10:52:36 JCM - activity updated through activity BLDA022 from case BLD02-01629.
|
Routing - PLANNING | 8/29/2002 | | 9/3/2002 | | PASS |
|
|
|
Approved per DRH02-125 and per revised landscape plans dated received 9/3/02.
|
Plan resubmittals received | | | 8/30/2002 | | DONE |
|
|
|
Received three copies of revised sheets A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A6.0, M1.0, S0.1, S1.1, S1.2. One copy of response letter, four copies of structural design calculations. Routed to John M. kmm
|
Routing - PLANNING Land Div | 8/29/2002 | | 8/29/2002 | | PASS |
|
|
|
Ada Cty ROS 5844
|
Routing - PLAN CHECK | 8/16/2002 | | 8/27/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/27/2002 | | FAIL |
|
|
|
E-mailed the architect of record a letter requesting additional resubmittals and information. JCM
|
Routing - FIRE | 8/27/2002 | | 8/27/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 8/22/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A1.0, A1.2, A1.2, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A5.0, A6.0, A7.0, E1.0, M1.0, S0.1, S1.1, S1.2, and five sets of resubmittal sheets C-1.0, C-1.1, C-1.2, C-2.0, C-3.0, C-4.0 with cover letter and transmittal. Routed to John Menard.
|
Routing - PUBLIC WORKS | 8/14/2002 | | 8/16/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/2/2002 | | 8/5/2002 | | FAIL |
|
|
|
Drainage plan does not meet mimimun criteria established in Boise City Storm Water Design Manual. Per Brian M. kmm
|
Plan Review Completed(1st rev) | | | 8/2/2002 | | DONE |
|
|
|
|
Routing - FIRE | 7/30/2002 | | 8/2/2002 | | FAIL |
Bill Alexander
|
|
|
Require fire flow information ceritification (plus).
|
Plan resubmittals requested | | | 7/30/2002 | | FAIL |
|
|
|
Mailed the architect of record a copy of the comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 7/23/2002 | | 7/30/2002 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/22/2002 | | 7/23/2002 | | PASS |
|
|
|
See attached
|
Routing - PLANNING | 7/16/2002 | | 7/22/2002 | | FAIL |
|
|
|
Routed plans to Scott S. for cup, then spoke with Tempra about the DR, because Sarah is out of town. She stated, either Marty or she will reivew for the DR. kmm
Failed to meet condition of approvcal, Mark Peccheninio. Condition of approval 4) Prior to the issuance of a building permit the applicant shall provide the Boise City Planning and Development Services a recorded density reduction and record of survey for parcels R1580902530 (10856 W. Fairview, 1.834 acres), R1580902150 (10836 W. Fairview, .661 acres), and R1580902155 (10832 W. Fairview, 3.998 acres) as indicated on the plans, specifications and drawings submitted and date stamped received December 18, 2001.
Failed to meet conditions of approval. Also, building footprints have changed enough to require a Staff Level Design Review Modification. Chip Gallagher has been contacted.
|
Routing - Erosion and Sediment | 7/15/2002 | | 7/16/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plan
|
Routing - PUBLIC WORKS | 7/9/2002 | | 7/15/2002 | | FAIL |
|
|
|
Drainage plan does not meet minimum criteria established in Boise City Storm Water Design Manual. Per Jim Wiley. kmm
|
Routing - PLANNING Land Div | 7/9/2002 | | 7/9/2002 | | FAIL |
|
|
|
need legal descriptions and deeds
|
Pending Assignment by JCM | 7/8/2002 | | 7/9/2002 | | DONE |
John Menard
|
|
|
7/9/2002 11:48:15 JCM - activity updated through activity BLDA166 from case BLD02-01629.
|
Plans ACCEPTED BY PLAN TECH | | | 7/8/2002 | | DONE |
|
|
|
Received (3) extra sets of Civil Drawings, Structural Calculations, and Drainage Calculations. Attached to Plans.
|
Override - Parcel Holds | | | 7/8/2002 | | |
|
|
|
|
Application received | | | 7/5/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 7/5/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 7/5/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2002 | | HOLD |
|
|
|
Informed applicant that structural calculations, drainage calculations, and (3) extra copies of civil drawings are required before routing.
|
Fee Review-notes | 7/5/2002 | 7/5/2002 | | | |
|
|
|
|