Second Notice BLD | 5/25/2006 | 5/25/2006 | 5/25/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 4/10/2006 | 4/10/2006 | 5/25/2006 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Jim Sly
|
|
|
Previously Finaled
|
DOC - Permit Finaled | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Jim Sly
|
|
|
|
First Notice | | 6/12/2003 | 6/12/2003 | | DONE |
|
|
|
|
BLD-Final | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | PASS |
Jim Sly
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Perm Occ. OK 6/10/2003 12:00:38 PM
|
Permanent Occupancy | | 6/9/2003 | 6/9/2003 | | DONE |
|
|
|
|
BLD-Final | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PART |
Jim Sly
|
|
|
###-#### C 2/24/2003 5:19:55 PM OK for temp occ. C/N Need perm within 90 days. 2/24/2003 5:20:42 PM
|
BLD-Final | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | FAIL |
Jim Sly
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie NR 2/21/2003 3:30:27 PM
|
FIRE-Final Inspection | 2/20/2003 | 2/20/2003 | 2/20/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 2/20/2003 2:09:17 PM
|
BLD-Framing/Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/31/2003 at 9:03:42 AM. Contact: ###-####.
|
BLD-Foundation | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PASS |
Dave Hannah
|
|
|
found wall darrin ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 10/29/2002 | 10/29/2002 | 10/29/2002 | P | PART |
Tom Arcoraci
|
|
|
darrin ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie south end open 10/29/2002 3:37:48 PM
|
BLD-Footing | 10/25/2002 | 10/25/2002 | 10/25/2002 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson north 2/3rds ok to pour 10/25/2002 2:12:28 PM
|
(F) Reprint permit | | | 10/25/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/24/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/3/2002 | | 9/4/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2002 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/4/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2002 | | DONE |
|
|
|
permit ready and need ACHD
|
Plan assigned to (JCM) | 7/9/2002 | | 9/4/2002 | | PASS |
John Menard
|
|
|
9/4/2002 10:53:23 JCM - activity updated through activity BLDA022 from case BLD02-01630.
|
Routing - PLANNING | 8/29/2002 | | 9/3/2002 | | PASS |
|
|
|
Approved per DRH02-125 and per revised landscape plans dated received 9/3/02.
|
Plan resubmittals received | | | 8/30/2002 | | DONE |
|
|
|
Received three copies of revised sheets A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A6.0, M1.0, S0.1, S1.1, S1.2. One copy of response letter, four copies of structural design calculations. Routed to John M. kmm
|
Routing - PLANNING Land Div | 8/28/2002 | | 8/29/2002 | | PASS |
|
|
|
Ada Cty ROS #5844
|
Routing - FIRE | 8/27/2002 | | 8/28/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 8/27/2002 | | FAIL |
|
|
|
E-mailed the architect of record a letter requesting additional revisions and information. JCM
|
Routing - PLAN CHECK | 8/16/2002 | | 8/27/2002 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 8/22/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A1.0, A1.2, A1.2, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A5.0, A6.0, A7.0, E1.0, M1.0, S0.1, S1.1, S1.2, and five sets of resubmittal sheets C-1.0, C-1.1, C-1.2, C-2.0, C-3.0, C-4.0 with cover letter and transmittal. Routed to John Menard.
|
Routing - PUBLIC WORKS | 8/14/2002 | | 8/16/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/2/2002 | | 8/5/2002 | | FAIL |
|
|
|
Drainage plan does not meet mimimun criteria established in Boise City Storm Water Design Manual. Per Brian M. kmm
|
Plan Review Completed(1st rev) | | | 8/2/2002 | | DONE |
|
|
|
|
Routing - FIRE | 7/30/2002 | | 8/2/2002 | | FAIL |
Bill Alexander
|
|
|
Require fire flow information ceritification (plus).
|
Plan resubmittals requested | | | 7/30/2002 | | FAIL |
|
|
|
Mailed the architect of record a copy of the comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 7/23/2002 | | 7/30/2002 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/22/2002 | | 7/23/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 7/16/2002 | | 7/22/2002 | | FAIL |
|
|
|
Failed because conditions of approval have not been met. Specifically the landscaping. Also, enough changes have been made to the buiding footprints that a Staff Level Design Review Modification is required. Chip Gallagher has been contacted.
|
Routing - Erosion and Sediment | 7/15/2002 | | 7/16/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans
|
Routing - PUBLIC WORKS | 7/9/2002 | | 7/15/2002 | | FAIL |
|
|
|
Drainage plan does not meet minimum criteria established in Boise City Storm Water Design Manual. Per Jim Wiley. kmm
|
Routing - PLANNING Land Div | 7/9/2002 | | 7/9/2002 | | FAIL |
|
|
|
need legal descriptions and deeds
|
Pending Assignment by JCM | 7/8/2002 | | 7/9/2002 | | DONE |
John Menard
|
|
|
7/9/2002 11:48:58 JCM - activity updated through activity BLDA166 from case BLD02-01630.
|
Plans ACCEPTED BY PLAN TECH | | | 7/8/2002 | | DONE |
|
|
|
Received (3) extra sets of Civil Drawings, Structural Calculations, and Drainage Calculations. Attached to Plans.
|
Override - Parcel Holds | | | 7/8/2002 | | |
|
|
|
|
Application received | | | 7/5/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 7/5/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 7/5/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2002 | | HOLD |
|
|
|
Informed applicant that structural calculations, drainage calculations, and (3) extra copies of civil drawings are required before routing.
|
Fee Review-notes | 7/5/2002 | 7/5/2002 | | | |
|
|
|
|