Fee Review-notes | 7/5/2002 | 7/5/2002 | 8/10/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/12/2003 | 8/12/2003 | 8/12/2003 | | DONE |
|
|
|
|
First Notice | | 6/11/2003 | 6/11/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/11/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9682 issued 6-11-03 to Idaho Self Storage.
|
Permanent Occupancy | | 6/9/2003 | 6/9/2003 | | DONE |
|
|
|
|
BLD-Final | 6/9/2003 | 6/9/2003 | 6/9/2003 | P | PASS |
Jim Sly
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Perm Occ. OK. 6/10/2003 12:04:21 PM
|
FIRE-Final Inspection | 4/7/2003 | 4/7/2003 | 4/7/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 4/7/2003 3:42:36 PM
|
BLD-Final | 4/7/2003 | 4/7/2003 | 4/7/2003 | P | PART |
Jim Sly
|
|
|
ROB; Phone #: ###-#### Internet Inspection Request from: Darla Downs OK for Temp.....bond for landsca. 4/8/2003 10:06:30 AM
|
BLD-Framing/Rough-in | 3/18/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Jim Sly
|
|
|
###-####
|
BLD-Framing/Rough-in | 10/15/2002 | 10/15/2002 | 10/15/2002 | P | NR |
Dave Hannah
|
|
|
rob--grout insp-bld h; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie they will use spec inspection 10/15/2002 1:19:36 PM
|
BLD-Foundation | 10/9/2002 | 10/9/2002 | 10/9/2002 | P | PASS |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Footing | 10/2/2002 | 10/2/2002 | 10/2/2002 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Foundation | 10/1/2002 | 10/1/2002 | 10/1/2002 | P | PASS |
Dave Hannah
|
|
|
jay ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
(F) Reprint permit | | | 10/1/2002 | | |
|
|
|
|
BLD-Footing | 9/30/2002 | 9/30/2002 | 9/30/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### rob
|
(F) Reprint permit | | | 9/30/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/30/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/3/2002 | | 9/4/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/4/2002 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/4/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/4/2002 | | DONE |
|
|
|
permit ready and need ACHD
|
Plan assigned to (JCM) | 7/9/2002 | | 9/4/2002 | | PASS |
John Menard
|
|
|
9/4/2002 10:59:11 JCM - activity updated through activity BLDA022 from case BLD02-01637.
|
Routing - PLANNING | 8/29/2002 | | 9/3/2002 | | PASS |
|
|
|
Approved per DRH02-125 and per revised landscape plans dated received 9/3/02.
|
Plan resubmittals received | | | 8/30/2002 | | DONE |
|
|
|
Received three copies of revised sheets A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A6.0, M1.0, S0.1, S1.1, S1.2. One copy of response letter, four copies of structural design calculations. Routed to John M. kmm
|
Routing - PLANNING Land Div | 8/28/2002 | | 8/29/2002 | | PASS |
|
|
|
Ada Cty ROS 5844
|
Routing - FIRE | 8/27/2002 | | 8/28/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 8/27/2002 | | FAIL |
|
|
|
E-mailed the architect of record a letter requesting revisions, JCM
|
Routing - PLAN CHECK | 8/16/2002 | | 8/27/2002 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 8/22/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A1.0, A1.2, A1.2, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A5.0, A6.0, A7.0, E1.0, M1.0, S0.1, S1.1, S1.2, and five sets of resubmittal sheets C-1.0, C-1.1, C-1.2, C-2.0, C-3.0, C-4.0 with cover letter and transmittal. Routed to John Menard.
|
Routing - PUBLIC WORKS | 8/14/2002 | | 8/16/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/5/2002 | | 8/14/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 8/2/2002 | | 8/5/2002 | | FAIL |
|
|
|
Drainage plan does not meet mimimun criteria established in Boise City Storm Water Design Manual. Per Brian M. kmm
|
Plan Review Completed(1st rev) | | | 8/2/2002 | | DONE |
|
|
|
|
Routing - FIRE | 7/30/2002 | | 8/2/2002 | | FAIL |
Bill Alexander
|
|
|
Require fire flow information ceritification (plus).
|
Plan resubmittals requested | | | 7/30/2002 | | FAIL |
|
|
|
Mailed the architect of record a copy of the comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 7/23/2002 | | 7/30/2002 | | FAIL |
|
|
|
|
Routing - PLUMBING | 7/22/2002 | | 7/23/2002 | | PASS |
|
|
|
see attached
|
Routing - PLANNING | 7/16/2002 | | 7/22/2002 | | FAIL |
|
|
|
See BLD02-01629.
|
Routing - Erosion and Sediment | 7/15/2002 | | 7/16/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plan
|
Routing - PUBLIC WORKS | 7/9/2002 | | 7/15/2002 | | FAIL |
|
|
|
Drainage plan does not meet minimum criteria established in Boise City Storm Water Design Manual. Per Jim Wiley. kmm
|
Pending Assignment by JCM | 7/8/2002 | | 7/9/2002 | | DONE |
John Menard
|
|
|
7/9/2002 11:52:53 JCM - activity updated through activity BLDA166 from case BLD02-01637.
|
Routing - PLANNING Land Div | 7/9/2002 | | 7/9/2002 | | FAIL |
|
|
|
need legal descriptions and deeds
|
Plans ACCEPTED BY PLAN TECH | | | 7/8/2002 | | DONE |
|
|
|
Received (3) extra sets of Civil Drawings, Structural Calculations, and Drainage Calculations. Attached to Plans.
|
Override - Parcel Holds | | | 7/8/2002 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/5/2002 | | HOLD |
|
|
|
Informed applicant that structural calculations, drainage calculations, and (3) extra copies of civil drawings are required before routing.
|
Application received | | | 7/5/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 7/5/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/5/2002 | | |
|
|
|
|