Plan Review Report | | | 3/26/2013 | | |
|
|
|
|
Fee Review-notes | 8/12/2003 | 8/12/2003 | 8/12/2003 | | DONE |
|
|
|
Additional values from subcontractors.
(Submitted project value was $100,000. Revised Initial Project Value was $86,605. Initial Plan check fees paid were based on $100,000 value. Additional values from subcontractors was $63,946 less $13,395 for difference between submitted and revised intial project value = $50,551).
|
Permanent Occupancy | | 1/17/2003 | 1/17/2003 | | DONE |
|
|
|
|
BLD-Final | 1/16/2003 | 1/17/2003 | 1/17/2003 | P | PASS |
Carl Dependahl
|
|
|
tarrie; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...c/n ok, ok for c/o. 1/17/2003 3:17:34 PM
|
Permanent occupancy | | | 1/17/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9531 issued 1-17-03 to the Bittercreek Alehouse (addn.)
|
FIRE-Final Inspection | 12/23/2002 | 12/23/2002 | 12/23/2002 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 09:05:50. Contact: ###-####.
|
BLD-Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | P | FAIL |
Carl Dependahl
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie; c/n handrails, rec'd spec insp reports; ok for t/o, 90 days 12/20/2002 5:00:40 PM
|
BLD-Conference | 12/19/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Carl Dependahl
|
|
|
need to return spiral stair rails, extensions as needed...ok not to extend rail into doorways.
|
FIRE-Final Inspection | 12/17/2002 | 12/18/2002 | 12/18/2002 | A | PART |
Rick Jackson
|
|
|
###-####-todd temp approved per Dave Miller; need to test the alarms for the entire building 12/18/2002 1:40:35 PM
|
BLD-Final | 12/17/2002 | 12/18/2002 | 12/18/2002 | P | CANC |
Carl Dependahl
|
|
|
todd-###-####
|
BLD-Final | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 12/16/2002 at 10:28:20. Contact: ###-####....NR, need fire/alarms ok'd, complete railings, etc. no further insp. 12/16/2002 2:08:00 PM
|
BLD-Conference | 10/31/2002 | 11/5/2002 | 11/5/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Todd & Dave Dechambeau...flash hood & shaft, spiral stairs to have min headroom... 11/5/02 4:46:11 PM
|
BLD-Conference | 10/31/2002 | 10/31/2002 | 10/31/2002 | P | PASS |
Carl Dependahl
|
|
|
need full 6'6" headroom at stairs
|
BLD-Conference | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/30/2002 at 10:03:31. Contact: ###-####....keep c/n re stairs to Mezzanine. wip on spiral stair...chk min 6-6 headroom...max 9.5" rise allowed 10/31/2002 2:20:00 PM
|
BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/28/2002 at 15:40:16. Contact: ###-####....part, need change stairs to mezz...ok to add duct wrap at horiz. portion of grease duct prior to shaft...maintain clearances 10/29/02 5:00:11 PM
|
BLD-Framing/Rough-in | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/17/2002 at 11:48:05. Contact: ###-####. left msg,..no response. 10/18/02 10:13:19 AM kitch 1/2 wall ok 10/18/02 2:44:02 PM
|
BLD-Conference | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | PASS |
Carl Dependahl
|
|
|
Todd...exit path must be separated from "storage" rooms. 10/14/02 11:01:39 AM
|
BLD-Conference | 10/10/2002 | 10/11/2002 | 10/11/2002 | A | PASS |
Carl Dependahl
|
|
|
11am Tarrie...ok to move bsmt door...maintain accessibility 10/11/02 1:36:52 PM
|
BLD-Conference | 10/10/2002 | 10/11/2002 | 10/10/2002 | A | CANC |
Carl Dependahl
|
|
|
Tarrie 11am
|
BLD-Conference | 10/10/2002 | 10/11/2002 | 10/10/2002 | A | PASS |
Carl Dependahl
|
|
|
w/ arch re bsmt exit path 10/10/02 4:04:03 PM
|
BLD-Framing/Rough-in | 10/8/2002 | 10/9/2002 | 10/9/2002 | A | PART |
Carl Dependahl
|
|
|
TODD...wall behind kitch appliances at main fl. ok to cover pending plbg r/i ok'd. 10/9/02 10:53:06 AM
|
BLD-Framing/Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 9/17/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Carl Dependahl
|
|
|
Todd, MTI to report for deck/slab... 9/18/2002 7:03:27 PM
|
BLD-Concrete | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 10:58:44. Contact: ###-####....pan, welding & deck under spec insp. 9/17/2002 4:32:23 PM
|
BLD-Footing | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 12:23:06. Contact: ###-####...isolated ftgs for mezzanine in bsmt...ok 8/29/2002 4:13:47 PM
|
Inspection Record Card- Bld | | | 8/21/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/21/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2002 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/12/2002 | | 8/20/2002 | | PASS |
Carl Westfall
|
|
|
8/20/2002 16:05:27 CJW - activity updated through activity BLDA022 from case BLD02-01674.
|
Routing - PLAN CHECK | 8/19/2002 | | 8/20/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2002 | | PASS |
|
|
|
|
Routing - FIRE | 8/16/2002 | | 8/19/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/2/2002 | | 8/16/2002 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
Plan resubmittals received | | | 8/8/2002 | | DONE |
|
|
|
Received two copies of revised sheets A2.2 & M3.0 one copy of response letter and two copies of sheet 81/2 x 11, 601. Routed to Carl W. kmm
|
Routing - FIRE | 7/30/2002 | | 8/2/2002 | | |
|
|
|
Failed first UFC review. UBC - UFC related issues. Include-revised plans with smoke/fire damper installation.
|
Plan Review Completed(1st rev) | | | 8/2/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/17/2002 | | 7/30/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started July 25, 2002 and finished July 30, 2002. A response from the architect was required. See the conditions report.
|
Received Certificate of Value | | | 7/23/2002 | | DONE |
|
|
|
received revised cert. of value which shows the new value minus the demo value. Routed to Carl W.
|
Routing - PLUMBING | 7/16/2002 | | 7/17/2002 | | PASS |
|
|
|
no indirect waste receptor will be allowed under or within a cabinet, if an automatic soap dispensor is to be installed at the janitor sink provide a water supply for it, extend a 2" waste to the wait station on the mezzanine, additional cross connection protection may be required.
|
Routing - PUBLIC WORKS | 7/12/2002 | | 7/16/2002 | | PASS |
|
|
|
|
First Notice | 7/10/2002 | 7/10/2002 | 7/10/2002 | | DONE |
|
|
|
missed a cooler on plans--need to check if owner supplied equipment
|
Plans ACCEPTED BY PLAN TECH | | | 7/10/2002 | | PASS |
|
|
|
CDH approval by Bob Jue on 7/3/02.
|
Application received | | | 7/10/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/10/2002 | | DONE |
|
|
|
|