Permit Information
Permit NumberBLD02-01682
StatusFinaled
Name HEWLETT-PACKARD CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #6 - NPCR EXPANSION
Customer Number 
ePlanReviewNo
Description
(HEWLETT PACKARD BLDG. #6-EAST) (Phase II Expansion and Tenant Improvement) Within the existing 70,000 sq. ft. first floor, to remodel an additional 6,317 sq. ft.for use as "H-6" occupancy, adding to existing the 16,612 sq. ft."H-6" Fab Nickle Plating & Clean Room. The project includes site improvements for electrical and mechanical systems and interior modifications and additions to the electrical, mechanical, plumbing, process piping for chemicals, structural upgrades, fire sprinkler and alarm systems for the expansion of the HP-6, NPCR processes. This building is fully sprinklered for allowable area increase. PC# 441-02/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/7/20067/7/20067/7/2006 DONE
First Notice has not been responded to.
First Notice5/24/20065/24/20067/7/2006 DONE
DetailsJim Sly
BLD-Aging Inspection5/22/20065/22/20065/24/2006 PASS
DetailsJim Sly
Previously passed by 316
DOC - Permit Finaled5/24/20065/24/20065/24/2006PPASS
DetailsJim Sly
(F) Reprint permit  5/6/2003 DONE
BLD-Final1/9/20031/10/20031/10/2003PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 01/09/2003 at 09:54:06. Contact: ###-####. OK for Perm. 1/10/2003 3:55:46 PM
Letter of compliance  1/10/2003 DONE
Letter of Compliance #22798 issued 1-10-03.
FIRE-Final Inspection1/7/20031/9/20031/9/2003APASS
DetailsTroy Cobbley
fire life safety finaled 1/9/2003 4:41:31 PM
BLD-Framing/Rough-in11/25/200211/26/200211/26/2002APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/25/2002 at 08:19:06. Contact: ###-####. 11/26/2002 10:46:12 AM
BLD-Framing/Rough-in9/11/20029/12/20029/12/2002APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 09/11/2002 at 10:04:35. Contact: ###-####. Structural steel frame (wall support) and south wall at area well expansion OK to cover....Need special insp approval for welding and bolting. 9/12/2002 11:50:22 AM
Issue PAID IN FULL permit  8/27/2002 DONE
Inspection Record Card- Bld  8/21/2002 DONE
Print Occupancy Form  8/21/2002  
Telephone call  8/21/2002 DONE
Routing - PLANNING8/16/2002 8/20/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/20/2002 PASS
To permit desk for issue.
Plan assigned to (DRS)7/12/2002 8/20/2002 PASS
DetailsDan Stuart
8/20/2002 15:36:08 DRS - activity updated through activity BLDA022 from case BLD02-01682.
Routing - PLAN CHECK8/6/2002 8/20/2002 PASS
Approved as noted and attached plan review conditions.
Routing - FIRE  8/16/2002 PASS
Routing - Erosion and Sediment8/12/2002 8/14/2002 PASS
Plan originally routed to ESC for review an failed because no plan for ESC was included. Resubmittals were presented on the 28 of July for ESC. The Chiller Building will not be constructed (non-sprinklered) as other HP buildings and is a separate building therefore a separate permit is created for the Chiller Building, BLD02-01947 and that is the permit for which the ESC is required. I expalined this to Jim Rogers and gave him the resubmittals for review.
Routing - PLUMBING7/24/2002 8/6/2002 PASS
double check valve changed to rp per engineer.
Plan resubmittals received  7/29/2002 DONE
Received two sets of Erosion & Sediment Control Plans with narrative. Routed to Dan Stuart.
Additional plans submitted  7/28/2002  
Additional plans received for ESC plan. New permit created for the HP Chiller Building addition as this is a separate building and this building will not be sprinklered as the other complex is. Plans with new BLD02-01947 routed to Jim Rogers.
Routing - Erosion and Sediment7/22/2002 7/24/2002 FAIL
No ESC plans submitted for review.
Routing - PLANNING7/24/2002 7/24/2002 FAIL
Applicant needs to receive DR approval (is submitting application today).
Routing - PUBLIC WORKS7/16/2002 7/22/2002 PASS
Received Certificate of Value  7/19/2002 DONE
Received revised cert. of value. Put copy in file and one to Dan S. kmm
Plan resubmittals requested  7/16/2002 FAIL
Third party structural review completed. Further resubmittals required. Faxed and mailed copy of engineering report to Tom Brophy for response.
Routing Off Site - STRUCTURAL7/11/2002 7/16/2002 FAIL
Contacted pdq to take plans to outside eng. kmm
7/16/02 - Received report from outside engineering firm of items needing additional attention. Faxed and mailed copy of report to Tom Brophy, LCA, for response.
8/14/02-Received plans back from AHJ. routed to dan stuart.
Routing - PLANNING Land Div7/15/2002 7/16/2002 PASS
Plans ACCEPTED BY PLAN TECH  7/12/2002 DONE
Received third set of plans. Still waiting on (2) Erosion & Sediment Control Plans with narrative and (1) O&M Letter for public works. Will start routing.
First Notice7/11/20027/11/20027/11/2002 DONE
equipment values are not included in these values need to call for the values
Application received  7/11/2002 DONE