Permit Information
Permit NumberBLD02-01686
StatusFinaled
Name XAYAMAHAKHAM, ATH AND JUNE
Site Address 10997 W SOUTHERLAND ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, two and three quarter bathroom 2934 sq. ft. two story single family dwelling (1863 sq. ft. first floor/1071 sq. ft. second floor) with a attached 856 sq. ft. three car garage. Per approved plans, engineering and requirement list. This is a shade and solar protected lot. PC#421 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/18/20033/19/20033/19/2003APASS
DetailsRuss Owen
ATH; Phone #: ###-#### Internet Inspection Request from: Annette Moore
DOC - Permit Finaled3/19/20033/19/20033/19/2003APASS
DetailsRuss Owen
Finaled by inspector at 3/19/2003 10:16:36 AM
BLD-Final3/18/20033/18/20033/18/2003PFAIL
DetailsRuss Owen
###-####
BLD-Energy code compliance12/4/200212/4/200212/4/2002PPASS
DetailsJim Sly
###-#### william Frame OK. 12/4/2002 4:47:05 PM
BLD-Framing/Rough-in11/29/200212/2/200212/2/2002ACANC
DetailsRuss Owen
JUNE; Phone #: ###-#### Internet Inspection Request from: Darla Downs. need insulation complete prior. 12/2/2002 12:37:44 PM
BLD-Framing/Rough-in11/27/200211/27/200211/27/2002PFAIL
DetailsRuss Owen
c/n posted also there is to be no drywall untill the gas test is passed, I have told this to mec contractor. 11/27/2002 2:18:26 PM
BLD-Framing/Rough-in11/22/200211/25/200211/25/2002ANH
DetailsSteven Webb
###-#### C/N No access-house locked up -- telephones 2 numbers--not answer--recall. 11/25/2002 9:10:24 AM
BLD-Framing/Rough-in11/25/200211/25/200211/25/2002PNR
DetailsSteven Webb
###-#### C/N posted--Partial inspection only--Do not insulate. 11/25/2002 1:43:39 PM
BLD-Framing/Rough-in11/20/200211/20/200211/20/2002PNR
DetailsRuss Owen
fr jack- ###-#### . Needs foam seal package, truss details in order, noted some missing they had recovered them from the trash,also needs a gas test .c/n posted.11/20/2002 4:56:20 PM 11/20/2002 5:08:15 PM
BLD-Framing/Rough-in10/29/200210/30/200210/30/2002APASS
DetailsRuss Owen
ok to side. 10/30/2002 9:51:12 AM
BLD-Framing/Rough-in10/29/200210/29/200210/29/2002PPART
DetailsRuss Owen
###-####. went over rear wall hds requirements with engineer, they are now in place, this plan is very confused, and should have been sent back and resubmitted correctyly so that foundation contractor could have installed hds with no confusion. I have spent over an hour here today as well as prior inspections. Also house papered with out approvals. 10/29/2002 4:41:54 PM
BLD-Framing/Rough-in10/25/200210/28/200210/28/2002ANR
DetailsRuss Owen
ATH; Phone #: ###-#### Internet Inspection Request from: Darla Downsn 10/28/2002 9:37:11 AM need plans on site also some one to be on site for inspection. 10/28/2002 9:38:01 AM
BLD-Wall cover10/25/200210/25/200210/25/2002PFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/25/2002 at 11:23:41. Contact: ###-####. See corr on site. 10/25/2002 3:24:08 PM
BLD-Framing/Rough-in10/21/200210/21/200210/21/2002PFAIL
DetailsRuss Owen
###-####posted c/n. 10/21/2002 3:10:30 PM
BLD-Conference10/18/200210/18/200210/18/2002PFAIL
DetailsRuss Owen
Stoped by job and found no recored of approval to cover exterior called builder and informed. he will call for inspection house has been papered for stucco. 10/18/2002 2:38:43 PM
BLD-Foundation8/12/20028/13/20028/13/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/12/2002 at 16:21:28. Contact: ###-####.wip. 8/13/2002 9:48:51 AM
BLD-Footing8/9/20028/9/20028/9/2002PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/09/2002 at 07:28:32. Contact: ###-####. wip. 8/9/2002 2:51:53 PM
Issue PAID IN FULL permit  7/31/2002 DONE
Print Pending Permit.LaserJet4  7/30/2002  
Plan Review Report  7/30/2002  
PLANS/APPL TAKEN TO FRONT DESK  7/30/2002 DONE
Inspection Record Card- Bld  7/30/2002 DONE
Telephone call  7/30/2002 DONE
PERMIT READY AND FEES DUE
Routing - PLAN CHECK7/18/2002 7/30/2002 DONE
Plan assigned to (SAM)7/24/2002 7/30/2002 PASS
DetailsSteve Munroe
7/30/2002 10:14:27 SAM - activity updated through activity BLDA022 from case BLD02-01686.
Plan resubmittals received  7/29/2002 PEND
7/29/02 15:00 I recieved some engineering for the plan.
Plan Reviewer's activity  7/25/2002 PEND
7/25/02 9:10 I called and left a message for Chris Holliday with AHJ. I have questions on where the king studs go for the tall walls and to see about getting lateral engineering for the rear wall.
Pending Assignment by DJO7/11/2002 7/24/2002 DONE
DetailsDan Overy
7/24/2002 16:29:42 SAM - activity updated through activity BLDA183 from case BLD02-01686.
Routing - PLANNING7/11/2002 7/18/2002 FAIL
Incorrect setbacks marked on plans; inadequate 3rd site plan--missing requirements.-AKT
Routing - PUBLIC WORKS7/18/2002 7/18/2002 PASS
Routing - PLANNING7/18/2002 7/18/2002 PASS
Noted on plans--must specify correct setbacks & location [3rd set inadequate].
Application received  7/11/2002