(NO TENANT - PERFORMANCE DEVELOPMENT - EXTERIOR REMODEL) This building is NOT currently fire sprinklered. To modify the exterior wall of a 21,559 square foot one story building. Work is to include new wall cornices constructed of fire-retardant-treated wood and covered with an EIFS, an exterior concrete ramp, and exterior concrete steps all per approved drawings, engineering, and plan review conditions on file. The expansion and alteration of the parking lot are also covered under this permit. This permit DOES NOT establish a Certificate of Occupancy for any tenant. DRH02-00100 (9-27-02) SCOPE OF WORK MODIFIED PER RESUBMITTED DRAWINGS. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/26/20054/26/20054/26/2005 DONE
First Notice has not been responded to.
First Notice 1/2/20044/26/2005 DONE
First Notice7/11/20027/11/20024/26/2005 DONE
DOC - Permit Finaled1/2/20041/2/20041/2/2004APASS
DetailsJim Storey
Finaled by inspector at 1/2/2004 7:44:49 AM
BLD-Aging Inspection1/1/20041/1/20041/1/2004 PASS
DetailsJim Storey
Letter of compliance  12/27/2002 DONE
Letter of Compliance #22789 issued 12-27-02.
PubWorks Occupancy Approval12/3/200212/3/200212/3/2002 DONE
Drainage project complete, signed permanent occupancy 12/03/02. R.Cummings
Inspection Record Card- Bld  12/3/2002 DONE
BLD-Final11/22/200211/22/200211/22/2002PPASS
DetailsJim Storey
FIRE-Final Inspection11/18/200211/20/200211/20/2002APART
DetailsRick Jackson
###-#### DOUG met with Doug; fire not required to sign off on this permit 11/20/2002 10:01:23 AM
Code Occupancy Approval11/18/200211/18/200211/18/2002PPASS
DetailsWm. Michael Meloy
Inspection noted compliance. Spoke by telephone with Doug Zamzow, ###-####. 11/18/2002 2:05:38 PM 11/18/2002 2:05:58 PM
Code Occupancy Approval11/18/200211/18/200211/18/2002PPASS
DetailsWm. Michael Meloy
Inspection noted compliance. Spoke by telephone with Doug Zamzow, ###-####. 11/18/2002 2:05:38 PM 11/18/2002 2:05:58 PM
BLD-Conference11/15/200211/18/200211/18/2002APASS
DetailsJim Storey
###-#### doug
BLD-Framing/Rough-in11/1/200211/4/200211/4/2002ACANC
DetailsJim Storey
butch--ok to cover --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie called in on wrong permit. 11/4/2002 9:27:07 AM
Routing - PLAN CHECK9/26/2002 9/27/2002 PASS
Resubmittal approved to modify scope of work.
Routing - PLANNING9/25/2002 9/26/2002 PASS
Approve per DRH02-171 (Modification of DRH02-100)
Plan resubmittals received  9/17/2002 DONE
Received two sets of resubmittal sheets L1.00, A1.00, A2.00 with transmittal. Routed to Jim Storey.
BLD-Concrete9/11/20029/11/20029/11/2002PPASS
DetailsJim Sly
dan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Retaining wall for parking lot.... (under 4') for parking lot (N. end). 9/11/2002 1:20:54 PM
BLD-Footing9/10/20029/10/20029/10/2002PPASS
DetailsJim Storey
dan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieft ok 9/10/2002 3:23:40 PM
Inspection Record Card- Bld  8/16/2002 DONE
Issue PAID IN FULL permit  8/16/2002 DONE
Inspection Record Card- Bld  8/15/2002 DONE
Routing - PLAN CHECK8/13/2002 8/14/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/14/2002 PASS
Plan assigned to (CJW)7/18/2002 8/14/2002 PASS
DetailsCarl Westfall
8/14/2002 16:02:17 CJW - activity updated through activity BLDA022 from case BLD02-01690.
Routing - PUBLIC WORKS8/12/2002 8/13/2002 PASS
Routing - PLAN CHECK8/5/2002 8/12/2002  
Waiting for request for routing back to Public Works.
Routing - FIRE7/31/2002 8/5/2002 PASS
This permit approved however no occupancy till sprinklered
Plan Review Completed(1st rev)  8/5/2002  
Failed first Public Works review.
Routing - PLAN CHECK7/23/2002 7/31/2002 PASS
UBC plan review started July 30, 2002 and was finished the next day. The drawings were approved with conditions. See the conditions list.
Routing - PLANNING7/22/2002 7/23/2002 PASS
Approve per DRH02-100.
Routing - PUBLIC WORKS7/18/2002 7/22/2002  
Failed first Public Works review. Requires drainage plan revision per Brian M.
Routing - Erosion and Sediment7/22/2002 7/22/2002 PASS
ESC plan approved with conditions attached to drawings.
Plans ACCEPTED BY PLAN TECH  7/12/2002 DONE
Application received  7/11/2002  
Recd Pcfee & Taken To Pln CK  7/11/2002 DONE