Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-01692
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 4993 E STEMWOOD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a five bedroom, three and half bathroom 2804 sq. ft. two story single family dwelling (1637 sq. ft. first floor/1167 sq. ft. second floor) with a attached 647 sq. ft. two car garage and a 84 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar and shade restricted lot. CUP98-116 per Angie Thomas with Planning and Zoning. PC#422 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/14/200211/14/200211/14/2002PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2002 at 07:44:05. Contact: .c.c # 22605 issued 11/14/2002 2:27:57 PM
DOC - Permit Finaled11/14/200211/14/200211/14/2002PPASS
DetailsDave Hannah
Finaled by inspector at 11/14/2002 2:28:00 PM
BLD-Final11/13/200211/13/200211/13/2002PFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/13/2002 at 07:51:54. Contact: . needs mec sign off 11/13/2002 2:01:08 PM
BLD-Wall cover9/24/20029/24/20029/24/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/24/2002 at 07:05:05. Contact: .c/n made ok. 9/24/2002 10:44:19 AM
BLD-Framing/Rough-in9/20/20029/23/20029/23/2002APART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/20/2002 at 15:13:51. Contact: . C/N posted--ok to insulate. 9/23/2002 9:24:43 AM
BLD-Other9/12/20029/12/20029/12/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/12/2002 at 07:11:28. Contact: . Shear-ok to side. 9/12/2002 9:41:31 AM
BLD-Other9/5/20029/6/20029/6/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 09/05/2002 at 12:24:06. Contact: .
BLD-Framing/Rough-in9/5/20029/6/20029/6/2002AFAIL
DetailsSteven Webb
randy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie SHEAR--C/N--missing hd's at front--stapling light through-out--recall. 9/6/2002 8:50:19 AM
BLD-Other9/6/20029/6/20029/6/2002AFAIL
DetailsSteven Webb
Prior entry -- mistake by inspector--all hd installed but missing blocks, nails light upstair etc. C/N on site. 9/6/2002 9:50:38 AM
BLD-Foundation8/8/20028/9/20028/9/2002ACANC
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/08/2002 at 17:17:40. Contact: ###-####. Cancelled by contractor not ready. 8/9/2002 12:38:47 PM
BLD-Foundation8/9/20028/9/20028/9/2002PPART
DetailsSteven Webb
Scheduled by a contractor via Hello! on 08/09/2002 at 08:38:48. Contact: ###-####. 95% ready--wip 8/9/2002 4:48:52 PM
BLD-Footing8/7/20028/7/20028/7/2002PPART
DetailsDave Hannah
MANA; Phone #: ###-#### work in progress setbaks ok 65% complete 8/7/2002 5:36:36 PM
Issue PAID IN FULL permit  7/31/2002 DONE
Plan assigned to (SAM)7/24/2002 7/29/2002 PASS
DetailsSteve Munroe
7/29/2002 14:14:27 SAM - activity updated through activity BLDA022 from case BLD02-01692.
Routing - PLAN CHECK7/19/2002 7/29/2002 DONE
Case Summary (BLD)  7/29/2002  
Plan Review Report  7/29/2002  
PLANS/APPL TAKEN TO FRONT DESK  7/29/2002 DONE
Inspection Record Card- Bld  7/29/2002 DONE
Telephone call  7/29/2002 DONE
Plan Reviewer's activity  7/26/2002 PEND
7/26/02 10:55 I called and left a message for Darren, the engineer, to call me. I have questions on the overheight walls, king studs and bracing all around the great room.

7/29/02 9:00 I called and left a message for Justin, with Tru Engineering, to call me. I still have the questiong for the overheight walls, king studs and bracing all aroung the great room.
Pending Assignment by DJO7/12/2002 7/24/2002 DONE
DetailsDan Overy
7/24/2002 16:22:07 SAM - activity updated through activity BLDA183 from case BLD02-01692.
Routing - PLANNING7/12/2002 7/19/2002 PASS
Routing - PUBLIC WORKS7/19/2002 7/19/2002 PASS
Application received  7/12/2002