BLD-Final | 4/29/2003 | 4/30/2003 | 4/30/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 4:30:57 PM. Contact: ###-####.c.c # 22907 issued 4/30/2003 10:22:56 AM
|
BLD-Grading Inspection | 4/30/2003 | 4/30/2003 | 4/30/2003 | | DONE |
Rita DeYoung
|
|
|
Final grading and drainage approved.
|
DOC - Permit Finaled | 4/30/2003 | 4/30/2003 | 4/30/2003 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 4/30/2003 10:22:58 AM
|
BLD-Final | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | CANC |
Dave Hannah
|
|
|
titus; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 4/25/2003 | 4/25/2003 | 4/25/2003 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Final | 4/21/2003 | 4/22/2003 | 4/22/2003 | P | FAIL |
Steven Webb
|
|
|
TITUS; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N on site. 4/22/2003 2:49:36 PM
|
BLD-Energy code compliance | 12/2/2002 | 12/3/2002 | 12/3/2002 | P | PASS |
Jim Sly
|
|
|
late pm ###-####
|
BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | PASS |
Dave Hannah
|
|
|
###-#### titus all c/n items completed ok to insulate 12/2/2002 4:34:27 PM
|
BLD-Framing/Rough-in | 11/27/2002 | 11/29/2002 | 11/29/2002 | P | FAIL |
Steven Webb
|
|
|
###-####C/N issued--Need electrical r. in and foam seal before ok to insulate can be granted. Recall 11/29/2002 1:45:22 PM
|
BLD-Wall cover | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PASS |
Alan Hauser
|
|
|
hold down as per plans, nailing ok, hold downs in basement just epoxied (?) nuts not fastened 11/27/2002 2:09:39 PM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | CANC |
Jim Storey
|
|
|
###-#### ###-####out of time sent to hanna 11/26/2002 4:34:16 PM
|
BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 | A | NR |
Dave Hannah
|
|
|
###-####
|
BLD-Grading Inspection | 10/11/2002 | 10/11/2002 | 10/11/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer approved the subgrade below the basement floor slab and the interior bearing wall footings.
|
BLD-Foundation | 9/27/2002 | 10/1/2002 | 10/1/2002 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 16:51:16. Contact: ###-####.wip 10/1/2002 2:06:16 PM
|
BLD-Grading Inspection | 9/24/2002 | 9/24/2002 | 9/24/2002 | | DONE |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
BLD-Footing | 9/24/2002 | 9/24/2002 | 9/24/2002 | A | PART |
Dave Hannah
|
|
|
|
BLD-Footing | 9/20/2002 | 9/23/2002 | 9/23/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 13:28:51. Contact: ###-####. needs soils report 9/23/2002 4:36:37 PM
|
Issue PAID IN FULL permit | | | 8/23/2002 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 8/13/2002 | 8/13/2002 | 8/22/2002 | | PASS |
Dan Overy
|
|
|
8/22/2002 11:41:19 DJO - activity updated through activity BLDA022 from case BLD02-01699.
|
Routing - PLANNING | 8/22/2002 | | 8/22/2002 | | DONE |
|
|
|
routing plans back to Mark P. for signature on site plans and completion of zoning forms. appeal period ended on 8/16/02
|
Routing - PLAN CHECK | | | 8/22/2002 | | DONE |
|
|
|
Mark P. has signed off. route to PC
|
Case Summary (BLD) | | | 8/22/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 8/22/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/22/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/22/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/22/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plans ACCEPTED BY PLAN CHECK | | | 8/13/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/13/2002 | | PEND |
|
|
|
cannot issue permit until appeal period is complete 8/16/02
|
Plan resubmittals received | | | 8/12/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheet 1 of XX with calculations. Routed to Dan Overy.
|
Routing - Erosion and Sediment | 8/6/2002 | | 8/6/2002 | | PASS |
|
|
|
ESC approved with conditions attached to drawing.
|
Routing - FIRE | 8/6/2002 | | 8/6/2002 | | DONE |
|
|
|
No fire sprinklers required (Northridge # 5 Subdiv.)
|
Routing - PLANNING | 7/18/2002 | | 8/6/2002 | | DONE |
|
|
|
Pending appeal waiting period. Planning approved Hillside Application pending 10-day appeal period, which will expire on August 15, 2002 at 5:00 PM. Please do not issue permits without verifying there are no appeals pending. BUILDING DEPARTMENT if no appeal is filed, the permit can be issued on August 16, 2002.
|
Routing - PUBLIC WORKS | 7/18/2002 | | 7/18/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 7/12/2002 | | 7/18/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as category 2 with conditions of approval in letter attached to plans.
|
Application received | | | 7/12/2002 | | |
|
|
|
|
Pending Assignment by DJO | 7/12/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 8/6/2002 | | | | |
|
|
|
|