BLD-Final | 12/9/2002 | 12/10/2002 | 12/10/2002 | P | PASS |
Jim Storey
|
|
|
###-#### PAUL
|
DOC - Permit Finaled | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/10/2002 2:14:45 PM
|
BLD-Final | 12/6/2002 | 12/6/2002 | 12/6/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### paul (units open)c/n crawl paper exposed ducts need insulation/handrail returns/ele final/fire door latch/ garage firestopping. 12/6/2002 4:34:21 PM
|
BLD-Framing/Rough-in | 10/22/2002 | 10/23/2002 | 10/23/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 17:25:17. Contact: ###-####.c/n made ok. 10/23/2002 4:17:34 PM
|
BLD-Energy code compliance | 10/23/2002 | 10/23/2002 | 10/23/2002 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 10/21/2002 | 10/22/2002 | 10/22/2002 | P | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 13:32:02. Contact: ###-####....c/n, fireblocks, draft stop. ok to insul. 10/22/02 5:21:07 PM
|
BLD-Framing/Rough-in | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PART |
Jim Storey
|
|
|
###-#### ###-####exterior ok 10/8/2002 5:02:34 PM
|
BLD-Framing/Rough-in | 9/30/2002 | 9/30/2002 | 9/30/2002 | P | PART |
Jim Storey
|
|
|
nailing-paul; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie fire wall gyp ok. 9/30/2002 4:30:01 PM
|
BLD-Foundation | 8/23/2002 | 8/23/2002 | 8/23/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 07:23:09. Contact: ###-####.
|
BLD-Footing | 8/20/2002 | 8/21/2002 | 8/21/2002 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/20/2002 at 19:13:55. Contact: .set backs ok wip. 8/21/2002 2:25:27 PM
|
Issue PAID IN FULL permit | | | 8/16/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2002 | | DONE |
|
|
|
permit ready and fees due
|
Case Summary (BLD) | | | 8/8/2002 | | |
|
|
|
|
Plan Review Report | | | 8/8/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/23/2002 | | 8/8/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 7/29/2002 | | 8/8/2002 | | PASS |
Steve Munroe
|
|
|
8/8/2002 10:47:40 SAM - activity updated through activity BLDA022 from case BLD02-01730.
|
Plan Reviewer's activity | | | 7/30/2002 | | PEND |
|
|
|
7/30/02 15:00 I called and left a message for the engineer, Riley, to call me. I have questions on shear panel locations and if he did over height wall engineering. Riley's message said he will not be back till August 5.
|
Pending Assignment by DJO | 7/17/2002 | | 7/29/2002 | | DONE |
Dan Overy
|
|
|
7/29/2002 15:04:57 SAM - activity updated through activity BLDA183 from case BLD02-01730.
|
Routing - PUBLIC WORKS | 7/22/2002 | | 7/23/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 7/17/2002 | | 7/22/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 7/22/2002 | | 7/22/2002 | | PASS |
|
|
|
|
Application received | | | 7/17/2002 | | |
|
|
|
|