Permit NumberBLD02-01733
StatusFinaled
Name ROMAN CATHOLIC DIOCESE OF BOISE
Site Address 775 N 8TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(ST JOHN'S CATHOLIC CATHEDRAL PARISH OFFICE) This building is NOT fire sprinklered. To remodel the first floor and second floor of a 6,200 square foot 2 story building. A 1,264 square foot A-3 assembly room is being created on the first floor. Work is to include constructing 4 new restrooms accessible to the disabled, altering 1 existing restrooms to be accessible to the disabled, installing a wheelchair lift, placing a new sloped exterior concrete sidewalk, placing concrete footings, and installing beams and columns all per approved drawings, engineering, and plan review conditions on file. Demolition and temporary shoring are also covered under this permit. CZC02-00115 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  1/24/2020 DONE
Permanent Occupancy  1/24/2020 DONE
Letter of complaince was issued on 8/29/03, but it should have been a Certificate of Occupancy.
DOC - Permit Expired3/15/20043/15/20043/15/2004PPASS
DetailsDave Hannah
Expired by inspector at 3/15/2004 6:53:57 AM
BLD-Aging Inspection3/10/20043/10/20043/10/2004 PASS
DetailsDave Hannah
Letter of compliance  8/29/2003 DONE
Letter of Compliance #22999 issued 8-29-03.
BLD-Aging Inspection8/20/20038/20/20038/20/2003 DONE
DetailsCarl Dependahl
called supt. just needs p&z. 8/21/2003 10:06:13 AM
BLD-Final3/17/20033/18/20033/18/2003AFAIL
DetailsCarl Dependahl
MIKE; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 3/18/2003 10:44:32 AM...c/n, ok for temp. occ pend ing p&z 3/18/2003 11:21:30 AM
FIRE-Final Inspection2/25/20032/26/20032/26/2003APASS
DetailsRick Jackson
call first; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung will maximum occupant load 208 sign in first floor assembly room for structural inspector 2/25/2003 4:21:03 PM
BLD-Conference1/21/20031/21/20031/21/2003PPASS
DetailsCarl Dependahl
call first; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to glaze fire door at corridor up to 1296 sq. in. 1/21/2003 4:40:25 PM
BLD-Framing/Rough-in1/9/20031/9/20031/9/2003PPART
DetailsCarl Dependahl
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung, grid: add spreader bars as needed, ok to tile pend other approvals. 1/9/2003 4:25:47 PM
BLD-Conference12/16/200212/16/200212/16/2002PPART
DetailsCarl Dependahl
St. johns; WIP, complete gyp. install to chk floor draftstopping (1000 sf.) & short corridor at rear. 12/16/2002 2:25:32 PM
BLD-Framing/Rough-in12/9/200212/9/200212/9/2002PPART
DetailsCarl Dependahl
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylielower floor walls ok to cover, add furring or remove conduit at rear 1hr corridor lid...chk draft stops/fireblocks after gyp installed. 12/9/2002 3:42:58 PM
Issue PAID IN FULL permit  10/16/2002  
PLANS/APPL TAKEN TO FRONT DESK  8/23/2002 PASS
Inspection Record Card- Bld  8/23/2002 DONE
Print Occupancy Form  8/23/2002 DONE
Routing - PLAN CHECK8/9/2002 8/23/2002 PASS
Drawings approved, with conditions, after resubmittal review.
Plan assigned to (CJW)7/19/2002 8/23/2002 PASS
DetailsCarl Westfall
8/23/2002 13:52:52 CJW - activity updated through activity BLDA022 from case BLD02-01733.
Plan resubmittals received  8/20/2002 DONE
Received two copies of revised sheets A 1.0, A 2.0, A 2.1, A 3.0, A 6.0. Routed to Carl W. KMM
Routing - PLANNING8/8/2002 8/9/2002 PASS
Approved per CZC02-00115 and per the site plans dated July 29, 2002.
Routing - PLAN CHECK8/6/2002 8/8/2002  
Waiting for resubmittal.
Routing - FIRE8/5/2002 8/6/2002 PASS
approved without written comment
Plan Review Completed(1st rev)  8/6/2002 DONE
Routing - PLAN CHECK7/23/2002 8/5/2002  
Failed first UBC review. UBC plan review started August 1, 2002 and finished August 5, 2002. A response from the architect was required. See the conditions list.
Routing - PLANNING7/22/2002 7/23/2002  
Failed first Planning review. Does not comply with requirements of the Zoning Certificate. Applicant has been notified.
Routing - PUBLIC WORKS7/22/2002 7/22/2002 PASS
Application received  7/17/2002  
Recd Pcfee & Taken To Pln CK  7/17/2002 DONE
Plans ACCEPTED BY PLAN TECH  7/17/2002 DONE
1. Informed applicant that plumbing plans might be required.
Fee Review-notes7/17/20027/17/2002