Permit Information
Permit NumberBLD02-01762
StatusFinaled
Name GARDNER LAW
Site Address 1410 W WASHINGTON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(GARDNER LAW - HOUSE CONVERSION TO OFFICE) This building is NOT fire sprinklered. To convert the basement and first floor of a 3,189 square foot house to a commercial use. The 962 square foot basement will be reduced to a maximum 300 square foot usable storage area (only on exit from the basement is provided). The entire 1,302 square foot 1st floor will be converted to an attorney's office. The 925 square foot 2nd floor will remain an R-3 occupancy (used as guest rooms by family visitors during the holidays and not to be used on a regular basis). The 2nd floor is NOT approved as an apartment. Work is to include a restroom and an exterior ramp accessible to the disabled all per approved drawings and plan review conditions on file. CUP02-00057 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/12/20038/12/20038/12/2003 DONE
Permanent Occupancy 12/18/200212/18/2002 DONE
Details
BLD-Final12/17/200212/18/200212/18/2002APASS
DetailsSteven Webb
Scheduled by a contractor via Hello! on 12/17/2002 at 16:10:36. Contact: ###-####.
Permanent occupancy  12/18/2002 DONE
Perm. Occ. Cert. #9486 issued 12-18-02 to Gardner Law.
FIRE-Final Inspection10/9/200210/9/200210/9/2002PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/09/2002 at 10:31:42. Contact: ###-####. will latch on basement door for structural inspector 10/9/2002 1:40:04 PM
BLD-Final10/9/200210/9/200210/9/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/09/2002 at 10:33:18. Contact: ###-####...c/n: steps, rails, ok for t/o. 10/9/02 5:13:38 PM
FIRE-Final Inspection10/4/200210/7/200210/7/2002AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/04/2002 at 16:23:11. Contact: ###-####. door hardware; closures on basement and 2nd floor doors per plans 10/7/2002 10:59:47 AM
BLD-Final10/4/200210/7/200210/7/2002ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/04/2002 at 16:24:45. Contact: ###-####. no fire final 10/7/2002 11:21:08 AM
FIRE-Final Inspection8/29/20028/30/20028/30/2002ANR
DetailsRick Jackson
###-#### JACK CALLED TO CANC THIS INSPECTION 8-30-02 ///DLD received call from Jack and he said he won't be ready until next week 8/30/2002 11:08:16 AM
BLD-Final8/29/20028/30/20028/30/2002ACANC
DetailsRuss Owen
###-#### JACK CALLED TO CANC THIS INSPECTION 8-30-02///DLD
BLD-Conference8/28/20028/29/20028/29/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/28/2002 at 16:16:13. Contact: ###-####...spoke w/ Bldr...need min. size landing & threshold at entry, install handrails at ramp/stairs...etc. 8/29/2002 5:10:15 PM
BLD-Conference8/27/20028/28/20028/28/2002PFAIL
DetailsCarl Dependahl
Re: insps/permits...no one at site, left c/n to obtain all other insps. hand rails not installed at stairs or ramp. 8/28/2002 6:22:48 PM
BLD-Conference8/27/20028/27/20028/27/2002PNR
DetailsCarl Dependahl
unable to contact 8/27/2002 5:31:11 PM
Inspection Record Card- Bld  8/27/2002 DONE
Print Occupancy Form  8/27/2002 DONE
Issue PAID IN FULL permit  8/27/2002 DONE
Plan assigned to (CJW)7/22/2002 8/27/2002 PASS
DetailsCarl Westfall
8/27/2002 11:14:04 CJW - activity updated through activity BLDA022 from case BLD02-01762.
Routing - PLANNING8/26/2002 8/27/2002 PASS
Routing - PLAN CHECK8/27/2002 8/27/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/27/2002 PASS
Routing - FIRE8/23/2002 8/26/2002 PASS
Routing - PLAN CHECK8/19/2002 8/23/2002 PASS
Modified the plan review report - Item #15. Sent drawings back to the Fire Department for their resubmittal review.
Plan resubmittals received  8/22/2002 DONE
Received two copies of revised sheet Arch. sheet #1. and two copies of Hydrant flow. Routed to Carl
Routing - FIRE8/15/2002 8/19/2002  
Failed first UFC review. HYDRANT LOCATION & FLOW
Plan Review Completed(1st rev)  8/19/2002 DONE
Routing - PLAN CHECK8/8/2002 8/15/2002 PASS
UBC plan review started August 13, 2002 and finished August 15, 2002. The drawings were approved with conditions. See the conditions list.
Routing - PLANNING7/23/2002 8/8/2002  
Failed first Planning/Zoning review. Needs to submit recorded off-site parking agreement and landscape plan for zoning certificate approval by DR staff. Karen Gallagher.
Additional plans submitted  7/29/2002 DONE
Received Impact Fee certificate from ACHD. Attached to plans.
Routing - PUBLIC WORKS7/22/2002 7/23/2002 PASS
First Notice7/19/20027/19/20027/19/2002 DONE
Plans ACCEPTED BY PLAN TECH  7/19/2002 DONE
1. No building code data on front of plans.
2. Applicant stated that there is existing concrete, no "dirtwork" will be performed or disturbed, so ESC not required.
3. Plans not signed by Architect (less than 1500 sq ft)
Application received  7/19/2002  
Recd Pcfee & Taken To Pln CK  7/19/2002 DONE