BLD-Final | 9/27/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 09/27/2002 at 11:23:22. Contact: ###-####.final ok 9/30/2002 10:08:33 AM
|
DOC - Permit Finaled | 9/30/2002 | 9/30/2002 | 9/30/2002 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 9/30/2002 10:08:36 AM
|
Letter of compliance | | | 9/30/2002 | | DONE |
|
|
|
Letter of Compliance #22737 issued 9-30-02.
|
BLD-Final | 9/23/2002 | 9/24/2002 | 9/24/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### ###-####no occ card to track health dept on temp occ/ ada per plan not done to meet knee space required on the approved plan. 9/24/2002 3:14:30 PM
|
Case Summary (BLD) | | | 9/16/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/10/2002 | 9/10/2002 | 9/10/2002 | P | PASS |
Jim Storey
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 8/26/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2002 | | DONE |
|
|
|
|
Telephone call | | | 8/21/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Routing - PLAN CHECK | 8/19/2002 | | 8/20/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/20/2002 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 7/29/2002 | | 8/20/2002 | | PASS |
|
|
|
8/20/2002 15:34:53 RMH - activity updated through activity BLDA022 from case BLD02-01821.
|
Routing - PLAN CHECK | 8/6/2002 | | 8/19/2002 | | |
|
|
|
|
Plan resubmittals received | | | 8/19/2002 | | DONE |
|
|
|
Received two copies of revised sheetA2-1. Routed to Ron Hill. Kmm
|
Routing - PLUMBING | 8/19/2002 | | 8/19/2002 | | PASS |
|
|
|
1. 11/4 inch line from new hand sink pumped overhead must discharge into floor sink or into drain below existing sink. 2. may need prmise backflow protection.
|
Routing - PLUMBING | 7/31/2002 | | 8/6/2002 | | FAIL |
|
|
|
1. 11/4" DISCHARGEW LINE FROM NEW HAND SINK PUMPED OVERHEAD MUST DISCHARGE INTO FLOOR SINK OR INTO DRAIN BELOW EXISTING SINK @ NOTE 10. 2. NEED DRAWING SHOWING DWV AND WATER TO HAND SINKS BEING REQUIRED BY HEALTH DEPT. 3. MAY NEED PREMISE BACKFLOW PROTECTION.
|
Routing - PUBLIC WORKS | 7/29/2002 | | 7/31/2002 | | PASS |
|
|
|
|
First Notice | 7/29/2002 | 7/29/2002 | 7/29/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/29/2002 | | PEND |
|
|
|
Requires 1. Code Data
2. dimensioned plans
3. indicate usage of all rooms
4. plumbing schematic for new sinks that Bob Mayer is requiring.
5. arch./eng. record form (RECEIVED 7/29/02) Put with plans and file. kmm
Faxed Jerry Teal of these needs. kmm
|
Application received | | | 7/29/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/29/2002 | | DONE |
|
|
|
|