Fee Review-notes | 8/1/2002 | 8/1/2002 | 8/10/2004 | | DONE |
|
|
|
|
BLD-Final | 9/26/2003 | 9/29/2003 | 9/29/2003 | A | PASS |
Jim Sly
|
|
|
Cathy has the card - everyone signed off - need final from you - please let me know if approved! Thanks ~ : ) ok for perm. occ. :) 9/29/2003 11:33:21 AM
|
First Notice | | 9/29/2003 | 9/29/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/29/2003 | 9/29/2003 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/29/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9818 issued 9-29-03 to the Boise City Fire Station #11.
|
BLD-Final | 7/24/2003 | 7/25/2003 | 7/25/2003 | A | FAIL |
Jim Sly
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Re-call when Plumbing is Finaled. (talked to Dave). 7/25/2003 11:15:52 AM
|
Temporary occupancy | | | 5/2/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4949 issued 5-2-03 to Boise Fire Station #11.
|
BLD-Final | 4/30/2003 | 5/1/2003 | 5/1/2003 | A | PART |
Russ Owen
|
|
|
I will approve a temp oc, I have inspected into the attic area, and have a correction to repair a draft stop and notch top of exterior wall blocking and to provide the 2 roof vents as shown also nee to see the truss calcs. On site with contractor. 5/2/2003 7:39:47 AM 5/2/2003 7:40:02 AM
|
BLD-Conference | 4/29/2003 | 4/29/2003 | 4/29/2003 | A | PART |
Russ Owen
|
|
|
I talked with the Architect, he has been on site for visits during construction. He will not write a letter for the contractor in reguards to the framing, But has indicated he feels that there are no structural issues. As all exterior walls are bearing . I will meet again with the contractor on site to resolve. 5/2/2003 7:37:26 AM
|
BLD-Final | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | CANC |
Russ Owen
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore. The contrator has stated that the Architect of record will not confirm farming was as per plans. I sugested they talk with George Slane. 4/28/2003 2:40:00 PM 4/28/2003 2:40:53 PM
|
FIRE-Final Inspection | 4/24/2003 | 4/25/2003 | 4/25/2003 | A | PASS |
Troy Cobbley
|
|
|
dave; Phone #: ###-#### Life safety finaled 4/25/2003 2:41:32 PM
|
Code Occupancy Approval | 4/25/2003 | 4/24/2003 | 4/24/2003 | P | PASS |
Scott M.Brown
|
|
|
FINAL SIGNED OFF. 4/25/2003 1:23:52 PM
|
BLD-Final | 4/23/2003 | 4/23/2003 | 4/23/2003 | A | FAIL |
Troy Cobbley
|
|
|
There is now access to the link for the fire door but while I was performing the inspection, Hobson Mechanical was installing a duct smoke detector. The plans show the unit at only 1850 cfm but per this contractor the mechanical engineer stated it was actually over 2000 cfm and to install a duct smoke detector. I won't final until it is installed and tested.
|
FIRE-Final Inspection | 4/21/2003 | 4/21/2003 | 4/21/2003 | P | FAIL |
Troy Cobbley
|
|
|
dave; Phone #: ###-#### Provide better access to the fire damper for verifiction of link or provide letter from the mechanical engineer stating proper function of the fire damper 4/21/2003 1:50:00 PM
|
BLD-Final | 4/17/2003 | 4/18/2003 | 4/18/2003 | P | FAIL |
Carl Dependahl
|
|
|
w/ 407... 4/18/2003 2:41:01 PM
|
FIRE-Final Inspection | 4/18/2003 | 4/18/2003 | 4/18/2003 | P | FAIL |
Troy Cobbley
|
|
|
###-#### dave No approved plans on site. No inspection done. 4/18/2003 2:00:28 PM
|
BLD-Final | 4/18/2003 | 4/18/2003 | 4/18/2003 | P | FAIL |
Russ Owen
|
|
|
This has only had a shear nailing inspection at that time gas piping,elctrical and plumbing had not been approved for cover see records. once these items had approval they coverd all. Job is now finished contractors responce was they thought since I had done a shear wall inspection that framing was approved. I asked them why they thought I would approve the inside with out any other trades signed off. I said that I was unaware of any place in this area that would allow that. So at this point only solution is to have the architect of record write a letter stating that framing was done in accordance with plans. also still needs fire and zoning. at this final now there are no approved plans on site. Carl D on site with me at this inspection. 4/18/2003 5:19:26 PM
|
Print Occupancy Form | | | 4/17/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | PART |
Russ Owen
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha SmylieOK FOR EXTERIOR WALL COVER. 2/12/2003 3:35:24 PM
|
BLD-Framing/Rough-in | 2/10/2003 | 2/10/2003 | 2/10/2003 | P | FAIL |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung .c/n posted. 2/10/2003 4:05:35 PM
|
BLD-Foundation | 12/30/2002 | 12/30/2002 | 12/30/2002 | P | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. ok but hold downs not yet in place. 12/30/2002 4:16:59 PM
|
BLD-Foundation | 12/27/2002 | 12/27/2002 | 12/27/2002 | P | FAIL |
Russ Owen
|
|
|
###-#### dave C/n posted, exceeds 12in spaceing at horiz bars, column footing reqs addnl stirups, dowl not in place at existing walls, hold downs shown on plans none on site, also location is not clearley indicated on plans. Contractor on site. 12/27/2002 3:31:20 PM
|
BLD-Footing | 12/16/2002 | 12/17/2002 | 12/17/2002 | A | PART |
Russ Owen
|
|
|
90% complete needs post support completed. 12/17/2002 11:11:54 AM
|
BLD-Footing | 12/17/2002 | 12/17/2002 | 12/17/2002 | P | PASS |
Russ Owen
|
|
|
|
BLD-Footing | 12/16/2002 | 12/16/2002 | 12/16/2002 | P | NR |
Russ Owen
|
|
|
###-#### dave
|
BLD-Conference | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Russ Owen
|
|
|
###-####
|
Issue PAID IN FULL permit | | | 11/26/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/25/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/25/2002 | | DONE |
|
|
|
|
Telephone call | | | 11/25/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (MLO) | 8/5/2002 | | 11/25/2002 | | PASS |
Mike Otto
|
|
|
11/25/2002 09:33:54 MLO - activity updated through activity BLDA022 from case BLD02-01845.
|
Routing - Erosion and Sediment | 11/19/2002 | | 11/19/2002 | | PASS |
|
|
|
Send to Jim Rogers asap.
ESC approved with conditions attached to plans.
|
Plan resubmittals received | | | 11/6/2002 | | DONE |
|
|
|
Received two sets of resubmittal ESC-1 and ESC narrative. Routed to Mike Otto.
|
Plan Review Completed(1st rev) | | | 8/26/2002 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/26/2002 | | 8/26/2002 | | |
|
|
|
|
Routing - FIRE | 8/23/2002 | | 8/26/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/21/2002 | | 8/23/2002 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/16/2002 | | 8/20/2002 | | PASS |
|
|
|
1. NEED BLDG CLEAN OUT 2 FEET OUTSIDE FOUNDATION WHERE 4 INCH DRAIN LINES IXIT BLDG.(ONE LOCATION). 2. BLDG MAY NEED BACKFLOW PROTECTION AND THERMAL EXPANSION PROTECTION.
|
Routing - PLANNING | 8/15/2002 | | 8/16/2002 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/13/2002 | | 8/15/2002 | | FAIL |
|
|
|
ESC plan incomplete. No narrative report provided, no BMP details provided.
|
Routing - PUBLIC WORKS | 8/2/2002 | | 8/13/2002 | | PASS |
|
|
|
|
Pending Assignment by JCM | 8/1/2002 | | 8/5/2002 | | DONE |
John Menard
|
|
|
8/5/2002 08:39:12 JCM - activity updated through activity BLDA174 from case BLD02-01845.
|
Routing - PLANNING Land Div | 8/1/2002 | | 8/2/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/1/2002 | | PASS |
|
|
|
Per Brian Murphy, no extra civil sheets, drainage calcs or O&M manual are required.
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2002 | | |
|
|
|
|
Application received | | | 7/31/2002 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | | | |
|
|
|
|
Routing - PLAN CHECK | 11/19/2002 | | | | |
|
|
|
|