Third Notice BLD | 6/14/2006 | 6/14/2006 | 6/14/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/14/2006 | 4/14/2006 | 6/14/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 3/24/2006 | 3/24/2006 | 4/14/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 3/24/2006 | 3/24/2006 | 3/24/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/24/2006 | 3/24/2006 | 3/24/2006 | A | PASS |
Mike Jordan
|
|
|
Project has already benn finaled by others as per history.
|
Code Occupancy Approval | | | 1/10/2003 | | PASS |
|
|
|
ALL LANDSCAPE AND OTHER REQUIREMENTS IN, FINAL SIGNED OFF.
|
Letter of compliance | | | 1/10/2003 | | DONE |
|
|
|
Letter of Compliance #22800 issued 1-10-03.
|
FIRE-Final Inspection | 1/8/2003 | 1/9/2003 | 1/9/2003 | A | CANC |
Troy Cobbley
|
|
|
inspection not needed it already has a fire life safety sign off 1/9/2003 10:13:16 AM
|
BLD-Final | 1/8/2003 | 1/9/2003 | 1/9/2003 | P | PASS |
Russ Owen
|
|
|
###-#### JIM This is ok for a perm oc if all required signat 1/13/2003 1:27:17 PM ures are on card. 1/13/2003 1:27:28 PM
|
FIRE-Final Inspection | 12/19/2002 | 12/20/2002 | 12/20/2002 | A | PASS |
Troy Cobbley
|
|
|
Life safety on shell and vanilla finish finaled 12/20/2002 11:01:57 AM
|
BLD-Final | 12/19/2002 | 12/20/2002 | 12/20/2002 | P | PART |
Russ Owen
|
|
|
###-#### jim > ok for a permanent oc peding all required sign offs on job card. 12/20/2002 12:53:32 PM
|
Temporary occupancy | | | 12/20/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4906 issued 12-20-02 to Park/Gibbs Develoment (shell bldg.)
|
FIRE-Final Inspection | 12/19/2002 | 12/19/2002 | 12/19/2002 | P | NR |
Troy Cobbley
|
|
|
jim with steed costruction said they were not ready due to the wron ballast for the emergency lights 12/19/2002 1:20:02 PM
|
BLD-Final | 12/19/2002 | 12/19/2002 | 12/19/2002 | P | NR |
Tom Arcoraci
|
|
|
###-####
|
BLD-Final | 12/19/2002 | 12/19/2002 | 12/19/2002 | P | NR |
Carl Dependahl
|
|
|
###-####, need other finals 12/19/2002 4:37:49 PM
|
BLD-Framing/Rough-in | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | PASS |
Russ Owen
|
|
|
JIM--CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | FAIL |
Russ Owen
|
|
|
ceiling grid jim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieneeds lighting installed and perimeter wires. 12/12/2002 11:54:36 AM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/25/2002 at 00:22:54. Contact: . not ready at 9:30 am 11/25/2002 9:37:52 AM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | PART |
Carl Dependahl
|
|
|
###-####...blocking, straps & int shear ok 11/26/2002 9:20:11 AM
|
BLD-Framing/Rough-in | 11/21/2002 | 11/22/2002 | 11/22/2002 | P | PART |
Russ Owen
|
|
|
###-####, WROTE A C/N ON PRIOR C/N FROM 340 TO ADD THE INTERIOR SIDE OF THE EST WALL AS SHOWN ON PLANS. 11/22/2002 4:15:44 PM
|
BLD-Framing/Rough-in | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PART |
Carl Dependahl
|
|
|
see notes under last inspection. 11/20/2002 5:20:46 PM; c/n re: complete coil strap/blocks at east wall, firestopping...ok to insul "shell" side... 11/21/02 10:38:08 AM
|
BLD-Conference | 11/21/2002 | 11/21/2002 | 11/21/2002 | P | PASS |
Carl Dependahl
|
|
|
w/ Steed...left c/n, but ok to insulate. 11/21/02 1:53:04 PM
|
BLD-Framing/Rough-in | 11/20/2002 | 11/20/2002 | 11/20/2002 | P | PART |
Russ Owen
|
|
|
Conference only with jim from steed, the schell needs an interior frame inspection prior to ve framing for tennant , went over this with steed as they are not doing the tennent improvement, did note some items for interior frame with jim at the shear inspections, a side wall strap was needed at the east wall and some anchor bolts at plate breaks. This will be called in for an am inspection. 11/20/2002 3:59:30 PM
|
BLD-Framing/Rough-in | 10/31/2002 | 11/1/2002 | 11/1/2002 | A | FAIL |
Russ Owen
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Marsha SmylieSame corrections with shear panels. Contractor notified , will charge a re-inspection fee next time i ave been here 3 times for the same thing. 11/1/2002 10:09:13 AM
|
BLD-Framing/Rough-in | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PART |
Russ Owen
|
|
|
ok to side. 11/1/2002 4:09:12 PM
|
BLD-Framing/Rough-in | 10/30/2002 | 10/31/2002 | 10/31/2002 | A | FAIL |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungShear at hds needs to be complete. 10/31/2002 10:54:20 AM
|
BLD-Framing/Rough-in | 10/29/2002 | 10/30/2002 | 10/30/2002 | A | NR |
Russ Owen
|
|
|
need ladder to roof 10/30/2002 5:24:12 PM
|
BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | PART |
Russ Owen
|
|
|
###-####. still makeing repairs. 10/29/2002 2:27:29 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/28/2002 | 10/28/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 12:13:20. Contact: ###-####.c/n on site. 10/28/2002 2:13:15 PM
|
BLD-Footing | 10/2/2002 | 10/3/2002 | 10/3/2002 | A | PART |
Russ Owen
|
|
|
jim- & slab to bld; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie s-i is there on site. 10/3/2002 11:14:21 AM
|
BLD-Foundation | 9/23/2002 | 9/24/2002 | 9/24/2002 | A | PASS |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 9/17/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Russ Owen
|
|
|
###-####
|
Inspection Record Card- Bld | | | 9/13/2002 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/9/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/6/2002 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 8/5/2002 | | 9/5/2002 | | PASS |
John Menard
|
|
|
9/5/2002 13:12:03 JCM - activity updated through activity BLDA022 from case BLD02-01851.
|
Routing - PLAN CHECK | 9/3/2002 | | 9/5/2002 | | |
|
|
|
|
Routing - FIRE | 9/5/2002 | | 9/5/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLAN CHECK | 9/5/2002 | | 9/5/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2002 | | PASS |
|
|
|
|
Telephone call | | | 9/5/2002 | | DONE |
|
|
|
CALLED ANDREW PLANS READY 9-5-02///DLD
|
Routing - FIRE | 8/28/2002 | | 9/3/2002 | | FAIL |
Bill Alexander
|
|
|
Lack hydrant flows for 6,004 ft/2, VN (2,000 gpm required). (UFC 903)
|
Plan Review Completed(1st rev) | | | 9/3/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/23/2002 | | 8/28/2002 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 8/28/2002 | | PASS |
|
|
|
Plans reviewed and approved as submitted with attached comment list. JCM
|
Routing - PLANNING | 8/12/2002 | | 8/23/2002 | | PASS |
|
|
|
Approved per CUP02-00078 Pass as submitted, Passed to DR for review 8/21/02.
Approved per DRH02-97. SMS 8/23/02
|
Routing - PLUMBING | 8/9/2002 | | 8/12/2002 | | PASS |
|
|
|
per plans and 2000 upc
|
Routing - PUBLIC WORKS | 8/2/2002 | | 8/8/2002 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 8/8/2002 | | 8/8/2002 | | PASS |
|
|
|
ESC plan is same as submitted for Baja Fresh. Same plan to be used for this development. See conditions attached to drawing.
|
Pending Assignment by JCM | 8/2/2002 | | 8/5/2002 | | DONE |
John Menard
|
|
|
8/5/2002 08:46:01 JCM - activity updated through activity BLDA166 from case BLD02-01851.
|
Plan routing begun/NEW & ADDTN | | | 8/2/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 8/2/2002 | | 8/2/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/2/2002 | | DONE |
|
|
|
|
First Notice | 8/1/2002 | 8/1/2002 | 8/1/2002 | | DONE |
|
|
|
|
Application received | | | 8/1/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/1/2002 | | DONE |
|
|
|
|