BLD-Final | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 4/10/2006 | 4/10/2006 | 4/10/2006 | P | PASS |
Jim Sly
|
|
|
|
BLD-Aging Inspection | 8/2/2004 | 8/2/2004 | 8/2/2004 | | DONE |
Jim Sly
|
|
|
EXP 8/3/2004 5:26:38 PM
|
BLD-Wall cover | 7/1/2003 | 7/2/2003 | 7/2/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/1/2003 at 1:04:26 PM. Final OK for Temp Occ. 7/2/2003 4:52:00 PM
|
FIRE-Final Inspection | 7/2/2003 | 7/2/2003 | 7/2/2003 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Inspection Record Card- Bld | | | 5/30/2003 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/28/2003 | 3/3/2003 | 3/3/2003 | P | PART |
Jim Sly
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs Shear OK (EXT.) on East 1/2 of bldg. (int. shear at front wall....later). 3/3/2003 2:20:31 PM
|
BLD-Framing/Rough-in | 2/7/2003 | 2/10/2003 | 2/10/2003 | A | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie OK'd to cover Soffit areas.....Electr pass. 2/10/2003 11:25:48 AM
|
BLD-Framing/Rough-in | 1/23/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Jim Sly
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Shear and roof nailing OK at West end.....(Prime cuts). 1/24/2003 12:09:55 PM
|
BLD-Foundation | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Jim Sly
|
|
|
walls; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Foundation | 11/8/2002 | 11/8/2002 | 11/8/2002 | P | PASS |
Jim Sly
|
|
|
walls; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Footing | 11/1/2002 | 11/4/2002 | 11/4/2002 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/01/2002 at 11:53:12. Contact: ###-####. Footing for front columns OK. 11/4/2002 2:17:19 PM
|
BLD-Foundation | 10/25/2002 | 10/28/2002 | 10/28/2002 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson Wall OK for Prime Cuts bldg. (West ..Near tree). 10/28/2002 9:03:10 AM
|
BLD-Foundation | 10/23/2002 | 10/24/2002 | 10/24/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 11:13:55. Contact: ###-####.
|
BLD-Footing | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/22/2002 at 09:43:41. Contact: .
|
BLD-Footing | 10/17/2002 | 10/18/2002 | 10/18/2002 | A | PART |
Russ Owen
|
|
|
###-####. footing only ok. 10/18/2002 10:43:30 AM
|
(F) Reprint permit | | | 10/18/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/17/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/3/2002 | | 10/8/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/8/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan assigned to (JCM) | 8/28/2002 | | 10/8/2002 | | PASS |
John Menard
|
|
|
10/8/2002 10:50:26 JCM - activity updated through activity BLDA022 from case BLD02-01923.
|
Routing Off Site - STRUCTURAL | 10/4/2002 | | 10/7/2002 | | PASS |
|
|
|
contacted PDQ to take resubmitted plans of 10/3/02 to outside eng. kmm
|
Routing - PLANNING | 10/1/2002 | | 10/3/2002 | | PASS |
|
|
|
Approve as noted on revised sheets SD1 and SD2 and as per DRH02-134.
|
Plan resubmittals received | | | 10/3/2002 | | DONE |
|
|
|
Received three sets of resubmittal sheets A1.1, A1.2, A2, A4, A5, A5.2, A5.3, A5.4, A5.5, A5.6, Calculations with cover letter. Routed to John Menard.
|
Routing - PUBLIC WORKS | 9/24/2002 | | 10/1/2002 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/17/2002 | | 9/23/2002 | | |
|
|
|
Routed letter from Bill Matter to John M.
|
Routing - Erosion and Sediment | 9/23/2002 | | 9/23/2002 | | PASS |
|
|
|
ESC Plan approved with conditions attached to plans.
|
Plan resubmittals requested | | | 9/20/2002 | | |
|
|
|
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals received | | | 9/20/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets "cover", A2.3, A4 with cover letter. routed to john menard.
|
Routing Off Site - STRUCTURAL | 8/29/2002 | | 9/20/2002 | | FAIL |
|
|
|
Called pdq to send to outside engineering. dkl Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing - FIRE | 9/13/2002 | | 9/16/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - Erosion and Sediment | 9/11/2002 | | 9/13/2002 | | FAIL |
|
|
|
An ESC plan narrative meeting the requirements of BCC 8-17 and Plan Designer Manual Appendix A & C has not been submitted
|
Routing - FIRE | 9/9/2002 | | 9/11/2002 | | FAIL |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/11/2002 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/28/2002 | | 9/9/2002 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 9/9/2002 | | DONE |
|
|
|
Received two copies of revised ESC sheets ES1 and topo and two copies of geotech report. Routed to John M. kmm
|
Plan resubmittals requested | | | 9/9/2002 | | FAIL |
|
|
|
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
|
Pending Assignment by JCM | 8/9/2002 | | 8/28/2002 | | DONE |
John Menard
|
|
|
8/28/2002 15:39:55 JCM - activity updated through activity BLDA166 from case BLD02-01923.
|
Routing - PLUMBING | 8/27/2002 | | 8/28/2002 | | PASS |
|
|
|
1. final connections to plumbing fixtures will be by a licensed plumbing contractor not the owner. sht p1.0 fixture schedule 2. each water heater needs an expansion tank 3. water closet flush handle must be to wide side of each hc water closet 4. service sink needs water outlet with valve for the addition of a soap dispensing unit.
|
Routing - PLANNING | 8/26/2002 | | 8/27/2002 | | FAIL |
|
|
|
Still need to receive Design Review Approval. Hearing scheduled for September 11th.
|
Routing - Erosion and Sediment | 8/22/2002 | | 8/26/2002 | | FAIL |
|
|
|
An ESC plan narrative meeting the requirements of 8-17 has not been submitted. A Drainage Facility Operaton & Maintance Manual is inadequate. Narrative statements to meet requirements in Appendix A and C of the Plan Designer Manual.
|
Routing - PUBLIC WORKS | 8/9/2002 | | 8/22/2002 | | FAIL |
|
|
|
these plans are being rejected from the addressing department only 12570 W Fairview Ave is a temp address and will change due to possible subdivision or private street AEM
No frontage, possible subdivision or private street. AEM
|
Plans ACCEPTED BY PLAN TECH | | | 8/9/2002 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/9/2002 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 8/9/2002 | | 8/9/2002 | | PASS |
|
|
|
|
Application received | | | 8/8/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/8/2002 | | DONE |
|
|
|
|
Fee Review-notes | 8/8/2002 | 8/8/2002 | | | |
|
|
|
|