Permanent occupancy UNPAID FEE | | | 3/28/2003 | | DONE |
|
|
|
Perm Occupancy # 9607 St Lukes in the America West bld 03/28/03
|
Permanent Occupancy | | 3/13/2003 | 3/13/2003 | | DONE |
|
|
|
|
BLD-Final | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | PASS |
Tom Arcoraci
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 3/13/2003 10:08:34 AM
|
FIRE-Final Inspection | 3/11/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Rick Jackson
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Darla Downs fire sprinkler riser room requires penetration fire stopping due to room being a 1 hr room for sprinkler control valve inside room; Ron will have patched for structural inspector 3/12/2003 9:23:12 AM
|
BLD-Final | 3/11/2003 | 3/12/2003 | 3/12/2003 | P | NR |
Carl Dependahl
|
|
|
RON; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Other | 2/25/2003 | 2/26/2003 | 2/26/2003 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 2/25/2003 at 12:00:00 PM. Contact: ###-####...clg at flouro-scan, Radial Tom. & MRI ok...need verify raised floor & cryo vent specs prior to final 2/26/2003 11:30:52 AM
|
BLD-Other | 2/21/2003 | 2/21/2003 | 2/21/2003 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 2/21/2003 at 7:50:31 AM. Contact: ###-####. ok to tile MRI and adjacent rms. 2/21/2003 2:21:35 PM
|
BLD-Other | 2/4/2003 | 2/5/2003 | 2/5/2003 | A | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 2/4/2003 at 11:07:09 AM. Contact: ###-####...frame follow-up, submit value for addn/change 2/5/2003 10:39:04 AM
|
BLD-Framing/Rough-in | 2/5/2003 | 2/5/2003 | 2/5/2003 | P | PART |
Carl Dependahl
|
|
|
Grid ...add pods, spreaders as reqd; as approved by elec...not in flouro & scan rms...2/5/2003 5:15:22 PM 2/5/2003 5:17:07 PM
|
BLD-Other | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 2/4/2003 at 7:28:08 AM. Contact: ###-####.
|
BLD-Conference | 1/7/2003 | 1/8/2003 | 1/9/2003 | P | PASS |
Carl Dependahl
|
|
|
Stan, rec'd detail for minor change, ok 1/9/2003 11:18:33 AM
|
BLD-Wall cover | 12/3/2002 | 12/4/2002 | 12/4/2002 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/03/2002 at 13:34:52. Contact: ###-####. ok to cover 12/4/2002 2:45:30 PM
|
Inspection Record Card- Bld | | | 10/23/2002 | | |
|
|
|
|
Print Occupancy Form | | | 10/23/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/22/2002 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 10/7/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2002 | | DONE |
|
|
|
SENT E-MAIL OFF TO CURTIS PLANS READY 10-2-02///DLD
|
Plan assigned to (DRS) | 8/20/2002 | | 10/2/2002 | | PASS |
Dan Stuart
|
|
|
10/2/2002 12:59:07 DRS - activity updated through activity BLDA022 from case BLD02-01949.
|
Routing - Erosion and Sediment | 9/25/2002 | | 10/2/2002 | | PASS |
|
|
|
Received Plan on 10/01/02.
ESC Plan approved with conditions attached to drawings.
|
Routing - PLAN CHECK | 10/2/2002 | | 10/2/2002 | | PASS |
|
|
|
Approved as noted and the attached comments and conditions of all plan reviewing agencies.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2002 | | PASS |
|
|
|
To permit desk for issue.
|
Plan resubmittals received | | | 10/1/2002 | | DONE |
|
|
|
Received two copies of ESC plan. Routed to Jim Rogers. kmm
|
Routing - PLAN CHECK | 9/5/2002 | | 9/25/2002 | | PEND |
|
|
|
Resubmittals inserted into plans & reviewed. Additional restroom added to plan resubmittals. Checked with Loiuse Waldorf, PW. Will need to route back for review. Also do not have Erosion & sediment Control approval. Called John Maulin, CSHQA, to see if plans had been submitted to Jim Rogers. John will follow up to see if complete.
|
Routing - PUBLIC WORKS | 9/25/2002 | | 9/25/2002 | | PASS |
|
|
|
Plan resubmittals added additional restroom. Plans routed back to PW per Louise Waldorf.
|
Routing - FIRE | 8/29/2002 | | 9/4/2002 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/4/2002 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 8/29/2002 | | FAIL |
|
|
|
Copy of plan review conditions needing response from design professionals faxed and mailed to architect.
|
Routing - PLAN CHECK | 8/26/2002 | | 8/29/2002 | | FAIL |
|
|
|
Clarifications and corrections needed. Copy of conditions needing response sent to architect for correction and clarification. Routing plans to fire code analyst for review.
|
Routing Off Site - STRUCTURAL | 8/12/2002 | | 8/27/2002 | | PASS |
|
|
|
Called PDQ to take to outside engineering. 8/27/02 - Received fax from outside structural engineer performing structural plan review for this project stating no structural deficiencies found and no further clarifications needed. copy of report in file and will be attached to plans.
|
Routing - Erosion and Sediment | 8/22/2002 | | 8/26/2002 | | FAIL |
|
|
|
No ESC plan submitted for review.
|
Routing - PUBLIC WORKS | 8/20/2002 | | 8/22/2002 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/22/2002 | | 8/22/2002 | | PASS |
|
|
|
1. provide additional water outlet at janitor sink w/valve for future soap dispensing equipment. 2. premise backflow protection may be required.
|
First Notice | 8/12/2002 | 8/12/2002 | 8/12/2002 | | DONE |
|
|
|
2/10/03-additional value of 10,000.00 per carl...lh
|
Plans ACCEPTED BY PLAN TECH | | | 8/12/2002 | | DONE |
|
|
|
1. Informed Curtis that an ESC prepared plan may be required for the utility trenching.
|
Application received | | | 8/12/2002 | | |
|
|
|
|