BLD-Final | 4/28/2003 | 4/29/2003 | 4/29/2003 | A | FAIL |
Dave Hannah
|
|
|
###-#### SCOTT needs to ionsulate rim in crawl everything else ok 4/29/2003 10:15:03 AM
|
BLD-Final | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 9:53:10 AM. c.c 22906 issued 4/29/2003 3:07:16 PM
|
DOC - Permit Finaled | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 4/29/2003 3:07:18 PM
|
BLD-Grading Inspection | 4/28/2003 | 4/28/2003 | 4/28/2003 | | BON |
Rita DeYoung
|
|
|
Rough grading is complete. Fine grading and revegetation are not complete. A $500.00 bond is recommended for the incomplete work. Upon receipt of this bond the grading and drainage are conditionally approved.
|
BLD-Framing/Rough-in | 12/23/2002 | 12/26/2002 | 12/26/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 10:14:06. Contact: .
|
BLD-Framing/Rough-in | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 23:37:58. Contact: .talked with contractor and crew doing sheet rock they will leave areas open in ceiling so bearing blocks can be installed and inspected ok to cover all but these areas 12/24/2002 10:50:37 AM
|
BLD-Energy code compliance | 12/20/2002 | 12/23/2002 | 12/23/2002 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 23:38:45. Contact: .
|
BLD-Framing/Rough-in | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 08:14:38. Contact: .need bearing blocks on girder thusses see truss engineering do not cover
12/20/2002 5:15:26 PM
|
BLD-Energy code compliance | 12/20/2002 | 12/20/2002 | 12/20/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2002 at 08:15:25. Contact: .
|
BLD-Framing/Rough-in | 12/16/2002 | 12/17/2002 | 12/17/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/16/2002 at 15:20:24. Contact: .c/n on site ok to insulate 12/17/2002 12:15:06 PM
|
BLD-Framing/Rough-in | 12/11/2002 | 12/12/2002 | 12/12/2002 | A | CANC |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 12/12/2002 | 12/12/2002 | 12/12/2002 | P | PART |
Dave Hannah
|
|
|
ext shear ok to cover ext 12/12/2002 1:19:11 PM
|
BLD-Framing/Rough-in | 12/10/2002 | 12/11/2002 | 12/11/2002 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung out of time. 12/11/2002 5:24:30 PM
|
BLD-Wall cover | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/09/2002 at 10:28:02. Contact: . need city aproved plans on site at time of inspection no inspection done at this time 12/9/2002 4:24:40 PM
|
BLD-Foundation | 9/23/2002 | 9/24/2002 | 9/24/2002 | P | PART |
Tom Arcoraci
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie wip ok 9/24/2002 1:58:27 PM
|
BLD-Foundation | 9/19/2002 | 9/19/2002 | 9/19/2002 | P | PART |
Tony Young
|
|
|
###-####
tall walls, wip 9/19/2002 3:17:14 PM
|
BLD-Footing | 9/17/2002 | 9/17/2002 | 9/17/2002 | P | PASS |
Dave Hannah
|
|
|
jerrad; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 9/13/2002 | 9/16/2002 | 9/16/2002 | A | PART |
Tony Young
|
|
|
jerrad; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
verbal ok on soil from T. R. 9/16/2002 12:34:45 PM
|
BLD-Grading Inspection | 9/16/2002 | 9/16/2002 | 9/16/2002 | | PASS |
Rita DeYoung
|
|
|
Geotechnical engineer has approved the footing subgrade
|
Issue PAID IN FULL permit | | | 9/4/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/4/2002 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 9/3/2002 | 9/3/2002 | 9/3/2002 | | PASS |
Dan Overy
|
|
|
9/3/2002 16:17:48 DJO - activity updated through activity BLDA022 from case BLD02-01961.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/3/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 9/3/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 9/3/2002 | | |
|
|
|
|
Routing - FIRE | 8/23/2002 | | 8/26/2002 | | DONE |
|
|
|
No fire sprinkler requirements for this lot (Nativa Terra lot 3, Block 2)
|
Routing - Erosion and Sediment | 8/22/2002 | | 8/23/2002 | | PASS |
|
|
|
ESC plan approved with conditions attached to drawings.
|
Routing - PLANNING | 8/19/2002 | | 8/21/2002 | | FAIL |
|
|
|
Do not issue until Appeal period closes at 5:00 p.m. on August 29, 2002 - Otherwise plans have been approved by Planning - Comply with Hillside CFH02-26 - Also note -
|
Routing - PUBLIC WORKS | 8/16/2002 | | 8/16/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/13/2002 | | 8/16/2002 | | PASS |
Rita DeYoung
|
|
|
Adpproved as Category I with conditions of approval in letter attached to plans.
|
Application received | | | 8/13/2002 | | |
|
|
|
|
Pending Assignment by DJO | 8/13/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 8/27/2002 | | | | |
|
|
|
|