Permit Information
Permit NumberBLD02-01975
StatusFinaled
Name CANYON CREST HOMES
Site Address 5168 N ARROW CREST WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 2877 sq. ft. one story single family dwelling with a 931 sq. ft. attached three car garage, a 46 sq. ft. covered entry stoop and covered concrete patio areas at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be required. PC #484 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/3/20036/5/20036/5/2003PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/3/2003 at 7:40:34 AM. Contact: ###-####.
DOC - Permit Expired6/5/20036/5/20036/5/2003PPASS
DetailsTom Arcoraci
Expired by inspector at 6/5/2003 3:52:08 PM
BLD-Final5/22/20035/27/20035/27/2003PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 5/22/2003 at 7:56:33 AM. Contact: ###-####.
c/n posted 5/27/2003 2:47:21 PM
BLD-Final4/10/20034/10/20034/10/2003PCANC
DetailsTony Young
JIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
called, need trades 1st 4/10/2003 3:19:25 PM
BLD-Final3/26/20033/27/20033/27/2003AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 3/26/2003 at 2:13:05 PM. Contact: ###-####.
need ALL trades 1st, also hillside 3/27/2003 11:33:03 AM
BLD-Grading Inspection3/27/20033/27/20033/27/2003 PASS
DetailsRita DeYoung
FINAL GRADING AND DRAINAGE APPROVED.
BLD-Energy code compliance10/29/200210/31/200210/31/2002PPASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/29/2002 at 15:25:54. Contact: ###-####.
BLD-Framing/Rough-in10/30/200210/30/200210/30/2002PPASS
DetailsTony Young
BLD-Framing/Rough-in10/29/200210/30/200210/30/2002ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 10/29/2002 at 15:25:08. Contact: ###-####.
BLD-Framing/Rough-in10/17/200210/17/200210/17/2002PPART
DetailsTony Young
SHEER ###-#### MIKE
ext. shear ok 10/17/2002 4:25:44 PM
BLD-Conference10/2/200210/2/200210/2/2002PPASS
DetailsTony Young
framing conference
BLD-Foundation9/16/20029/16/20029/16/2002PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 09/16/2002 at 08:15:13. Contact: ###-####. all of the rebar is in forms about 45% complete 9/16/2002 4:35:22 PM
Routing - PLANNING9/16/2002 9/16/2002 PASS
Revised site plan.
BLD-Footing9/13/20029/13/20029/13/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 09/13/2002 at 08:09:25. Contact: ###-####.
wip 9/13/2002 2:33:35 PM
BLD-Grading Inspection9/13/20029/13/20029/13/2002 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer
Issue PAID IN FULL permit  9/6/2002 DONE
Inspection Record Card- Bld  9/5/2002 DONE
Plan assigned to (DJO)9/4/20029/4/20029/4/2002 PASS
DetailsDan Overy
9/4/2002 14:36:19 DJO - activity updated through activity BLDA022 from case BLD02-01975.
PLANS/APPL TAKEN TO FRONT DESK  9/4/2002 DONE
Case Summary (BLD)  9/4/2002 DONE
Plan Review Report  9/4/2002 DONE
Plans ACCEPTED BY PLAN CHECK  9/4/2002  
Routing - FIRE8/23/2002 8/26/2002 DONE
No fire sprinkler requirement (Arrowhead Canyon #1)
Routing - Erosion and Sediment8/22/2002 8/23/2002 PASS
ESC plan approved with conditions attached to drawing.
Routing - PLANNING8/20/2002 8/22/2002 PASS
Routing - PUBLIC WORKS8/20/2002 8/20/2002 PASS
Routing - PUBLIC WORKS GRADING8/16/2002 8/19/2002 PASS
DetailsRita DeYoung
Approved as Category 3 with conditions of approval in letter attached to the plans
Application received  8/16/2002  
Pending Assignment by DJO8/16/2002    
DetailsDan Overy
Routing - PLAN CHECK8/27/2002