BLD-Final | 6/9/2003 | 6/10/2003 | 6/10/2003 | P | PASS |
Russ Owen
|
|
|
ZOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
DOC - Permit Finaled | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 6/10/2003 4:46:59 PM
|
BLD-Final | 4/23/2003 | 5/1/2003 | 5/1/2003 | A | FAIL |
Russ Owen
|
|
|
###-#### posted c/n. 5/1/2003 3:16:50 PM
|
BLD-Framing/Rough-in | 11/11/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/11/2002 at 16:09:21. Contact: ###-####.ok to drywall. 11/12/2002 10:44:52 AM
|
BLD-Conference | 11/8/2002 | 11/8/2002 | 11/8/2002 | A | CANC |
Russ Owen
|
|
|
|
BLD-Conference | 11/8/2002 | 11/8/2002 | 11/8/2002 | A | PART |
Russ Owen
|
|
|
will call for another frame inspection at existing. 11/8/2002 12:25:57 PM
|
BLD-Framing/Rough-in | 11/6/2002 | 11/7/2002 | 11/7/2002 | A | NR |
Russ Owen
|
|
|
###-#### I called con 11/7/2002 11:33:18 AM tractor and told him he still needs mec inspection but also the bath fan is not vented in attic.11/7/2002 11:33:50 AM 11/7/2002 11:34:17 AM
|
BLD-Framing/Rough-in | 10/31/2002 | 11/1/2002 | 11/1/2002 | P | PART |
Russ Owen
|
|
|
fr brent-- ###-####
|
BLD-Framing/Rough-in | 10/28/2002 | 10/29/2002 | 10/29/2002 | A | PASS |
Russ Owen
|
|
|
###-#### 10/28/2002 12:22:40 PM. Ok to side Talked with framer about shear requirements in the UBC, as he does most work out of town and this inspection is not required also explained the process of getting all trades approved prior to an interior frame inspection. 10/29/2002 10:19:34 AM
|
BLD-Framing/Rough-in | 10/28/2002 | 10/28/2002 | 10/28/2002 | P | FAIL |
Russ Owen
|
|
|
c/n. 10/28/2002 2:07:09 PM
|
BLD-Framing/Rough-in | 10/24/2002 | 10/24/2002 | 10/24/2002 | P | FAIL |
Russ Owen
|
|
|
partial ###-####. I called this number and left a message that I had posted a c/n on the plans in the garage. Machine did not have name of peson nore does this note did have verification of phone number. 10/24/2002 4:17:13 PM
|
BLD-Foundation | 8/23/2002 | 8/26/2002 | 8/26/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/23/2002 at 14:05:06. Contact: ###-####.
|
BLD-Footing | 8/21/2002 | 8/22/2002 | 8/22/2002 | A | PASS |
Dave Hannah
|
|
|
###-####
|
Application received | | | 8/21/2002 | | |
|
|
|
|
Plan assigned to (PEP) | 8/21/2002 | | 8/21/2002 | | PASS |
Perry Paine
|
|
|
8/21/2002 13:27:35 PEP - activity updated through activity BLDA022 from case BLD02-02003.
|
Print Pending Permit.LaserJet4 | | | 8/21/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/21/2002 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/21/2002 | | DONE |
|
|
|
|