Fee Review-notes | 8/23/2002 | 8/23/2002 | 8/10/2004 | | DONE |
|
|
|
|
Letter of compliance | | | 6/23/2004 | | DONE |
|
|
|
Letter of Compliance issued 6-23-04
|
BLD-Final | 6/21/2004 | 6/21/2004 | 6/21/2004 | P | PASS |
Dave Hannah
|
|
|
Andy, ###-#### - hand rail is now installed at top of ramp - please confirm & let me know. Thanks, Cathy ~ ok for occ 6/21/2004 2:31:06 PM
|
BLD-Final | 5/28/2004 | 6/1/2004 | 6/1/2004 | P | NR |
Dave Hannah
|
|
|
Andy, ###-#### finish gard rail at top of ada ramp 6/1/2004 2:40:43 PM
|
BLD-Final | 5/26/2004 | 5/27/2004 | 5/27/2004 | A | FAIL |
Russ Owen
|
|
|
I have the card - everything signed off. Please confirm steel ramp has been installed & approved (located behind bldg.) Thanks, Cathy ~. No plans for the ramp on site, also guardrail at landing is not 42in high and needs addnl guard rail at the east end. 5/27/2004 12:26:38 PM
|
BLD-Final | 5/26/2004 | 5/26/2004 | 5/26/2004 | | NH |
Jim Sly
|
|
|
I have the occ. card - please confirm that steel ramp on back of bldg. has been completed. That is the only issue holding this project up. Thanks ~ Cathy
|
Plan Reviewer's activity | | | 3/1/2004 | | |
|
|
|
The ramp at the North door was changed from concrete to steel. See the deferred submittal and the plan review report attached to it.
|
Plan resubmittals received | | | 2/23/2004 | | DONE |
|
|
|
Received two copies of revised sheets 2,4 & E. Routed to Carl W. kmm
|
BLD-Conference | 2/10/2004 | 2/10/2004 | 2/10/2004 | P | DONE |
Dave Hannah
|
|
|
dennis ###-#### -call 1st before insp
|
BLD-Conference | 12/19/2003 | 12/22/2003 | 12/22/2003 | A | CANC |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Plan Reviewer's activity | | | 11/19/2003 | | DONE |
|
|
|
Completed the review of the new concrete ramp. This was a deferred submittal item. The design was approved.
|
Telephone call | | | 11/19/2003 | | DONE |
|
|
|
Called the architect to tell him that his concrete ramp was approved. Told him he could pick up his copy.
|
Plan resubmittals received | | | 11/13/2003 | | DONE |
|
|
|
Received two copies of sheets A1A, S1.1, two copies of Calculations for ramp and one copy of cover letter. Routed to Carl W. kmm
|
Office Staff conference/action | | | 10/27/2003 | | DONE |
|
|
|
Temp. Occ. Cert. continued thru 1-1-04 per Tim Hogland.
|
BLD-Final | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | FAIL |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore A D A ramp out the back door not installed 9/3/2003 12:21:44 PM
|
BLD-Conference | 8/9/2003 | 8/11/2003 | 8/11/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 8/9/2003 at 9:02:58 AM. Contact: ###-####....re handrail c/n, need detail of fix. 8/11/2003 12:32:01 PM
|
BLD-Final | 8/3/2003 | 8/4/2003 | 8/4/2003 | P | PART |
Carl Dependahl
|
|
|
ok for t/o...c/n re rails, etc. 8/4/2003 4:17:29 PM
|
FIRE-Final Inspection | 7/31/2003 | 8/1/2003 | 8/1/2003 | A | PASS |
Rick Jackson
|
|
|
###-#### fire/life safety okay; signed temp occ for Carl D. 8/1/2003 4:20:26 PM
|
Temporary occupancy | | | 8/1/2003 | | DONE |
|
|
|
Temp. Occ. Cert. #4980 issued 8-1-03 to the Sawtooth Mountain Gentlemen's Club.
|
BLD-Final | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | FAIL |
Carl Dependahl
|
|
|
###-#### dennis, c/n rails, firestops at bsmt, dampers, signatures... 7/31/2003 12:15:10 PM
|
BLD-Framing/Rough-in | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | DONE |
Dave Hannah
|
|
|
###-#### no framing to look at pre walked with contractor befor final 7/30/2003 10:55:49 AM
|
BLD-Conference | 7/15/2003 | 7/17/2003 | 7/17/2003 | A | PASS |
Carl Dependahl
|
|
|
need reactivate hvac, plbg permits. 7/17/2003 11:58:54 AM
|
BLD-Conference | 7/15/2003 | 7/15/2003 | 7/15/2003 | P | PASS |
Carl Dependahl
|
|
|
w/mech contractor, need advise re hood 7/15/2003 5:26:52 PM
|
BLD-Final | 3/3/2003 | | 3/3/2003 | A | CANC |
Carl Dependahl
|
|
|
i put wrong bld # in ///dld
|
BLD-Framing/Rough-in | 10/31/2002 | 11/1/2002 | 11/1/2002 | P | PART |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/31/2002 at 19:18:59. Contact: ###-####....partition walls ok 11/1/02 5:34:30 PM
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | PASS |
Carl Dependahl
|
|
|
###-####...hood & shaft postponed 11/1/02 5:34:07 PM
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | DONE |
Tom Arcoraci
|
|
|
###-####
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | CANC |
Dave Hannah
|
|
|
###-####
|
BLD-Conference | 11/1/2002 | 11/1/2002 | 11/1/2002 | P | CANC |
Carl Dependahl
|
|
|
|
BLD-Framing/Rough-in | 10/23/2002 | 10/23/2002 | 10/23/2002 | P | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 10/23/2002 at 07:51:55. Contact: ###-####...ok to rock int partitions as ok'd. 10/23/02 4:43:38 PM
|
Plan resubmittals received | | | 10/22/2002 | | FAIL |
Lee Rice
|
|
|
Received two sets of resubmittal sheets P0.1 and P1.0 with cover letter. Routed to Bill Vandegrift. Turned down. Public Works is requiring a 1000 gallon interceptor according to the original approved plans. This resubmittal is turned down by Walt B. and correspondingly us because it only has a grease trap shown.
|
Issue PAID IN FULL permit | | | 9/30/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/25/2002 | | 9/25/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 9/25/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/25/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/25/2002 | | DONE |
|
|
|
called Steve ###-####
|
Plan assigned to (CJW) | 8/27/2002 | | 9/25/2002 | | PASS |
Carl Westfall
|
|
|
9/25/2002 11:02:57 CJW - activity updated through activity BLDA022 from case BLD02-02026.
|
Routing - PLANNING | 9/20/2002 | | 9/25/2002 | | PASS |
|
|
|
Approved per building plans and as noted on plans.
|
Plan resubmittals received | | | 9/23/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets A1.0 and A0.0 with cover letter. Routed to Carl Westfall.
|
Routing - PLAN CHECK | 9/18/2002 | | 9/20/2002 | | PASS |
|
|
|
(9-19-02) Approved after resubmittal review. Being held until requested by Planning.
|
Routing - FIRE | 9/18/2002 | | 9/18/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 9/12/2002 | | 9/18/2002 | | |
|
|
|
Failed first Planning review. Please see letter, dated September 18, 2002, requiring a conditional use permit for parking reduction. The parking reduction is based on the number of seats shown on the remodel floor plan.
|
Routing - Erosion and Sediment | 9/11/2002 | | 9/12/2002 | | PASS |
|
|
|
Waiver from ESC plan requirement approved with conditions attached to drawings. ESC permit and responsible person required.
See requirements under special conditions attached to drawings.
|
Plan resubmittals received | | | 9/12/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets A0.0, A1.0, A2.0 with cover letter and response sheet. Routed to Carl Westfall.
|
Routing - FIRE | 9/6/2002 | | 9/11/2002 | | |
|
|
|
Failed first UFC review.
|
Plan Review Completed(1st rev) | | | 9/11/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/3/2002 | | 9/6/2002 | | |
|
|
|
Failed first UBC review. UBC plan review started September 5, 2002 and finished the next day. A response from the architect was required. See the conditions list.
|
Routing - PUBLIC WORKS | 8/27/2002 | | 8/30/2002 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/30/2002 | | 8/30/2002 | | PASS |
|
|
|
|
Additional plans submitted | | | 8/26/2002 | | DONE |
|
|
|
Received erosion and sediment control plan waiver letter. Attached to plans.
|
Plans ACCEPTED BY PLAN TECH | | | 8/23/2002 | | DONE |
|
|
|
1. Waiver letter for ESC will be submitted on 8/26/02. Fees already paid. 2. CDH approval by Bob Jue.
|
Application received | | | 8/23/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/23/2002 | | DONE |
|
|
|
|