Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberBLD02-02126
StatusFinaled
Name VELTEX BUILDING LLC
Site Address 420 W MAIN ST
Project NameVELTEX BUILDING-SHELL
Customer Number 
ePlanReviewNo
Description
(VELTEX BUILDING-SHELL) To construct a new five-story, with a basement parking garage, 53,265 sq.ft. Type II 1-Hour, shell and core mixed-use building. NOTE: Stand pipes and the installation of a NFPA 13 fire sprinkler system is required for story increase and can not be used for any ather purpose. GRADING PERMIT # BLD 02-02575 & ESC 02-00403 PC#563-02 MJP DRH01-00023 TW CUP98-00065 SR
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/22/2009  
Case Summary (BLD)  1/22/2009  
(F) Reprint permit  9/14/2007  
Case Summary (BLD)  2/11/2005  
Case Summary (BLD)  12/6/2004  
Fee Review-notes9/4/20029/4/20028/10/2004 DONE
PubWorks Occupancy Approval5/28/20045/28/20045/28/2004 DONE
Drainage project complete, signed permanent occupancy 5/28/04. M.Strasser
BLD-Final5/27/20045/28/20045/28/2004APASS
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 5/28/2004 10:32:35 AM
Letter of compliance  5/28/2004 DONE
Letter of Compliance issued 5-28-04.
Code Occupancy Approval5/27/20045/27/20045/27/2004APASS
DetailsWm. Michael Meloy
Compliance met. 5/27/2004 12:18:16 PM
Code Occupancy Approval  5/27/2004  
DetailsWm. Michael Meloy
FIRE-Alarm Testing5/18/20045/19/20045/19/2004APASS
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
Telephone call  5/7/2004 DONE
Fire Alarm Plans on HOLD until receipt of revised matrix and battery calculations from Rob Ahten, Protex.
Case Summary (BLD)  4/14/2004 DONE
BLD-Framing/Rough-in2/11/20042/12/20042/12/2004APART
DetailsDave Hannah
jim ###-#### 4th floor ceiling grid in corr 2/12/2004 10:02:37 AM
BLD-Framing/Rough-in2/11/20042/12/20042/12/2004APART
DetailsDave Hannah
jim ###-#### 4th floor ceiling grid in corr 2/12/2004 10:02:37 AM
Temporary occupancy  1/16/2004 DONE
Temp. Occ. Cert. # 5064 issued 1-16-04 to the Veltex Bldg. shell and core.
FIRE-Final Inspection1/13/20041/14/20041/14/2004APART
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Dave Miller a temp occupancy is approved pending review/inspection of fire alarm resubmittals 1/14/2004 3:08:20 PM
BLD-Final1/13/20041/14/20041/14/2004ANR
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final1/14/20041/14/20041/14/2004PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ needsalarm sign off finish shell 4th floore xt 1/14/2004 5:16:40 PM
FIRE-Final Inspection1/12/20041/13/20041/13/2004AFAIL
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Mike Phillips resubmittals needed for access control doors that are located on the south side exit; need approval of fire alarm plan resubmittals 1/13/2004 1:48:59 PM
BLD-Final1/13/20041/13/20041/13/2004PFAIL
DetailsDave Hannah
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore mike has a list of corrections 1/13/2004 3:54:09 PM
FIRE-Final Inspection1/9/20041/12/20041/12/2004PFAIL
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need stairwell signage; verify labels on all rated doors; remove baggies from heads on second floor; clean sprinkler head in HC parking stall; add signage on all sprinler drains; add concealer escutcheons on second floor restroom heads 1/12/2004 3:29:43 PM
Code Occupancy Approval Temp1/8/20041/8/20041/8/2004PDONE
DetailsWm. Michael Meloy
Approved bonding for $6,000.00 for landscaping and temp occupancy of third floor. 1/8/2004 1:37:48 PM
FIRE-Final Inspection1/5/20041/8/20041/8/2004AFAIL
DetailsRick Jackson
mike-- ###-#### need to complete alarm and sprinkler permits; need to complete stairwells for egress to include doors and lights 1/8/2004 11:16:01 AM
BLD-Framing/Rough-in1/6/20041/7/20041/7/2004PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in12/2/200312/2/200312/2/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor column 1hr sheetrock rappes 12/2/2003 4:54:56 PM
BLD-Framing/Rough-in12/1/200312/1/200312/1/2003PFAIL
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shaft around piping in stair towers 12/1/2003 2:39:46 PM
BLD-Framing/Rough-in11/18/200311/19/200311/19/2003APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes mec shaft and 2hr wall on 4th floor 11/19/2003 12:55:10 PM
BLD-Framing/Rough-in11/13/200311/13/200311/13/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2nd floor columns ok to cover also ok to start covering thier floor ext wall columns and walls alley side 11/13/2003 2:37:06 PM
BLD-Energy code compliance11/12/200311/13/200311/13/2003ACANC
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
FIRE-Conference11/12/200311/12/200311/12/2003PPART
DetailsRick Jackson
met with GC and Dave Hannah about shell sign-off and third floor occupancy; they will need to get approval from Dave Miller for temp if needed
BLD-Conference11/10/200311/12/200311/12/2003ACANC
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time 11/12/2003 1:56:12 PM
BLD-Framing/Rough-in11/6/200311/7/200311/7/2003APART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing for hard lids bathrooms and ramp into basement also columns on third floor ok to cover int 11/7/2003 1:57:24 PM
BLD-Framing/Rough-in10/8/200310/9/200310/9/2003ADONE
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Framing/Rough-in10/9/200310/9/200310/9/2003PPART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2rd floor bath rooms walls ok to cover 10/9/2003 1:19:14 PM
BLD-Framing/Rough-in9/30/200310/1/200310/1/2003APART
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to insulate 3rd floor ext walls 10/1/2003 11:01:59 AM
BLD-Framing/Rough-in9/24/20039/25/20039/25/2003APART
DetailsDave Hannah
mike- ###-#### looked at steel studs ok to cover storage rooms in basement 9/25/2003 1:38:41 PM
BLD-Framing/Rough-in9/24/20039/24/20039/24/2003PPART
DetailsDave Hannah
mike- ###-#### on site but no one here 9/24/2003 7:59:30 PM
Override - Parcel Holds  9/24/2003  
BLD-Framing/Rough-in6/26/20036/27/20036/27/2003PPART
DetailsCarl Dependahl
mike...rec'd reports, wip....need clarify fire rating of occ sep. 6/27/2003 2:25:57 PM
BLD-Conference6/25/20036/26/20036/26/2003APASS
DetailsCarl Dependahl
rec'd spray-on 6/26/2003 11:27:00 AM rec'd spray-on f.p. detail, need all specs 6/26/2003 11:27:00 AM 6/26/2003 11:27:35 AM
BLD-Conference6/25/20036/26/20036/26/2003PPASS
DetailsCarl Dependahl
ok to substitute DCF for cafco300 as fire proof mat'l. 6/27/2003 6:24:03 PM
BLD-Conference6/24/20036/25/20036/25/2003ANR
DetailsCarl Dependahl
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore...need TOW detailed. 6/25/2003 4:40:42 PM 6/25/2003 4:42:01 PM
BLD-Conference6/25/20036/25/20036/25/2003PCANC
DetailsCarl Dependahl
###-####
BLD-Conference6/25/20036/25/20036/25/2003ACANC
DetailsCarl Dependahl
Mike
BLD-Conference6/24/20036/24/20036/24/2003PPASS
DetailsCarl Dependahl
mike; re: T.O.W. assys at rated lid...install per detail 6/24/2003 2:17:47 PM
Case Summary (BLD)  6/16/2003  
BLD-Conference5/19/20035/20/20035/20/2003PPART
DetailsCarl Dependahl
WIP; advised Mike Mason & MTI that city not getting insp reports...masonry wip. 5/20/2003 1:05:58 PM
BLD-Footing3/12/20033/13/20033/13/2003APART
DetailsTom Arcoraci
###-#### spec insp 3/13/2003 9:14:50 AM
BLD-Conference3/12/20033/12/20033/12/2003APASS
DetailsCarl Dependahl
W/ Mike Mason, Jordan-Wilcomb supt...need city insp requests & all spec insp doc's for project . No reports have been rec'd by me at this time, WIP
(F) Reprint permit  1/24/2003  
Issue PAID IN FULL permit  1/23/2003 DONE
Plan assigned to (M_P)9/6/20029/6/200212/19/2002 PASS
DetailsMike Phillips
12/19/2002 10:00:13 M_P - activity updated through activity BLDA022 from case BLD02-02126.
Routing - PLAN CHECK12/13/2002 12/19/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/19/2002 DONE
Inspection Record Card- Bld  12/19/2002 DONE
Print Occupancy Form  12/19/2002  
Plan resubmittals received  12/16/2002 DONE
Received two copies of revised sheets a0.11, a2.11, a1.12, a2.13, a2.31, a2.32, a5.00, a5.10, a5.11, a6.11, s2.0, s6.0, s6.4, m3.00, e1.03, e1.06, response letter comments, structural calculations III, structural calculations.II, conceptual layouts for condo units and occupant loads with patios. Cheryl of Erstad put with plans, then routed to Mike P. kmm
Routing - PLANNING12/12/2002 12/13/2002 PASS
Approve per DR and CU.
Routing - PLAN CHECK11/26/2002 12/12/2002 FAIL
12/6/02 * Sent second set of corrections. Requesting additional information be submitted for further review.
Routing - FIRE12/6/2002 12/11/2002 PASS
DetailsBill Alexander
Approved on approval by BLD planner.
Routing Off Site - STRUCTURAL11/21/2002 12/3/2002 PASS
Contacted PDQ to take plans to outside eng. kmm
Sent commets to architect no further veivew required by outside engineering firm.
Routing - FIRE11/21/2002 11/26/2002 FAIL
DetailsBill Alexander
Requires addressing of generator issues.
Building Dept. verifying the following:
A. Provide minimum occupancy separation details/information meeting UFC Table 3-B.
B. Provide construction details/information for east exterior facing wall, meeting required protection per UFC Table 5-A.
C. Provide minimum egress requirements meeting UFC Table 10-A.
Plan resubmittals received  11/21/2002 DONE
Received three copies of revised sheets S1.0, S2.0, S2.1, S3.0,S3.1, S3.2, S3.3, S4.0, S5.0, S6.0, S6.1, S6.2, S6.3, S6.4, S6.5, S6.6, S7.0, S7.1. Cheryl of Erstad put with plans. kmm
Meeting  11/21/2002 DONE
Cheryl from erstad came and put resubmittals from 11.21.02 and 11.18.02 with plans. KMM
Routing - PLAN CHECK11/12/2002 11/21/2002  
Plan resubmittals received  11/18/2002 DONE
At 4:50 pm, received three copies of revised sheets a0.02, a0.11, c1.0, c2.0 c3.0, c4.0, a1.21, a2.11, a2.12, a2.13, a2.31, a3.11, a3.21, a3.22, a4.11, a4.12, a5.00, a5.10, a5.12, a6.11, a6.12, a6.13, s2.0, s2.1, s3.0 s3.1, s5.0, s6.3, s6.4, p1.00, p2.00, p3.00, p4.00, p5.00 m1.00, m2.00, m3.00, m4.00, m5.00, m6.00, e.00, e1.01, e1.02 e1.03, e1.04, e1.05, e1.06, e1.07, e1.08, f1.0, f1.1, f1.2, f1.3, f1.4.
response letter, structural calculation, temporary license agreement with ACHD, ACHD license amendment, GFRC information, example of rated fireproofing for wide flange beams, conceptual layouts for condo units and occupant loads are attached for review. Contacted Andy Erstad to come and put resubmitted plans in to plan review sets. kmm
Plan resubmittals received  11/15/2002 DONE
Received three copies of resubmittal sheets S2.0, S2.1, S5.0, Structural calculations with transmittal letter. Routed to Mike Phillips.
Additional plans submitted  11/12/2002 DONE
Received one copy of letter requesting review of Elevators to include drawing a4.11. Routed to Mike Phillips.
Routing - PLANNING Land Div11/1/2002 11/8/2002 PASS
Quit Claim Deed #102114518, recorded October 3, 2002.
Routing - Erosion and Sediment10/31/2002 11/1/2002 PASS
ESC approved with conditions attached to plans.
Routing - PUBLIC WORKS10/29/2002 10/31/2002 PASS
Routing - FIRE10/24/2002 10/29/2002 FAIL
DetailsBill Alexander
1. Provide the information required by the UBC Planner, Mike Phillips, specifically all items which relate with the UFC.
A. Provide minimum occupancy separation details/information meeting UFC Table 3-B.
B. Provide construction details/information for east exterior facing wall, meeting required protection per UFC Table 5-A.
C. Provide minimum egress requirements meeting UFC Table 10-A.
D. Provide required verbiage of standpipe systems for buildings under construction to be installed as required for permanent standpipe systems. Information/details indicating standpipes with 2½" fire department hose connections shall be required at accessible locations adjacent to usable stairs for use during construction phase. The standpipe shall be extended during the construction progress to within one floor of the highest point of construction having secured decking or floor. Temporary standpipes are allowed to be in place of permanent systems if they are designed to furnish 500 gallons of water per minute at 50 pounds per square inch pressure with a standpipe size of not less than 4 inches. All outlets shall not be less than 2½ inches. (UFC 8704.4.3).
E. This facility will require fire booster pump for required standpipe flows. The standpipe system shall be wet unless building design requires modification to require a full dry. If a dry is provided, then it shall be an Automatic Dry. (NFPA 14:3-5.1, 3-2.1) Flow Rate for Class I systems (for the hydraulically most remote standpipe) shall be: 500 gpm flow @ 50 psi, minimum. The minimum flow rate for additional standpipes shall be 250 gpm per standpipe, with the total not to exceed 1250 gpm. For combined systems, see NFPA 14:5-9.1.3.
i) Provide detailed information/location, wiring, etc. for a required fire booster pump.
ii) The fire pump electrical supply shall be physically routed outside of the (designated) pump room.
iii) Where the fire pump electrical supply is routed through the building, it shall be buried or enclosed by 2" of concrete or minimum 1-hour fire resistive rated enclosure (NFPA 20:6-3.1.1).
iv) There shall be no disconnecting means within the fire pump feeder circuit (NFPA 20:6-3).
F. This facility will require a generator for secondary power supply. Provide detailed information/location, operation, fueling, wiring, etc. of required secondary power supply (generator).
Plan Review Completed(1st rev)  10/29/2002 DONE
Routing - PLAN CHECK10/11/2002 10/24/2002 FAIL
Plan review completed and sent correction report to architect requesting additional information for further review prior to issuing permit.
Additional plans submitted  10/21/2002 DONE
Received revised certificate of value, due to submission of grading and drainage permit on 10/18/02.
Received three copies of page #23 of the structural review comments. Routed to Mike Phillips.
Received Certificate of Value  10/21/2002  
Received revised Certificate of Value minus grading.
Plan resubmittals received  10/18/2002 DONE
Received three copies of revised sheets S1.0, S2.0, S3.0, S3.1, S3.2, S3.3, S4.0, S5.0, S6.0, S6.1, S6.2, S6.3, S6.4, S6.5, S6.6, S7.0, S7.1, and three copies of response letter and Supplemental Struct. calcs. Routed to John M. kmm
Plan resubmittals received  10/17/2002 DONE
Received two copies of resubmittal sheets ESC1.0 with (2) narratives and transmittal. Routed to Mike Phillips.
Routing - PLUMBING10/8/2002 10/11/2002 PASS
may need expansion protection with backflows.
Routing - PLANNING9/30/2002 10/8/2002 PASS
Approved per DRH01-23, CUP98-65 and memorandum dated 2-26-01 revising parking. The handicap parking space off the alley may not include deliveries in the access isle. Handicap parking required be 8' in width with a 5' 'wide access isle.
Plan resubmittals received  10/3/2002 DONE
Received three copies of revised sheets e-0 and e-1.1. Routed to Mike P. kmm
Routing Off Site - STRUCTURAL9/6/2002 10/1/2002 FAIL
Called pdq to take to outside engineering. dkl
Additional information required for further review. Faxed structural comments to architect.
Routing - Erosion and Sediment9/25/2002 9/30/2002 FAIL
ESC Plan does not meet requirements of BCC 8-17 or Appendix A&C of Plan Designer Manual.

Contacted Plan Designer on 9/30/02
Routing - PUBLIC WORKS9/9/2002 9/25/2002 FAIL
Requires drainage plan revision and ACHD nixed park lot drainage for four spaces in back. Per Brian M.
Routing - PLANNING Land Div9/6/2002 9/9/2002 FAIL
Need recorded deed with legal description of perimeter boundary. Called Andy Erstad on September 9, 2002.
Plans ACCEPTED BY PLAN TECH  9/6/2002 DONE
Application received  9/4/2002  
Recd Pcfee & Taken To Pln CK  9/4/2002 DONE