Case Summary (BLD) | | | 1/22/2009 | | |
|
|
|
|
Case Summary (BLD) | | | 1/22/2009 | | |
|
|
|
|
(F) Reprint permit | | | 9/14/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 2/11/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 12/6/2004 | | |
|
|
|
|
Fee Review-notes | 9/4/2002 | 9/4/2002 | 8/10/2004 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 5/28/2004 | 5/28/2004 | 5/28/2004 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 5/28/04. M.Strasser
|
BLD-Final | 5/27/2004 | 5/28/2004 | 5/28/2004 | A | PASS |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm occ 5/28/2004 10:32:35 AM
|
Letter of compliance | | | 5/28/2004 | | DONE |
|
|
|
Letter of Compliance issued 5-28-04.
|
Code Occupancy Approval | 5/27/2004 | 5/27/2004 | 5/27/2004 | A | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. 5/27/2004 12:18:16 PM
|
Code Occupancy Approval | | | 5/27/2004 | | |
Wm. Michael Meloy
|
|
|
|
FIRE-Alarm Testing | 5/18/2004 | 5/19/2004 | 5/19/2004 | A | PASS |
Rick Jackson
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Telephone call | | | 5/7/2004 | | DONE |
|
|
|
Fire Alarm Plans on HOLD until receipt of revised matrix and battery calculations from Rob Ahten, Protex.
|
Case Summary (BLD) | | | 4/14/2004 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Dave Hannah
|
|
|
jim ###-#### 4th floor ceiling grid in corr 2/12/2004 10:02:37 AM
|
BLD-Framing/Rough-in | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Dave Hannah
|
|
|
jim ###-#### 4th floor ceiling grid in corr 2/12/2004 10:02:37 AM
|
Temporary occupancy | | | 1/16/2004 | | DONE |
|
|
|
Temp. Occ. Cert. # 5064 issued 1-16-04 to the Veltex Bldg. shell and core.
|
FIRE-Final Inspection | 1/13/2004 | 1/14/2004 | 1/14/2004 | A | PART |
Rick Jackson
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Dave Miller a temp occupancy is approved pending review/inspection of fire alarm resubmittals 1/14/2004 3:08:20 PM
|
BLD-Final | 1/13/2004 | 1/14/2004 | 1/14/2004 | A | NR |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 1/14/2004 | 1/14/2004 | 1/14/2004 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ needsalarm sign off finish shell 4th floore xt 1/14/2004 5:16:40 PM
|
FIRE-Final Inspection | 1/12/2004 | 1/13/2004 | 1/13/2004 | A | FAIL |
Rick Jackson
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie per Mike Phillips resubmittals needed for access control doors that are located on the south side exit; need approval of fire alarm plan resubmittals 1/13/2004 1:48:59 PM
|
BLD-Final | 1/13/2004 | 1/13/2004 | 1/13/2004 | P | FAIL |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore mike has a list of corrections 1/13/2004 3:54:09 PM
|
FIRE-Final Inspection | 1/9/2004 | 1/12/2004 | 1/12/2004 | P | FAIL |
Rick Jackson
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need stairwell signage; verify labels on all rated doors; remove baggies from heads on second floor; clean sprinkler head in HC parking stall; add signage on all sprinler drains; add concealer escutcheons on second floor restroom heads 1/12/2004 3:29:43 PM
|
Code Occupancy Approval Temp | 1/8/2004 | 1/8/2004 | 1/8/2004 | P | DONE |
Wm. Michael Meloy
|
|
|
Approved bonding for $6,000.00 for landscaping and temp occupancy of third floor. 1/8/2004 1:37:48 PM
|
FIRE-Final Inspection | 1/5/2004 | 1/8/2004 | 1/8/2004 | A | FAIL |
Rick Jackson
|
|
|
mike-- ###-#### need to complete alarm and sprinkler permits; need to complete stairwells for egress to include doors and lights 1/8/2004 11:16:01 AM
|
BLD-Framing/Rough-in | 1/6/2004 | 1/7/2004 | 1/7/2004 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie second floor column 1hr sheetrock rappes 12/2/2003 4:54:56 PM
|
BLD-Framing/Rough-in | 12/1/2003 | 12/1/2003 | 12/1/2003 | P | FAIL |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shaft around piping in stair towers 12/1/2003 2:39:46 PM
|
BLD-Framing/Rough-in | 11/18/2003 | 11/19/2003 | 11/19/2003 | A | PART |
Dave Hannah
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes mec shaft and 2hr wall on 4th floor 11/19/2003 12:55:10 PM
|
BLD-Framing/Rough-in | 11/13/2003 | 11/13/2003 | 11/13/2003 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2nd floor columns ok to cover also ok to start covering thier floor ext wall columns and walls alley side 11/13/2003 2:37:06 PM
|
BLD-Energy code compliance | 11/12/2003 | 11/13/2003 | 11/13/2003 | A | CANC |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
FIRE-Conference | 11/12/2003 | 11/12/2003 | 11/12/2003 | P | PART |
Rick Jackson
|
|
|
met with GC and Dave Hannah about shell sign-off and third floor occupancy; they will need to get approval from Dave Miller for temp if needed
|
BLD-Conference | 11/10/2003 | 11/12/2003 | 11/12/2003 | A | CANC |
Dave Hannah
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes out of time 11/12/2003 1:56:12 PM
|
BLD-Framing/Rough-in | 11/6/2003 | 11/7/2003 | 11/7/2003 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie framing for hard lids bathrooms and ramp into basement also columns on third floor ok to cover int 11/7/2003 1:57:24 PM
|
BLD-Framing/Rough-in | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | DONE |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 10/9/2003 | 10/9/2003 | 10/9/2003 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore 2rd floor bath rooms walls ok to cover 10/9/2003 1:19:14 PM
|
BLD-Framing/Rough-in | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Darla Downs ok to insulate 3rd floor ext walls 10/1/2003 11:01:59 AM
|
BLD-Framing/Rough-in | 9/24/2003 | 9/25/2003 | 9/25/2003 | A | PART |
Dave Hannah
|
|
|
mike- ###-#### looked at steel studs ok to cover storage rooms in basement 9/25/2003 1:38:41 PM
|
BLD-Framing/Rough-in | 9/24/2003 | 9/24/2003 | 9/24/2003 | P | PART |
Dave Hannah
|
|
|
mike- ###-#### on site but no one here 9/24/2003 7:59:30 PM
|
Override - Parcel Holds | | | 9/24/2003 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/26/2003 | 6/27/2003 | 6/27/2003 | P | PART |
Carl Dependahl
|
|
|
mike...rec'd reports, wip....need clarify fire rating of occ sep. 6/27/2003 2:25:57 PM
|
BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 | A | PASS |
Carl Dependahl
|
|
|
rec'd spray-on 6/26/2003 11:27:00 AM rec'd spray-on f.p. detail, need all specs 6/26/2003 11:27:00 AM 6/26/2003 11:27:35 AM
|
BLD-Conference | 6/25/2003 | 6/26/2003 | 6/26/2003 | P | PASS |
Carl Dependahl
|
|
|
ok to substitute DCF for cafco300 as fire proof mat'l. 6/27/2003 6:24:03 PM
|
BLD-Conference | 6/24/2003 | 6/25/2003 | 6/25/2003 | A | NR |
Carl Dependahl
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Annette Moore...need TOW detailed. 6/25/2003 4:40:42 PM 6/25/2003 4:42:01 PM
|
BLD-Conference | 6/25/2003 | 6/25/2003 | 6/25/2003 | P | CANC |
Carl Dependahl
|
|
|
###-####
|
BLD-Conference | 6/25/2003 | 6/25/2003 | 6/25/2003 | A | CANC |
Carl Dependahl
|
|
|
Mike
|
BLD-Conference | 6/24/2003 | 6/24/2003 | 6/24/2003 | P | PASS |
Carl Dependahl
|
|
|
mike; re: T.O.W. assys at rated lid...install per detail 6/24/2003 2:17:47 PM
|
Case Summary (BLD) | | | 6/16/2003 | | |
|
|
|
|
BLD-Conference | 5/19/2003 | 5/20/2003 | 5/20/2003 | P | PART |
Carl Dependahl
|
|
|
WIP; advised Mike Mason & MTI that city not getting insp reports...masonry wip. 5/20/2003 1:05:58 PM
|
BLD-Footing | 3/12/2003 | 3/13/2003 | 3/13/2003 | A | PART |
Tom Arcoraci
|
|
|
###-#### spec insp 3/13/2003 9:14:50 AM
|
BLD-Conference | 3/12/2003 | 3/12/2003 | 3/12/2003 | A | PASS |
Carl Dependahl
|
|
|
W/ Mike Mason, Jordan-Wilcomb supt...need city insp requests & all spec insp doc's for project . No reports have been rec'd by me at this time, WIP
|
(F) Reprint permit | | | 1/24/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 1/23/2003 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/6/2002 | 9/6/2002 | 12/19/2002 | | PASS |
Mike Phillips
|
|
|
12/19/2002 10:00:13 M_P - activity updated through activity BLDA022 from case BLD02-02126.
|
Routing - PLAN CHECK | 12/13/2002 | | 12/19/2002 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/19/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/19/2002 | | |
|
|
|
|
Plan resubmittals received | | | 12/16/2002 | | DONE |
|
|
|
Received two copies of revised sheets a0.11, a2.11, a1.12, a2.13, a2.31, a2.32, a5.00, a5.10, a5.11, a6.11, s2.0, s6.0, s6.4, m3.00, e1.03, e1.06, response letter comments, structural calculations III, structural calculations.II, conceptual layouts for condo units and occupant loads with patios. Cheryl of Erstad put with plans, then routed to Mike P. kmm
|
Routing - PLANNING | 12/12/2002 | | 12/13/2002 | | PASS |
|
|
|
Approve per DR and CU.
|
Routing - PLAN CHECK | 11/26/2002 | | 12/12/2002 | | FAIL |
|
|
|
12/6/02 * Sent second set of corrections. Requesting additional information be submitted for further review.
|
Routing - FIRE | 12/6/2002 | | 12/11/2002 | | PASS |
Bill Alexander
|
|
|
Approved on approval by BLD planner.
|
Routing Off Site - STRUCTURAL | 11/21/2002 | | 12/3/2002 | | PASS |
|
|
|
Contacted PDQ to take plans to outside eng. kmm
Sent commets to architect no further veivew required by outside engineering firm.
|
Routing - FIRE | 11/21/2002 | | 11/26/2002 | | FAIL |
Bill Alexander
|
|
|
Requires addressing of generator issues.
Building Dept. verifying the following:
A. Provide minimum occupancy separation details/information meeting UFC Table 3-B.
B. Provide construction details/information for east exterior facing wall, meeting required protection per UFC Table 5-A.
C. Provide minimum egress requirements meeting UFC Table 10-A.
|
Plan resubmittals received | | | 11/21/2002 | | DONE |
|
|
|
Received three copies of revised sheets S1.0, S2.0, S2.1, S3.0,S3.1, S3.2, S3.3, S4.0, S5.0, S6.0, S6.1, S6.2, S6.3, S6.4, S6.5, S6.6, S7.0, S7.1. Cheryl of Erstad put with plans. kmm
|
Meeting | | | 11/21/2002 | | DONE |
|
|
|
Cheryl from erstad came and put resubmittals from 11.21.02 and 11.18.02 with plans. KMM
|
Routing - PLAN CHECK | 11/12/2002 | | 11/21/2002 | | |
|
|
|
|
Plan resubmittals received | | | 11/18/2002 | | DONE |
|
|
|
At 4:50 pm, received three copies of revised sheets a0.02, a0.11, c1.0, c2.0 c3.0, c4.0, a1.21, a2.11, a2.12, a2.13, a2.31, a3.11, a3.21, a3.22, a4.11, a4.12, a5.00, a5.10, a5.12, a6.11, a6.12, a6.13, s2.0, s2.1, s3.0 s3.1, s5.0, s6.3, s6.4, p1.00, p2.00, p3.00, p4.00, p5.00 m1.00, m2.00, m3.00, m4.00, m5.00, m6.00, e.00, e1.01, e1.02 e1.03, e1.04, e1.05, e1.06, e1.07, e1.08, f1.0, f1.1, f1.2, f1.3, f1.4.
response letter, structural calculation, temporary license agreement with ACHD, ACHD license amendment, GFRC information, example of rated fireproofing for wide flange beams, conceptual layouts for condo units and occupant loads are attached for review. Contacted Andy Erstad to come and put resubmitted plans in to plan review sets. kmm
|
Plan resubmittals received | | | 11/15/2002 | | DONE |
|
|
|
Received three copies of resubmittal sheets S2.0, S2.1, S5.0, Structural calculations with transmittal letter. Routed to Mike Phillips.
|
Additional plans submitted | | | 11/12/2002 | | DONE |
|
|
|
Received one copy of letter requesting review of Elevators to include drawing a4.11. Routed to Mike Phillips.
|
Routing - PLANNING Land Div | 11/1/2002 | | 11/8/2002 | | PASS |
|
|
|
Quit Claim Deed #102114518, recorded October 3, 2002.
|
Routing - Erosion and Sediment | 10/31/2002 | | 11/1/2002 | | PASS |
|
|
|
ESC approved with conditions attached to plans.
|
Routing - PUBLIC WORKS | 10/29/2002 | | 10/31/2002 | | PASS |
|
|
|
|
Routing - FIRE | 10/24/2002 | | 10/29/2002 | | FAIL |
Bill Alexander
|
|
|
1. Provide the information required by the UBC Planner, Mike Phillips, specifically all items which relate with the UFC.
A. Provide minimum occupancy separation details/information meeting UFC Table 3-B.
B. Provide construction details/information for east exterior facing wall, meeting required protection per UFC Table 5-A.
C. Provide minimum egress requirements meeting UFC Table 10-A.
D. Provide required verbiage of standpipe systems for buildings under construction to be installed as required for permanent standpipe systems. Information/details indicating standpipes with 2½" fire department hose connections shall be required at accessible locations adjacent to usable stairs for use during construction phase. The standpipe shall be extended during the construction progress to within one floor of the highest point of construction having secured decking or floor. Temporary standpipes are allowed to be in place of permanent systems if they are designed to furnish 500 gallons of water per minute at 50 pounds per square inch pressure with a standpipe size of not less than 4 inches. All outlets shall not be less than 2½ inches. (UFC 8704.4.3).
E. This facility will require fire booster pump for required standpipe flows. The standpipe system shall be wet unless building design requires modification to require a full dry. If a dry is provided, then it shall be an Automatic Dry. (NFPA 14:3-5.1, 3-2.1) Flow Rate for Class I systems (for the hydraulically most remote standpipe) shall be: 500 gpm flow @ 50 psi, minimum. The minimum flow rate for additional standpipes shall be 250 gpm per standpipe, with the total not to exceed 1250 gpm. For combined systems, see NFPA 14:5-9.1.3.
i) Provide detailed information/location, wiring, etc. for a required fire booster pump.
ii) The fire pump electrical supply shall be physically routed outside of the (designated) pump room.
iii) Where the fire pump electrical supply is routed through the building, it shall be buried or enclosed by 2" of concrete or minimum 1-hour fire resistive rated enclosure (NFPA 20:6-3.1.1).
iv) There shall be no disconnecting means within the fire pump feeder circuit (NFPA 20:6-3).
F. This facility will require a generator for secondary power supply. Provide detailed information/location, operation, fueling, wiring, etc. of required secondary power supply (generator).
|
Plan Review Completed(1st rev) | | | 10/29/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/11/2002 | | 10/24/2002 | | FAIL |
|
|
|
Plan review completed and sent correction report to architect requesting additional information for further review prior to issuing permit.
|
Additional plans submitted | | | 10/21/2002 | | DONE |
|
|
|
Received revised certificate of value, due to submission of grading and drainage permit on 10/18/02.
Received three copies of page #23 of the structural review comments. Routed to Mike Phillips.
|
Received Certificate of Value | | | 10/21/2002 | | |
|
|
|
Received revised Certificate of Value minus grading.
|
Plan resubmittals received | | | 10/18/2002 | | DONE |
|
|
|
Received three copies of revised sheets S1.0, S2.0, S3.0, S3.1, S3.2, S3.3, S4.0, S5.0, S6.0, S6.1, S6.2, S6.3, S6.4, S6.5, S6.6, S7.0, S7.1, and three copies of response letter and Supplemental Struct. calcs. Routed to John M. kmm
|
Plan resubmittals received | | | 10/17/2002 | | DONE |
|
|
|
Received two copies of resubmittal sheets ESC1.0 with (2) narratives and transmittal. Routed to Mike Phillips.
|
Routing - PLUMBING | 10/8/2002 | | 10/11/2002 | | PASS |
|
|
|
may need expansion protection with backflows.
|
Routing - PLANNING | 9/30/2002 | | 10/8/2002 | | PASS |
|
|
|
Approved per DRH01-23, CUP98-65 and memorandum dated 2-26-01 revising parking. The handicap parking space off the alley may not include deliveries in the access isle. Handicap parking required be 8' in width with a 5' 'wide access isle.
|
Plan resubmittals received | | | 10/3/2002 | | DONE |
|
|
|
Received three copies of revised sheets e-0 and e-1.1. Routed to Mike P. kmm
|
Routing Off Site - STRUCTURAL | 9/6/2002 | | 10/1/2002 | | FAIL |
|
|
|
Called pdq to take to outside engineering. dkl
Additional information required for further review. Faxed structural comments to architect.
|
Routing - Erosion and Sediment | 9/25/2002 | | 9/30/2002 | | FAIL |
|
|
|
ESC Plan does not meet requirements of BCC 8-17 or Appendix A&C of Plan Designer Manual.
Contacted Plan Designer on 9/30/02
|
Routing - PUBLIC WORKS | 9/9/2002 | | 9/25/2002 | | FAIL |
|
|
|
Requires drainage plan revision and ACHD nixed park lot drainage for four spaces in back. Per Brian M.
|
Routing - PLANNING Land Div | 9/6/2002 | | 9/9/2002 | | FAIL |
|
|
|
Need recorded deed with legal description of perimeter boundary. Called Andy Erstad on September 9, 2002.
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2002 | | DONE |
|
|
|
|
Application received | | | 9/4/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/4/2002 | | DONE |
|
|
|
|