Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02148
StatusFinaled
Name ALEXANDER M ANABELLE
Site Address 1600 S VISTA AVE
Project NameDL EVANS BANK
Customer Number 
ePlanReviewNo
Description
D. L. Evans Bank - To construct a new 5200 square foot, one story, wood framed full service bank building and canopy covered drive-thru and remote ATM and related site improvements. All construction per the approved plans and attached comment list. PC#570-02/DRH02-00047/CUP02-00030/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes9/5/20029/5/20028/10/2004 DONE
BLD-Final7/31/20038/1/20038/1/2003PPASS
DetailsTom Arcoraci
###-#### ok for perm 8/1/2003 2:04:41 PM
First Notice 8/1/20038/1/2003 DONE
Permanent Occupancy 8/1/20038/1/2003 DONE
Details
Permanent occupancy UNPAID FEE  8/1/2003 DONE
Perm. Occ. Cert. #9750 issued 8-1-03 to D.L. Evans Bank.
Code Occupancy Approval7/31/20037/31/20037/31/2003PPASS
DetailsWm. Michael Meloy
BLD-Final7/28/20037/29/20037/29/2003AFAIL
DetailsJim Storey
LARRY; Phone #: ###-#### Internet Inspection Request from: Annette Moore justify door hardware as to ubc 97 1003.3.1.1 at west doors. 7/29/2003 11:22:26 AM
FIRE-Final Inspection7/24/20037/25/20037/25/2003APASS
DetailsRick Jackson
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Conference7/15/20037/16/20037/16/2003PPART
DetailsRick Jackson
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore met with GC about door hardware for nortwest exit (openable from the inside without special knowledge); extinguishers; remote LED's for duct detectors needed 7/16/2003 3:16:44 PM
BLD-Framing/Rough-in6/25/20036/26/20036/26/2003APART
DetailsJim Storey
larry ceiling grid; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in5/22/20035/23/20035/23/2003APASS
DetailsTony Young
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
int. shear wall 5/23/2003 9:38:43 AM
BLD-Conference5/19/20035/20/20035/20/2003APART
DetailsJim Storey
blk and nail around ducts and ele boxes in sheer wall #3. 5/20/2003 9:26:15 AM
BLD-Framing/Rough-in5/16/20035/19/20035/19/2003ACANC
DetailsJim Storey
LARRY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie rolled over to am. 5/19/2003 1:35:54 PM
BLD-Framing/Rough-in5/2/20035/2/20035/2/2003PPART
DetailsJim Storey
larry diagram nailing/grout under steel colums; Phone #: ###-#### Internet Inspection Request from: Barbara Moore roof ok walls ok and grout under col,s ok for exterior cover. 5/2/2003 3:42:24 PM
BLD-Framing/Rough-in5/1/20035/1/20035/1/2003PPART
DetailsJim Storey
larry diagram & hold down construction; Phone #: ###-#### Internet Inspection Request from: Barbara Moore roor diaphram nailling ok. 5/1/2003 5:36:36 PM
BLD-Foundation3/18/20033/18/20033/18/2003PPASS
DetailsJim Storey
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs walls and canopy ft ok 3/18/2003 4:16:56 PM
BLD-Foundation3/14/20033/17/20033/17/2003APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/14/2003 at 1:02:46 PM. out side permitor ft ok 3/17/2003 9:21:33 AM
(F) Reprint permit  3/5/2003  
Issue PAID IN FULL permit  3/4/2003 DONE
Plan assigned to (JCM)9/9/2002 1/13/2003 PASS
DetailsJohn Menard
1/13/2003 15:24:02 JCM - activity updated through activity BLDA022 from case BLD02-02148.
Routing - PLANNING1/2/2003 1/13/2003 PASS
Approved per DRH02-47.
Routing - PLAN CHECK1/13/2003 1/13/2003 PASS
Plan Reviewer's activity  1/13/2003 PASS
Reviewed and approved resubmitted plan sheets. JCM
PLANS/APPL TAKEN TO FRONT DESK  1/13/2003 PASS
Inspection Record Card- Bld  1/13/2003 DONE
Print Occupancy Form  1/13/2003 DONE
Telephone call  1/13/2003 DONE
permit ready and fees due
Routing - PLAN CHECK12/24/2002 1/2/2003  
Routing - PLANNING12/20/2002 12/24/2002 PEND
CU analyst, Karen Gallagher, has approved for conditional use. Landscape design has not been revised for Design Review. Also see 12/13/02 Planning activity.
Routing - PUBLIC WORKS12/16/2002 12/20/2002 PASS
Plan resubmittals received  12/19/2002 DONE
Received two copies of resubmittal sheets L-1 with transmittal. routed to John Menard.
Routing - PLUMBING12/13/2002 12/16/2002 PASS
per plans and 2000 upc
Routing - Erosion and Sediment12/13/2002 12/13/2002 PASS
ESC approved with conditions attached to plans.
Routing - PLANNING12/6/2002 12/13/2002 FAIL
Re-routed on 12-6-02 to Planning. CUP02-30 signed off by Karen.

Marty will review for DRH. Landscape plan does not comply with DRH02-47 for Robert Street streetscape, nor for overlaying with storm drainage design. Contacted landscape architect, Phil Hull, on December 13, 2002 to discuss. Project now pending the submittal of a revised landscape plan.
Routing - PLAN CHECK12/3/2002 12/6/2002  
Plan resubmittals received  12/5/2002 DONE
Received two copies of revised sheets L-1, L-2, L-3. Routed to John M. kmm
Plan resubmittals received  12/4/2002 DONE
Received one additional copy of sheet C2.0 for ESC and five additional copies of C1.0 and C1.1. routed to John M. kmm
Routing - PUBLIC WORKS11/15/2002 11/27/2002 FAIL
Requires drainage plan.
Routing - Erosion and Sediment11/27/2002 11/27/2002 FAIL
ESC Plan does not meet requirements of BCC 8-17 or Appendix A & C of Plan Designer Manual. No narrative statement attached.
Plan resubmittals received  11/26/2002 DONE
Received two copies of revised sheets SD-1, C1.0, C2.0, L-1, L-2, A-1.0, A3.1, A-5.0, A-6.0, A-6.1, A-7.0, A-10.0 and E1.0. Two copies of Lateral Force Structural calculations. One written Erosion and Sediment Control Plan and one 8 1/2 x 11 sdetch of bike rack area. Routed to John M. kmm
Routing - PLAN CHECK10/17/2002 11/15/2002  
Plan Review Completed(1st rev)  10/17/2002 DONE
Routing - FIRE10/14/2002 10/17/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK10/8/2002 10/14/2002 FAIL
Plan resubmittals requested  10/11/2002 FAIL
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLUMBING10/7/2002 10/8/2002 FAIL
provide a site plan showing building rain water system connections to the site system per plumbing plans.
Routing - PLANNING10/4/2002 10/7/2002 FAIL
Need site plan and landscape plan that complies with conditions of approval for CUP02-30, CVA02-08, (and DRH02-47), including Forestry's approval. Called applicant 10-7-02. Karen
Routing - Erosion and Sediment9/26/2002 9/30/2002 FAIL
ESC Plan does not requirements of BCC 8-17 or Standards listed in Appendix A & C of Plan Designer Manual.

Examples: No Schedule of Construction, No Inspection Schedule

Plan Designer contacted on 9/30/02
Routing - PUBLIC WORKS9/9/2002 9/26/2002 FAIL
Requires drainage plans.
Pending Assignment by JCM9/6/2002 9/9/2002 DONE
DetailsJohn Menard
9/9/2002 08:11:56 JCM - activity updated through activity BLDA166 from case BLD02-02148.
Routing - PLANNING Land Div9/9/2002 9/9/2002 PASS
Approved as per ROS 5247. Reduction in Density Survey for Lots 1-12 and Lots 21-32.
Plans ACCEPTED BY PLAN TECH  9/6/2002 DONE
Application received  9/5/2002  
Recd Pcfee & Taken To Pln CK  9/5/2002 DONE
CHANGE ISSUED DATE  3/4/2002