Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-02158
StatusFinaled
Name COMAN COLLECTION INC
Site Address 5344 E QUARTERPATH CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 5486 sq. ft. two story single family dwelling with a 2232 sq. ft. unfinished basement, a 1411 sq. ft. attached three car garage, a 325 sq. ft. covered concrete entry porch and a 400 sq. ft. covered concrete patio at rear of structure per approved plans, all engineering/red-lining and attached requirement lists. (1st floor 3739 sq. ft.)(2nd floor 1747 sq. ft.). Note: Seperate permits will be required to finish basement. PC #524 SOLAR PROTECTED DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/6/20036/9/20036/9/2003APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/6/2003 at 3:08:24 PM. Contact: ###-####. c.c # 22924 issued 6/9/2003 9:48:19 AM
DOC - Permit Finaled6/9/20036/9/20036/9/2003APASS
DetailsDave Hannah
Finaled by inspector at 6/9/2003 9:48:23 AM
BLD-Other1/21/20031/22/20031/22/2003PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/21/2003 at 09:26:35. Contact: ###-####.
BLD-Framing/Rough-in1/7/20031/8/20031/8/2003APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/07/2003 at 18:09:42. Contact: ###-####.3 of the 5 items completed crew still working on installing insulation 1/8/2003 9:24:04 AM
BLD-Energy code compliance1/8/20031/8/20031/8/2003PPASS
DetailsDave Hannah
ok to cover 1/8/2003 2:22:38 PM
BLD-Framing/Rough-in1/3/20031/6/20031/6/2003AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/03/2003 at 09:30:54. Contact: ###-####.
BLD-Framing/Rough-in1/6/20031/6/20031/6/2003PPART
DetailsSteven Webb
C/N posted--ok to insulate. 1/6/2003 3:10:42 PM
BLD-Framing/Rough-in12/9/200212/10/200212/10/2002APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/09/2002 at 09:19:16. Contact: ###-####. shear ok to cover ext need to chech hd 22 hold downs at frame these were retro fits on south wall still need to be bolted though studs 12/10/2002 9:57:25 AM
BLD-Framing/Rough-in12/2/200212/3/200212/3/2002AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/02/2002 at 07:30:46. Contact: ###-####. shear ext walls everthing ok but for south wall of hearth room missing holddowns and floor to floor strapes 12/3/2002 9:30:10 AM
BLD-Foundation10/11/200210/14/200210/14/2002PPART
DetailsSteven Webb
###-#### 95% ready--wip 10/14/2002 4:15:15 PM
BLD-Footing10/4/200210/7/200210/7/2002APART
DetailsSteven Webb
###-#### 75% of footings inspected--hor. rebar per plans in place--setbacks ok. 10/7/2002 11:29:15 AM
BLD-Footing10/3/200210/4/200210/4/2002PNR
DetailsSteven Webb
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung Cancelled by contractor 10/4/2002 3:31:03 PM
Plan assigned to (DJO)9/19/20029/19/20029/19/2002 PASS
DetailsDan Overy
9/19/2002 07:34:18 DJO - activity updated through activity BLDA022 from case BLD02-02158.
Case Summary (BLD)  9/19/2002 PEND
Plan Review Report  9/19/2002 PEND
PLANS/APPL TAKEN TO FRONT DESK  9/19/2002 DONE
Inspection Record Card- Bld  9/19/2002 DONE
Telephone call  9/19/2002 DONE
PERMIT READY
Issue PAID IN FULL permit  9/19/2002  
Plans ACCEPTED BY PLAN CHECK  9/19/2002  
Routing - PUBLIC WORKS9/9/2002 9/10/2002 PASS
Routing - PLANNING9/6/2002 9/9/2002 PASS
Driveway not to exceed 33' wide. See red lining. AKT
Application received  9/6/2002  
Pending Assignment by DJO9/6/2002    
DetailsDan Overy
Routing - PLAN CHECK9/10/2002