BLD-Final | 4/7/2003 | 4/7/2003 | 4/7/2003 | P | PASS |
Russ Owen
|
|
|
###-####.Sink in food bar was removed. OK for a perm oc. 4/7/2003 2:11:51 PM
|
Permanent Occupancy | | 4/7/2003 | 4/7/2003 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 4/7/2003 | | DONE |
|
|
|
Perm. Occ. Cert. #9611 issued 4-7-03 to the Ultra Touch Car Wash
|
FIRE-Final Inspection | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PASS |
Rick Jackson
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Final | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PART |
Russ Owen
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore. c/n items ok except sink height .and special insp report. 4/1/2003 5:38:17 PM 4/1/2003 5:38:55 PM
|
FIRE-Final Inspection | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PART |
Rick Jackson
|
|
|
ROD; Phone #: ###-#### Internet Inspection Request from: Annette Moore temp approved per Dave Miller pending door hardware for double doors on south side 3/28/2003 1:22:29 PM
|
BLD-Final | 3/28/2003 | 3/28/2003 | 3/28/2003 | P | PART |
Russ Owen
|
|
|
ROD; Phone #: ###-#### Internet Inspection Request from: Annette Moor > Ok for a temp oc c/n posted. 3/31/2003 11:33:30 AM
|
FIRE-Final Inspection | 3/27/2003 | 3/27/2003 | 3/27/2003 | P | FAIL |
Rick Jackson
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Annette Moore exit door hardware; address; test duct detectors 3/27/2003 4:02:21 PM
|
BLD-Conference | 3/26/2003 | 3/25/2003 | 3/25/2003 | P | CANC |
Scott M.Brown
|
|
|
|
Code Occupancy Approval | 3/26/2003 | 3/25/2003 | 3/25/2003 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED CASE CLOSED. 3/26/2003 12:55:16 PM
|
BLD-Framing/Rough-in | 3/14/2003 | 3/14/2003 | 3/14/2003 | P | PART |
Russ Owen
|
|
|
ROD; Phone #: ###-#### Internet Inspection Request from: Darla DownsCeiling grid ok need to fire caulk some penetrations, left a c/n about accessible counters etc not detailed on approved plans or coments. 3/14/2003 5:26:39 PM
|
BLD-Framing/Rough-in | 2/4/2003 | 2/5/2003 | 2/5/2003 | A | PART |
Russ Owen
|
|
|
waiting for detail for 1 hr wall. at rim. 2/5/2003 11:06:26 AM other items ok. 2/5/2003 11:06:39 AM
|
BLD-Framing/Rough-in | 2/3/2003 | 2/4/2003 | 2/4/2003 | A | PART |
Russ Owen
|
|
|
###-#### front entry foyer area . 2/4/2003 11:08:58 AM
|
BLD-Framing/Rough-in | 2/4/2003 | 2/4/2003 | 2/4/2003 | A | CANC |
Russ Owen
|
|
|
unable to do called contractor. 2/4/2003 4:43:39 PM
|
BLD-Framing/Rough-in | 1/29/2003 | 1/30/2003 | 1/30/2003 | P | FAIL |
Russ Owen
|
|
|
###-#### C/n on site in office went over 4 items with contractor. also engineer approved removal of cmu interior wall to be replaced with 2x6. also need mec, ele inspections.1/30/2003 4:49:41 PM 1/30/2003 4:50:06 PM
|
BLD-Framing/Rough-in | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PART |
Russ Owen
|
|
|
###-#### rod went over plans with contractor. 12/5/2002 12:45:28 PM
|
BLD-Foundation | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PART |
Russ Owen
|
|
|
###-#### have already received special inspection ok subject to s-i. 12/4/2002 10:48:33 AM
|
BLD-Framing/Rough-in | 12/2/2002 | 12/3/2002 | 12/3/2002 | A | PART |
Tom Arcoraci
|
|
|
###-#### needs spec insp 12/3/2002 10:38:42 AM
|
BLD-Footing | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | PASS |
Tom Arcoraci
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Foundation | 11/20/2002 | 11/21/2002 | 11/21/2002 | P | PASS |
Tom Arcoraci
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 11/15/2002 | 11/18/2002 | 11/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/15/2002 at 16:04:24. Contact: ###-####.NOTE: this does not require special inspection, concrete or cmu. 11/18/2002 4:19:06 PM
|
BLD-Footing | 11/15/2002 | 11/18/2002 | 11/18/2002 | A | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/15/2002 at 16:04:24. Contact: ###-####.NOTE: this does not require special inspection, concrete or cmu. 11/18/2002 4:19:06 PM
|
Issue PAID IN FULL permit | | | 11/7/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/23/2002 | | 10/25/2002 | | PASS |
|
|
|
Approving the remodel and addition for permit. The fuel island canopy (BLD02-02258), structural portion, is not yet approved. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/25/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/25/2002 | | DONE |
|
|
|
|
Telephone call | | | 10/25/2002 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (JCM) | 9/12/2002 | | 10/25/2002 | | PASS |
John Menard
|
|
|
10/25/2002 09:27:06 JCM - activity updated through activity BLDA022 from case BLD02-02166.
|
Plan resubmittals received | | | 10/23/2002 | | DONE |
|
|
|
Received two copies of revised sheets, CS-1, SD-1, A-2, A-3, A-4, A-5, A-6, A-7, A-9, A-10, A-11 and EX-1. Structural sheets S2.1 & S7.1. Routed to John M. kmm
|
Plan resubmittals received | | | 10/23/2002 | | DONE |
|
|
|
Received three copies of revised structural sheets 1 and 2. Revised calcs. Routed to John M. kmm
|
Plan Review Completed(1st rev) | | | 10/22/2002 | | DONE |
|
|
|
|
Routing - FIRE | 10/18/2002 | | 10/22/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan resubmittals requested | | | 10/18/2002 | | FAIL |
|
|
|
Mailed and faxed the architect of record a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 10/11/2002 | | 10/18/2002 | | FAIL |
|
|
|
|
Routing - PLUMBING | 10/8/2002 | | 10/11/2002 | | PASS |
|
|
|
1. building cleanouts are required on sewer lines exiting building 2 feet outside 4 locations 2. water heater p-15 will require expansion protection 3. water heaters may require a pan with a drain effective 11/1/02.
|
Routing - PLANNING | 10/1/2002 | | 10/8/2002 | | PASS |
|
|
|
Approve as noted and per DRH02-88.
|
Routing - PUBLIC WORKS | 9/30/2002 | | 10/1/2002 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/26/2002 | | 9/27/2002 | | PASS |
|
|
|
ESC Plan approved with conditions attached to drawing.
|
Routing - PUBLIC WORKS | 9/17/2002 | | 9/20/2002 | | FAIL |
|
|
|
Requires drainage plan revisions per Brian M. kmm
|
Routing - PLANNING Land Div | 9/16/2002 | | 9/17/2002 | | PASS |
|
|
|
ROS 5877.
|
Routing Off Site - C.D.H | 9/16/2002 | | 9/16/2002 | | DONE |
|
|
|
Owner (Dave) took to CDHD for approval.
|
Pending Assignment by JCM | 9/11/2002 | | 9/12/2002 | | DONE |
John Menard
|
|
|
9/12/2002 08:00:02 JCM - activity updated through activity BLDA166 from case BLD02-02166.
|
Telephone call | | | 9/11/2002 | | DONE |
|
|
|
Left message with Roger Foster that plans need to be taken to CDHD due to the food service area in the lobby.
|
Plans ACCEPTED BY PLAN TECH | | | 9/10/2002 | | PASS |
|
|
|
1. No signature from CDHD. Left message on 09/11/02 with Roger Foster that plans need to be taken to CDHD for signature approval prior to routing.
PLANS APPROVED BY CDHD 9/16/02.
|
First Notice | 9/9/2002 | 9/9/2002 | 9/9/2002 | | DONE |
|
|
|
|
Application received | | | 9/9/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/9/2002 | | |
|
|
|
|