BLD-Aging Inspection | 11/15/2006 | 11/15/2006 | 11/17/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/14/2006 | 9/14/2006 | 9/19/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/11/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 5/8/2006 | 5/8/2006 | 5/10/2006 | | PASS |
Tony Young
|
|
|
|
FIRE-Final Inspection | 3/6/2006 | 3/6/2006 | 3/6/2006 | P | PASS |
Forrest France
|
|
|
The required corrections have been completed, life safety finaled.
|
FIRE-Final Inspection | 2/28/2006 | 2/28/2006 | 3/1/2006 | P | DEFR |
Forrest France
|
|
|
Inspection to be completed 3/1.
|
FIRE-Final Inspection | 3/1/2006 | 3/1/2006 | 3/1/2006 | A | PART |
Forrest France
|
|
|
Door closures have been adjusted, SD have been relocated in some units as required, exhaust fans have been connected to the light switch in the bathrooms, the smoke detectors in unit 422 have NOT been relocated to proper locations as required, no access to three units at this time due to tenant occupation.
|
FIRE-Final Inspection | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | FAIL |
Forrest France
|
|
|
Door closures at some locations need adjustment, smoke detectors must meet the requirements of NFPA 72 2002 11.8.3.1 and 11.8.3.5 with respect to location, fire dept. access and building addressing are acceptable.
|
BLD-Aging Inspection | 1/24/2006 | 1/24/2006 | 1/25/2006 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 11/24/2005 | 11/24/2005 | 11/25/2005 | A | CANC |
Tony Young
|
|
|
Phone #: ###-####
|
BLD-Aging Inspection | 11/24/2005 | 11/24/2005 | 11/24/2005 | | CANC |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/12/2005 | 9/12/2005 | 9/12/2005 | | PART |
Dave Hannah
|
|
|
wip
|
BLD - Request for Extension | 7/5/2005 | 7/6/2005 | 7/6/2005 | | PASS |
Tony Young
|
|
|
rob danielson ###-#### or ###-#### still working on this project please call him
|
BLD-Aging Inspection | 5/12/2005 | 5/12/2005 | 5/12/2005 | | PASS |
Tony Young
|
|
|
|
BLD - Request for Extension | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | DONE |
Troy James
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
(F) Reprint permit | | | 2/24/2005 | | DONE |
|
|
|
|
BLD-Aging Inspection | 11/3/2004 | 11/3/2004 | 11/3/2004 | | CANC |
Troy James
|
|
|
|
BLD-Aging Inspection | 9/1/2004 | 9/1/2004 | 9/1/2004 | | PART |
Troy James
|
|
|
|
BLD-Aging Inspection | 6/22/2004 | 6/22/2004 | 6/22/2004 | | DONE |
Troy James
|
|
|
wip 6/22/2004 11:54:32 AM
|
BLD-Framing/Rough-in | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | CANC |
Dave Hannah
|
|
|
warren; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Framing/Rough-in | 1/14/2004 | 1/15/2004 | 1/15/2004 | A | PART |
Tony Young
|
|
|
WARREN ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
#s 420, 421, 422, 423 ok to cover 1/15/2004 11:40:06 AM
|
BLD-Aging Inspection | 10/1/2003 | 10/1/2003 | 10/1/2003 | | PASS |
Tony Young
|
|
|
wip 10/1/2003 10:05:50 AM
|
Plan resubmittals received | | | 6/13/2003 | | DONE |
|
|
|
Received two copies of revised sheet A3.0, one copy of supplemental calcs. and one copy of cover letter. Routed to Carl D. kmm
|
BLD-Framing/Rough-in | 3/31/2003 | 4/1/2003 | 4/1/2003 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/31/2003 at 1:55:32 PM. Contact: ###-####.ok to insulate need fire blk/and mrch r/i. 4/1/2003 3:23:10 PM
|
Issue PAID IN FULL permit | | | 2/24/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/19/2003 | | DONE |
|
|
|
Received two copies of resubmittal sheets A3.0 with structural calculations and transmittal letter. Routed to Carl Dependahl.
|
Inspection Record Card- Bld | | | 10/14/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2002 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/11/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/11/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 9/13/2002 | | 10/11/2002 | | PASS |
Mike Phillips
|
|
|
10/11/2002 08:18:00 M_P - activity updated through activity BLDA022 from case BLD02-02178.
|
Routing - PLAN CHECK | 9/24/2002 | | 10/11/2002 | | PASS |
|
|
|
10/4/02 Plans put on hold until additional information is submitted to reflect the type of construction these building were required to meet along with square footages of each building.
|
Plan resubmittals received | | | 10/10/2002 | | DONE |
|
|
|
Received two copies of revised sheets A2.0 and A3.0. Routed to Mike P.
|
Routing - PLANNING | 9/23/2002 | | 9/24/2002 | | PASS |
|
|
|
Approved per building plans.
|
Routing - PUBLIC WORKS | 9/13/2002 | | 9/23/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2002 | | DONE |
|
|
|
|
Application received | | | 9/9/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/9/2002 | | DONE |
|
|
|
|
Fee Review-notes | 9/9/2002 | 9/9/2002 | | | |
|
|
|
|