Permit NumberBLD02-02194
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMIC #24D
Customer NumberPCS24549
ePlanReviewNo
Description
MICRON BLDG #24D - Fab 4B Remodel Service Aisle 2451S/ 4B Chemical Pass-Thru (Pcs #24-20024549) * To remodel the 625 square foot Service Aisle #2451S to create and isolate a new 115 square foot Chemical Pass-Thru Area #115B at the north end of the service aisle and to install walls to create a 310 square foot void (unaccessible and unusable area between the Chemical Pass-Thru and the remaining 199 square foot area of Service Aisle #2451S. All construction per the approved plans and attached comment list. The plans have been modified to open up the 310 square foot unaccessible and unusable portion of Service Aisle 2451S to make that area usable. This modification is being approved as an equivelant recognized adopted standard, the 2000 IBC, Sec. 1004.2.1. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes9/10/20029/10/20028/10/2004 DONE
BLD-Aging Inspection1/12/20041/12/20041/12/2004 PASS
DetailsJim Storey
DOC - Permit Finaled1/12/20041/12/20041/12/2004APASS
DetailsJim Storey
Finaled by inspector at 1/12/2004 8:14:53 AM
Letter of compliance  5/23/2003 DONE
Letter of Compliance #22946 issued 5-23-03.
FIRE-Sprinkler Rough-in5/22/20035/22/20035/22/2003PPASS
DetailsRick Jackson
andy; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Final5/21/20035/21/20035/21/2003PPART
DetailsJim Storey
ANDY; Phone #: ###-#### Internet Inspection Request from: Darla Downs pending fire insp. 5/21/2003 3:20:01 PM
Reopen Permit (ISS)  5/21/2003 DONE
NEED A FINAL SO OPENED PERMIT TO ISSUE MODE
(F) Reprint permit  5/20/2003  
Inspection Record Card- Bld  5/19/2003 DONE
Telephone call  5/19/2003 DONE
I E-MAILED PAUL & DARLA
Routing - FIRE5/5/2003 5/16/2003 PASS
DetailsBill Alexander
Routing - PLAN CHECK5/16/2003 5/16/2003 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/16/2003 PASS
Plan assigned to (JCM)4/25/2003 5/16/2003 PASS
DetailsJohn Menard
5/16/2003 14:26:37 JCM - activity updated through activity BLDA022 from case BLD02-02194.
Routing - PLAN CHECK4/25/2003 5/5/2003 PASS
Plan modification
Plan Reviewer's activity  5/5/2003 PASS
Reviewed and approved requested modification to open unusable area of Service Bay 2451S. This area was originally designed to be unaccessible to maintain the area below 200 square feet and the requirement for one exit. This modification was requested to recognize the use 2000 IBC, Section 1004.2.1. This IBC section allows an occupant load of 10 with a maximum travel distance of 75 feet to have one exit from an H-5 Occupancy area. This modification is approved based on the fact that the 2000 International Building Code is an adopted recognized equivalent standard. JCM
Plan routing begun/TENANTS  4/25/2003 DONE
Plan modification
Plans ACCEPTED BY PLAN TECH  4/25/2003 DONE
Plan modification
Plan resubmittals received  4/10/2003 DONE
Plan Modification
CHANGE STATUS TO (PND)  4/10/2003 DONE
Plan modification received
BLD-Aging Inspection1/30/20031/30/20031/30/2003 NR
DetailsJim Storey
no call for insp bld. ele perfomed final on 1/23. 1/30/2003 9:19:31 AM
Issue & PRINT to be Invoiced  10/15/2002  
Routing - PLAN CHECK9/30/2002 10/14/2002  
Routing - FIRE10/14/2002 10/14/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK10/14/2002 10/14/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/14/2002 PASS
Inspection Record Card- Bld  10/14/2002  
Telephone call  10/14/2002 DONE
e-mailed paul that permit is ready
Plan assigned to (JCM)9/13/2002 10/14/2002 PASS
DetailsJohn Menard
10/14/2002 14:02:40 JCM - activity updated through activity BLDA022 from case BLD02-02194.
Plan Review Completed(1st rev)  9/30/2002 DONE
Routing - FIRE9/23/2002 9/30/2002 FAIL
DetailsBill Alexander
Pending Paul Marcolina's call back on questions with extending corridor pass-through of a sevice corridor or, into a storage type room with a pass-through?

02/27/2002 - Paul Marcolina called Sam (I was out of the office), and indicated he was not sure what is going on with the proposal, only that they overlooked the required separation?
Plan Reviewer's activity  9/23/2002 PASS
Plans reviewed and approved as submitted with attached comments and redlined notes. JCM
Routing - PLAN CHECK9/20/2002 9/23/2002 PASS
Routing - PLUMBING9/18/2002 9/19/2002 PASS
properly cap drain, waste and water at demo'd emergency eyewash shower.
Routing - PUBLIC WORKS9/13/2002 9/18/2002 PASS
Plans ACCEPTED BY PLAN TECH  9/13/2002 DONE
Application received  9/10/2002  
Recd Pcfee & Taken To Pln CK  9/10/2002 DONE
will bill for fees