BLD-Aging Inspection | 10/21/2005 | 10/21/2005 | 10/24/2005 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Expired | 10/24/2005 | 10/24/2005 | 10/24/2005 | P | PASS |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/20/2005 | | DONE |
|
|
|
|
Ready Permit EXTENDED | | | 2/9/2004 | | DONE |
|
|
|
per letter from jennifer gilliland extend permit to september 1st 2004
|
Permit EXTENDED | | | 1/20/2004 | | DONE |
|
|
|
per jenifer gilliland extend permit per letter on file with records until september 1st 2004
|
BLD-Aging Inspection | 12/5/2003 | 12/5/2003 | 12/5/2003 | | PART |
Dave Hannah
|
|
|
project on hold 12/5/2003 8:11:37 AM
|
(F) Reprint permit | | | 9/5/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/4/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2003 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/18/2003 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/18/2003 | | DONE |
|
|
|
permit ready and fees due
|
Plan assigned to (JCM) | 9/12/2002 | | 8/18/2003 | | PASS |
John Menard
|
|
|
8/18/2003 08:14:08 JCM - activity updated through activity BLDA022 from case BLD02-02206.
|
Routing - PLAN CHECK | 8/12/2003 | | 8/14/2003 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/8/2003 | | 8/11/2003 | | PASS |
|
|
|
per plans, resubmitted plans dated 8/6/03 and 2000 upc.
|
Routing - PLANNING | 7/29/2003 | | 8/8/2003 | | PEND |
|
|
|
Approved per DRH02-119 for structural permit only; exterior finishes and site-landscape not a part of this permit. Pending CVA02-25 review and signature.
|
Plan resubmittals received | | | 8/6/2003 | | DONE |
|
|
|
Received one copy of response letter from Musgrove and three copies of revised sheetsP100P101, P300, P301. Routed to John Menard. kmm
|
Routing - PLAN CHECK | 2/24/2003 | | 7/29/2003 | | |
|
|
|
|
Routing - PLANNING Land Div | 7/22/2003 | | 7/22/2003 | | PASS |
|
|
|
Approved. Exempt from subdivision. Over 5 acres in size.
|
CHANGE STATUS TO (PND) | | | 3/3/2003 | | DONE |
|
|
|
|
Permit EXTENDED | | | 2/27/2003 | | DONE |
|
|
|
180 day permit application extension granted by T. Hogland by letter scanned into documents of this permit. Time extension is granted through Sept. 8, 2003.
|
Routing - FIRE | 2/20/2003 | | 2/24/2003 | | PASS |
|
|
|
|
Routing - PLUMBING | 2/13/2003 | | 2/20/2003 | | FAIL |
|
|
|
the piping underslab in the kitchen and food commissary areas is part of this permit, please provide a plan showing the piping the way it is to be installed on a plan that doesn't say "for referance only", provide a vented trap at the drain in the garbage area, the drain in the garbage area is 6",, so the piping through the grease interceptor and to the sewer connection must be 6". use upc to size hanger, provide isometeric drawings of the waste piping at the restrooms, are there any employee restrooms as indecated on table page A0-01?
|
Routing - PLAN CHECK | 10/24/2002 | | 2/13/2003 | | |
|
|
|
|
Plan resubmittals received | | | 1/24/2003 | | DONE |
|
|
|
Received three copies of revised sheets C1-0 & C1-4, P100, P101, P300, P301, P400 K-1 & K-2. One copy of response letter from Musgrove engineers to plumbing comments and one response memo from ZGA to Fire Comments. Routed to John M. kmm
|
Routing - FIRE | 10/21/2002 | | 10/23/2002 | | FAIL |
Bill Alexander
|
|
|
Fire protection control room is not located near the the outside of this structure. No consederation provided for outside fire sprinkler supply control or outside access into a 1 hour fire rated sprinkler control room. Underground supply (fire line) is not clearly defined (meeting minimum code). 6" supply is shown traveling 60'-0" under this structure which will not meet NFPA requirements without special installation and construction considerations, not addressed or clarrified.
No hydrant location/s shown (must be in place prior to construction).
|
Plan Review Completed(1st rev) | | | 10/23/2002 | | DONE |
Bill Alexander
|
|
|
|
Plan Reviewer's activity | | | 10/21/2002 | | PASS |
|
|
|
Structure, as described on the permit, only. No review of any nonstructural code items done. JCM
|
Routing - PLAN CHECK | 10/14/2002 | | 10/21/2002 | | PASS |
|
|
|
|
Routing - PLUMBING | 10/9/2002 | | 10/14/2002 | | FAIL |
|
|
|
1. sht p100-need detail of water and waste to floor boxed (22) i exhibit hall a&b 2. need sheet p300 that indicates pipe sizes 3. need kitchen drawing w/fixtures 4. need fixture schedule
|
Routing - PLANNING | 10/1/2002 | | 10/9/2002 | | FAIL |
|
|
|
Design Review conditions not met.
|
Routing Off Site - STRUCTURAL | 9/16/2002 | | 10/4/2002 | | PASS |
|
|
|
called pdq to take to outside engineering. dkl Received a letter from the consulting structural engineer indicating that the structural plan review was approved and that no further review was required. JCM
|
Routing - Erosion and Sediment | 9/24/2002 | | 10/1/2002 | | PASS |
|
|
|
ESC Plan approved. See permit bld02-01745.
|
Routing - PUBLIC WORKS | 9/18/2002 | | 9/24/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/17/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 9/17/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/17/2002 | | 9/17/2002 | | FAIL |
|
|
|
Need proof of legal land division. Called Chad Jones of B & A Engineering on September 17, 2002 and left message.
|
Application received | | | 9/11/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 9/11/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/11/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/11/2002 | | |
|
|
|
|
Fee Review-notes | 9/11/2002 | 9/11/2002 | | | |
|
|
|
|