Description
(SCHUMACHER & CO - EXECUTIVE CENTER - SUITE #110) Remodel to an existing retail/office/warehouse tenant space in existing building. Remodel will expand the retail showroom by 287 sq. ft. (reducing warehouse area) and a new 343 sq. ft. storage mezzanine will be constructed in the warehouse. New tenant space total will be 4,374 sq. ft. Work to include some minor interior demolition work, new steel framed storage mezzanine, some new interior walls, one new interior door, interior finish, guardrail at mezzanine, fire sprinkler work, mechanical work, and electrical work. A new Certificate of Occupancy with the new occupant load total is to be issued when completed and approved. This building was originally constructed in Ada County and later annexed into Boise City. NOTE: This building is fully fire sprinklered for area increase. (PC#0603-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/24/2008 DONE
Second Notice BLD7/7/20067/7/20067/7/2006 DONE
First Notice has not been responded to.
First Notice5/30/20065/30/20067/7/2006 DONE
DetailsMike Jordan
BLD-Aging Inspection5/29/20065/29/20065/30/2006 DONE
DetailsMike Jordan
DOC - Permit Finaled5/30/20065/30/20065/30/2006PPASS
DetailsMike Jordan
job has been finaled.
BLD-Aging Inspection3/28/20063/28/20063/28/2006 CANC
DetailsMike Jordan
DOC - Permit Finaled3/28/20063/28/20063/28/2006ADONE
DetailsMike Jordan
BLD-Final6/20/20036/20/20036/20/2003PPASS
DetailsTom Arcoraci
tag; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final6/17/20036/18/20036/18/2003AFAIL
DetailsRuss Owen
tag; Phone #: ###-#### Internet Inspection Request from: Annette Moore. the hand rail needs to be groved for gripe and extended also 1-1/2 in away from wall went over this with owner. 6/18/2003 1:45:13 PM
BLD-Final6/4/20036/5/20036/5/2003AFAIL
DetailsRuss Owen
tag; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Needs guard rail work and hand rail in 2nd level mez. Owner on site notified no c/n posted. 6/5/2003 1:42:07 PM 6/5/2003 1:42:19 PM
FIRE-Final Inspection6/4/20036/4/20036/4/2003PPASS
DetailsTroy Cobbley
fire life safety, fire alarm and fire sprinkler finaled
BLD-Final2/26/20032/27/20032/27/2003ANR
DetailsRuss Owen
tag ###-####. This would need fire/life safety prior to a final. 2/27/2003 10:40:26 AM
BLD-Framing/Rough-in1/17/20031/21/20031/21/2003ACANC
DetailsRuss Owen
tag; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie .allready done. 1/21/2003 10:03:35 AM
BLD-Framing/Rough-in1/17/20031/17/20031/17/2003PPASS
DetailsRuss Owen
ok to cover as per engineers fixes. 1/17/2003 3:01:50 PM
BLD-Framing/Rough-in1/14/20031/14/20031/14/2003PFAIL
DetailsRuss Owen
tag; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieposted c/n and talked with engineer. 1/14/2003 5:14:49 PM
BLD-Final12/11/200212/12/200212/12/2002PCANC
DetailsRuss Owen
this is a mistake 12/12/2002 11:42:59 AM
BLD-Final12/11/200212/12/200212/12/2002PCANC
DetailsRuss Owen
this is a mistake 12/12/2002 11:42:59 AM
BLD-Framing/Rough-in12/11/200212/12/200212/12/2002ACANC
DetailsRuss Owen
called in twice. 12/12/2002 10:25:54 AM
BLD-Framing/Rough-in12/11/200212/12/200212/12/2002AFAIL
DetailsRuss Owen
c/n postedsupports for mezzanine not per engineering. 12/12/2002 10:26:25 AM
BLD-Framing/Rough-in12/11/200212/11/200212/11/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/11/2002 at 08:31:36. Contact: ###-####.unable to do to m any others. 12/11/2002 6:39:47 PM
FIRE-Final Inspection12/10/200212/10/200212/10/2002AFAIL
DetailsTroy Cobbley
The existing fire alarm system does not meet current code requirements. An updated system will be required. Fire alarm plans approved by boise city will be required. No installation work to proceed until plans are approved. No Certificate of Occupancy to be issued until work is completed or a program upgrade agreement has been reach with the boise fire dept.. Contact Dave Miller ###-####
Issue PAID IN FULL permit  11/7/2002 DONE
(F) Reprint permit  11/7/2002 DONE
Plan Review Completed(1st rev)  11/5/2002 DONE
Routing - PLAN CHECK11/5/2002 11/5/2002 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  11/5/2002 PASS
Inspection Record Card- Bld  11/5/2002 DONE
Print Occupancy Form  11/5/2002 DONE
Telephone call  11/5/2002 DONE
PERMIT READY AND FEES DUE
Plan assigned to (JCB)9/23/2002 11/5/2002 PASS
DetailsJason Blais
11/5/2002 14:52:01 JCB - activity updated through activity BLDA022 from case BLD02-02218.
Routing - FIRE10/31/2002 11/5/2002 PASS
DetailsBill Alexander
Routing - PLAN CHECK9/26/2002 10/31/2002 PEND
Plan review report sent and faxed to architect. No response required. When approved by Fire Dept. permit can be issued. Plans routed to Fire Dept.
Plan resubmittals received  10/23/2002 DONE
Received two sets of resubmittal sheets A-1, A-2, A-3, A-4, and (2) Structural calcs. Routed to Jason Blais.
Routing - PLAN CHECK9/25/2002 9/26/2002 FAIL
Did a quick overview of plans and substantial information is missing. Faxed a handwritten list of deficient or missing items to address and resubmit. Structural engineering calculations and design is also required. A full plan review will be conducted when resubmittal plans and engineering are provided.
Routing - PUBLIC WORKS9/23/2002 9/25/2002 PASS
Plans ACCEPTED BY PLAN TECH  9/13/2002 DONE
1. Plans not fully dimensioned.
2. No building code data on front of plans.
3. Architect to drop off plans for original tenant approved by Ada County for our records. Per Marlene.
Application received  9/12/2002  
Recd Pcfee & Taken To Pln CK  9/12/2002 DONE
Fee Review-notes9/12/20029/12/2002