BLD-Final | 5/14/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Steven Webb
|
|
|
Garage code 2580 Enter; Phone #: ###-#### Internet Inspection Request from: josh strasser C. of C. #22413 issued. 5/15/2003 9:13:15 AM
|
DOC - Permit Finaled | 5/15/2003 | 5/15/2003 | 5/15/2003 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 5/15/2003 9:13:21 AM
|
BLD-Final | 5/12/2003 | 5/12/2003 | 5/12/2003 | P | NR |
Dave Hannah
|
|
|
Garage code 2580; Phone #: ###-#### Internet Inspection Request from: josh strasser 5/12/2003 2:21:17 PM
|
BLD-Final | 5/5/2003 | 5/6/2003 | 5/6/2003 | A | FAIL |
Dave Hannah
|
|
|
Garage code is 2580 enter; Phone #: ###-#### Internet Inspection Request from: josh strasser needs landing at side door uot of garage 5/6/2003 11:18:35 AM
|
BLD-Final | 4/28/2003 | 4/29/2003 | 4/29/2003 | P | NR |
Dave Hannah
|
|
|
Garage code is 2580; Phone #: ###-#### Internet Inspection Request from: josh strasser needs plumbing final 4/29/2003 4:53:35 PM
|
BLD-Wall cover | 2/6/2003 | 2/7/2003 | 2/7/2003 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/6/2003 at 3:21:11 PM. Contact: ###-####. sheetrock int shear 2/7/2003 10:26:46 AM
|
BLD-Framing/Rough-in | 1/31/2003 | 1/31/2003 | 1/31/2003 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 01/31/2003 at 11:21:52. Contact: ###-####. Corrections made--ok to cover. 1/31/2003 3:19:44 PM
|
BLD-Energy code compliance | 1/24/2003 | 1/24/2003 | 1/24/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/24/2003 at 10:32:20. Contact: ###-####. insulation is ok but c/n items on framing not complete do not cover 1/24/2003 1:33:38 PM
|
BLD-Energy code compliance | 1/22/2003 | 1/23/2003 | 1/23/2003 | A | FAIL |
Alan Hauser
|
|
|
talked to super, insulator needs to go over house and insulate spots missed, 1st floor above barrel ceiling on east at perimeter, and check all windows, one window on 2nd flr. can see through crack to outdoors. 1/23/2003 11:36:33 PM
|
BLD-Framing/Rough-in | 1/20/2003 | 1/21/2003 | 1/21/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/20/2003 at 15:08:27. Contact: ###-####. c/n on site ok to insulate 1/21/2003 9:42:52 AM
|
BLD-Wall cover | 12/26/2002 | 12/27/2002 | 12/27/2002 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: alan gossi shear ok to cover ext but need to check for two retro fit hold downs one each side of front entry at frame 12/27/2002 11:08:25 AM
|
CHANGE STATUS TO (PND) | | | 12/3/2002 | | PEND |
|
|
|
Builder brought in new plans because of second floor and entry change.
|
Print Pending Permit.LaserJet4 | | | 12/3/2002 | | |
|
|
|
|
Plan Review Report | | | 12/3/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2002 | | DONE |
|
|
|
|
Telephone call | | | 12/3/2002 | | DONE |
|
|
|
CALLED 12-2-03
|
BLD-Foundation | 11/18/2002 | 11/18/2002 | 11/18/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/18/2002 at 08:18:03. Contact: ###-####.
|
BLD-Footing | 11/15/2002 | 11/15/2002 | 11/15/2002 | P | PART |
Dave Hannah
|
|
|
ready at 4 ###-#### builder needs to resubmit plans for new engineering has changed bearing walls and hold down locations told crew they could pour but at thier own risk 11/15/2002 2:10:11 PM
|
Issue PAID IN FULL permit | | | 11/12/2002 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 11/12/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 9/26/2002 | | 9/27/2002 | | PASS |
Steve Munroe
|
|
|
9/27/2002 14:40:44 SAM - activity updated through activity BLDA022 from case BLD02-02246.
|
Routing - PLAN CHECK | 9/26/2002 | | 9/27/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 9/27/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 9/16/2002 | | 9/26/2002 | | DONE |
Dan Overy
|
|
|
9/26/2002 08:37:16 SAM - activity updated through activity BLDA183 from case BLD02-02246.
|
Routing - PLAN CHECK | 9/18/2002 | | 9/26/2002 | | PEND |
|
|
|
Routed back to Angie Thomas with Planning and Zoning since foot print on site plan does not match foundation plan.
|
Routing - PUBLIC WORKS | 9/17/2002 | | 9/18/2002 | | DONE |
|
|
|
|
Routing - PLANNING | 9/17/2002 | | 9/17/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 9/17/2002 | | 9/17/2002 | | PASS |
|
|
|
warrenty deed faxed.
|
Application received | | | 9/16/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 9/16/2002 | | 9/16/2002 | | FAIL |
|
|
|
Need recorded warranty deed to match Parcel "A" on ROS 5426.
|
Routing - PLANNING | 9/16/2002 | | 9/16/2002 | | FAIL |
|
|
|
Called Mike Smith 9/16 to inform of Dave's request.
|