Case Summary (BLD) | | | 2/28/2008 | | DONE |
|
|
|
|
Fee Review-notes | 9/16/2002 | 9/16/2002 | 8/10/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/1/2003 | | DONE |
|
|
|
|
Letter of compliance | | | 11/17/2003 | | DONE |
|
|
|
Letter of Compliance # 24360 issued 11-17-03.
|
(F) Reprint permit | | | 11/17/2003 | | DONE |
|
|
|
|
BLD-Final | 11/7/2003 | 11/7/2003 | 11/7/2003 | P | PASS |
Tom Arcoraci
|
|
|
JASON; Phone #: ###-#### Internet Inspection Request from: Annette Moore ok for perm 11/7/2003 2:23:59 PM
|
BLD-Final | 10/29/2003 | 10/29/2003 | 10/29/2003 | P | FAIL |
Russ Owen
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need 1 hr assemblies for penetrations of 1 hr wall at generator room c/n. ok for a temp oc, all equired signatures are on card.r 10/29/2003 12:09:07 AM 10/29/2003 12:09:37 AM
|
Code Occupancy Approval | | | 10/29/2003 | | PASS |
|
|
|
OK FINAL SIGNED OFF.
|
BLD-Final | 10/27/2003 | 10/28/2003 | 10/28/2003 | P | NR |
Jim Sly
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Tried to call Matt......must be wrong # ? 10/28/2003 4:24:19 PM
|
BLD-Final | 10/24/2003 | 10/27/2003 | 10/27/2003 | A | CANC |
Jim Sly
|
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need all req signatures ie. Public W and zoning...... 10/27/2003 12:28:38 PM
|
FIRE-Final Inspection | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | PASS |
Troy Cobbley
|
|
|
fire life safety finaled 10/24/2003 10:04:47 AM
|
BLD-Final | 10/23/2003 | 10/24/2003 | 10/24/2003 | A | FAIL |
Jim Sly
|
|
|
Jason; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Need all req signatures. 10/24/2003 1:46:40 PM
|
BLD-Wall cover | 10/7/2003 | 10/8/2003 | 10/8/2003 | A | FAIL |
Jim Sly
|
|
|
###-#### maTT west side of 126 Called Matt.......Not aware of any wall cover insp req at this time....should have been Electrical ?...... 10/8/2003 11:20:28 AM
|
BLD-Final | 9/3/2003 | 9/4/2003 | 9/4/2003 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/3/2003 at 9:06:14 AM. Contact: ###-####. Betw 5mi MG on franklin N Bethel. 9/4/2003 8:44:57 AM
|
FIRE-Final Inspection | 9/3/2003 | 9/4/2003 | 9/4/2003 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguishers in the generator rooms per review note #11, finish painting of the curbing for fire dept access per review note #7 and conversation, repair emergency light in room 002 and raise the existing fire hydrant so the barrel is a min. 18" above finish grade per United Water requirements 9/4/2003 11:43:48 AM
|
CHANGE STATUS TO (ISS) | | | 8/26/2003 | | DONE |
|
|
|
permit still open per dan stuart-ele, fire mech still active/mls
|
Expired/Cancelled | | | 8/18/2003 | | DONE |
|
|
|
|
BLD-Foundation | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PART |
Russ Owen
|
|
|
###-####wall in ele room 12/4/2002 5:52:04 PM
|
BLD-Footing | 11/4/2002 | 11/6/2002 | 11/6/2002 | P | PART |
Russ Owen
|
|
|
rebar; Phone #: ###-#### Internet Inspection Request from: Rita DeYoungok subject to s-i. 11/6/2002 5:07:04 PM
|
Issue PAID IN FULL permit | | | 10/31/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2002 | | |
|
|
|
|
Print Occupancy Form | | | 10/31/2002 | | |
|
|
|
|
Plan assigned to (DRS) | 9/19/2002 | | 10/25/2002 | | PASS |
Dan Stuart
|
|
|
10/25/2002 15:27:46 DRS - activity updated through activity BLDA022 from case BLD02-02264.
|
Routing - FIRE | 10/23/2002 | | 10/25/2002 | | PASS |
Bill Alexander
|
|
|
|
Plan Review Completed(1st rev) | | | 10/25/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/25/2002 | | 10/25/2002 | | PASS |
|
|
|
Approved as per notes & attached plan review comment from all reviewing agencies. To permit desk for issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2002 | | PASS |
|
|
|
To permit desk for issue.
|
Telephone call | | | 10/25/2002 | | DONE |
|
|
|
CALLED LEFT MESSAGE FOR JOHN 10-25-02///DLD
|
Routing - PLAN CHECK | 10/11/2002 | | 10/23/2002 | | PEND |
|
|
|
Approved as noted and per attached plan review comments & conditions all part of the approved plans requiring verification and compliance. Routing plans to fire code analyst for review.
|
Plan Reviewer's activity | | | 10/22/2002 | | |
|
|
|
Researched past plans and history of this facility since becoming part of the HP properties. The "H-3" occupancy; the 1-hour occupancy separation between the "H-3" & "B-2" and the 2-hour area separation wall, all created under BLD97-1257, were not noted on the plans but were reflected as being required in file notes. After research, the location and requirements were noted on the plans and where reviewed by phone with the architect of record, Steve Simmons.
|
Routing - PLUMBING | 10/8/2002 | | 10/11/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 10/1/2002 | | 10/8/2002 | | PASS |
|
|
|
Approve per DRH02-150.
|
Routing - Erosion and Sediment | 9/26/2002 | | 10/1/2002 | | PASS |
|
|
|
ESC Plan approved with conditions attached to plans.
|
Plan resubmittals received | | | 9/26/2002 | | DONE |
|
|
|
Received two copies of esc plans and narative. Put with plans
|
Routing - PUBLIC WORKS | 9/20/2002 | | 9/25/2002 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 9/19/2002 | | 9/20/2002 | | PASS |
|
|
|
Lot 4, Franklin Business Park Subdivision
|
Plans ACCEPTED BY PLAN TECH | | | 9/18/2002 | | DONE |
|
|
|
1. Need owner's signature on Architect/Engineer of Record Declaration Form.
2. Need involved parties form. called Steve simmons and left message regarding these requirements.
3. Also need ESC permit application. Faxed forms to Steve Simmons.
|
Application received | | | 9/16/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/16/2002 | | DONE |
|
|
|
|