(F) Reprint permit | | | 4/23/2004 | | DONE |
|
|
|
|
BLD-Final | 2/11/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Steven Webb
|
|
|
gary ; Phone #: ###-#### Internet Inspection Request from: Annette MooreC. of O. issued..Verified bond has been received by Cathy W. for driveway. 2/12/2004 9:29:36 AM
|
DOC - Permit Finaled | 2/12/2004 | 2/12/2004 | 2/12/2004 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 2/12/2004 9:29:41 AM
|
BLD-Final | 1/21/2004 | 1/21/2004 | 1/21/2004 | P | FAIL |
Troy James
|
|
|
gary -; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need grading inspection bond completed, ladder at window well and insulation certificate. 1/21/2004 3:36:34 PM
|
BLD-Grading Inspection | 1/21/2004 | 1/21/2004 | 1/21/2004 | | BND |
Rita DeYoung
|
|
|
Grading and drainage is complete and approved. Driveway is not done. Engineer has recommended a $7500.00 bond for completeion of DW. Upon receipt of the bond the final grading is conditionally approved.
|
BLD-Final | 1/15/2004 | 1/16/2004 | 1/16/2004 | P | FAIL |
Dave Hannah
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Annette Moore needs terry recordes sign off fire sprincklers fire place ect 1/16/2004 2:06:59 PM
|
BLD-Energy code compliance | 9/2/2003 | 9/3/2003 | 9/3/2003 | A | PASS |
Jim Sly
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Annette Moore Frame corr completed. 9/3/2003 10:30:57 AM
|
BLD-Framing/Rough-in | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | FAIL |
Dave Hannah
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Annette Moore c/n on site ok to insulate 8/22/2003 1:22:49 PM
|
BLD-Energy code compliance | 8/21/2003 | 8/22/2003 | 8/22/2003 | A | PART |
Dave Hannah
|
|
|
gary; Phone #: ###-#### Internet Inspection Request from: Annette Moore foam seal ok to insulate 8/22/2003 1:23:21 PM
|
BLD-Framing/Rough-in | 8/22/2003 | 8/22/2003 | 8/22/2003 | P | DONE |
Dave Hannah
|
|
|
|
FIRE-Sprinkler Rough-in | 8/21/2003 | 8/21/2003 | 8/21/2003 | P | PASS |
Rick Jackson
|
|
|
okay to cover; tenting complete
|
BLD-Framing/Rough-in | 7/29/2003 | 7/29/2003 | 7/29/2003 | P | PART |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Annette Moore shear ok to cover ext 7/29/2003 4:49:01 PM
|
BLD-Foundation | 1/7/2003 | 1/7/2003 | 1/7/2003 | P | PASS |
Dave Hannah
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 12/26/2002 | 12/27/2002 | 12/27/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/26/2002 at 09:21:50. Contact: ###-####.
|
BLD-Foundation | 12/11/2002 | 12/12/2002 | 12/12/2002 | P | PART |
Dave Hannah
|
|
|
basement walls ok to pour 12/12/2002 2:13:39 PM
|
BLD-Footing | 12/6/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Dave Hannah
|
|
|
gary - ###-#### basement ftg ok to pour 12/9/2002 2:58:29 PM
|
BLD-Grading Inspection | 12/6/2002 | 12/6/2002 | 12/6/2002 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engioneer.
|
BLD-Footing | 12/5/2002 | 12/6/2002 | 12/6/2002 | P | CANC |
Dave Hannah
|
|
|
###-####--not ready yet
|
BLD-Other | 11/20/2002 | 11/21/2002 | 11/21/2002 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/20/2002 at 13:16:27. Contact: ###-####.need pool permit 1st 11/21/2002 3:40:24 PM
|
Issue PAID IN FULL permit | | | 10/16/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/15/2002 | | |
|
|
|
|
Print Occupancy Form | | | 10/15/2002 | | |
|
|
|
|
Telephone call | | | 10/15/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 10/14/2002 | 10/14/2002 | 10/14/2002 | | PASS |
Dan Overy
|
|
|
10/14/2002 14:39:46 DJO - activity updated through activity BLDA022 from case BLD02-02279.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/14/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 10/14/2002 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/14/2002 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/1/2002 | | 10/1/2002 | | PASS |
|
|
|
ESC Plan approved with conditions attached to drawings.
|
Routing - PLANNING | 10/1/2002 | | 10/1/2002 | | PASS |
|
|
|
|
Routing - FIRE | 9/27/2002 | | 9/30/2002 | | DONE |
|
|
|
Fire sprinklers are required for this lot (BLock 2, Lot 2, Mariposa Subdivision)
|
Additional plans submitted | | | 9/30/2002 | | DONE |
|
|
|
Received fax of additional information for fire and planning/zoning. Routed to Dan Overy.
|
Additional plans submitted | | | 9/30/2002 | | DONE |
|
|
|
Received three ERO sheet with (1) narrative. Attached to plans.
|
Routing - Erosion and Sediment | 9/26/2002 | | 9/27/2002 | | FAIL |
|
|
|
No ESC Plan submitted.
|
Routing - PLANNING | 9/24/2002 | | 9/26/2002 | | PEND |
|
|
|
I will approve this if the fire dept. approves the driveway per the plat note. Everything else is ok.
|
Routing - PUBLIC WORKS | 9/24/2002 | | 9/24/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/18/2002 | | 9/24/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3
|
Application received | | | 9/18/2002 | | |
|
|
|
|
Pending Assignment by DJO | 9/18/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 10/1/2002 | | | | |
|
|
|
|