Permit NumberBLD02-02293
StatusFinaled
Name J A HOLMES CORPORATION
Site Address 4900 N ARROW CREST WAY
Project NameHillside
Customer Number 
ePlanReviewNo
Description
To construct a 4448 sq. ft. two story single family dwelling with a 1344 sq. ft. attached three car garage, a 390 sq. ft. covered portico, 944 sq. ft. of covered patio areas and a free-form concrete patio per approved plans, all engineering/red-lining and attached requirement lists. This lot is within a hillside area and is subject to the hillside ordinances. Class "A" roof system and 30 ft. defensible area will be maintained. (1st floor 2924 sq. ft.)(2nd floor 1524 sq. ft.) PC #565 CU #44-94 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/4/20036/5/20036/5/2003APASS
DetailsDave Hannah
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore c.c # 22922 issued 6/5/2003 11:44:58 AM
BLD-Grading Inspection6/5/20036/5/20036/5/2003 PASS
DetailsRita DeYoung
Final grading and dainage is complete and approved.
DOC - Permit Finaled6/5/20036/5/20036/5/2003PPASS
DetailsDave Hannah
Finaled by inspector at 6/5/2003 11:45:00 AM
BLD-Energy code compliance1/17/20031/21/20031/21/2003APASS
DetailsTony Young
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/17/20031/21/20031/21/2003APASS
DetailsTony Young
matt--re-insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in1/15/20031/16/20031/16/2003AFAIL
DetailsRuss Owen
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie2 c/ns posted. 1/16/2003 12:09:27 PM
BLD-Conference1/8/20031/9/20031/9/2003APART
DetailsTony Young
per tony at 10 for conf with other individuals matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
conf. on winder stairs, need to redo 1st winder 1/9/2003 10:23:56 AM
BLD-Framing/Rough-in12/30/200212/31/200212/31/2002APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ext. shear ok 12/31/2002 10:02:55 AM
BLD-Framing/Rough-in12/20/200212/23/200212/23/2002ANR
DetailsTony Young
SHEAR; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD-Framing/Rough-in12/23/200212/23/200212/23/2002PFAIL
DetailsSteven Webb
shear C/N posted--complete and correct and recall. 12/23/2002 3:00:38 PM
BLD-Foundation10/30/200210/30/200210/30/2002PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
remainder of wall and piers 10/30/2002 3:48:40 PM
BLD-Foundation10/29/200210/29/200210/29/2002PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/29/2002 at 07:13:20. Contact: ###-####.
BLD-Footing10/25/200210/28/200210/28/2002APART
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Amy Lawson rebar in setbacks ok crew will be pouring this footing in sections 10/28/2002 11:14:30 AM
BLD-Grading Inspection10/24/200210/24/200210/24/2002 PASS
DetailsRita DeYoung
Footing subgrade has been approved by the geotechnical engineer.
Plan assigned to (DJO)10/10/200210/10/200210/22/2002 PASS
DetailsDan Overy
10/22/2002 09:27:51 DJO - activity updated through activity BLDA022 from case BLD02-02293.
Plan Reviewer's activity  10/22/2002 DONE
revised foundation plan and calculations received 10/21/02. ok to issue when information is reviewed.
PLANS/APPL TAKEN TO FRONT DESK  10/22/2002 DONE
Case Summary (BLD)  10/22/2002 DONE
Plan Review Report  10/22/2002 DONE
Inspection Record Card- Bld  10/22/2002 DONE
Print Occupancy Form  10/22/2002 DONE
Telephone call  10/22/2002 DONE
permit ready and fees due
Issue PAID IN FULL permit  10/22/2002 DONE
Plan Reviewer's activity  10/10/2002 PEND
will issue permit when engineered foundation, interior/exterior footings design and calculations are received. beam calculations and lengths will be faxed from gowanwood.
Plans ACCEPTED BY PLAN CHECK  10/10/2002  
Routing - Erosion and Sediment9/24/2002 9/30/2002 PASS
ESC Plan approved with conditions attached to drawings.
Routing - FIRE9/30/2002 9/30/2002 DONE
No fire sprinklers required (Arrowhead Canyon)
Routing - PLANNING9/23/2002 9/24/2002 PASS
Routing - PUBLIC WORKS9/23/2002 9/23/2002 DONE
Routing - PUBLIC WORKS GRADING9/19/2002 9/23/2002 PASS
DetailsRita DeYoung
Approved as a Category 3 with conditions of approval in letter from Boise Public Works attached to the plan.
Application received  9/19/2002  
Pending Assignment by DJO9/19/2002    
DetailsDan Overy
Routing - PLAN CHECK9/30/2002