Permit Information
Permit NumberBLD02-02321
StatusExpired
Name PANDA EXPRESS
Site Address 1124 N MILWAUKEE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(PANDA EXPRESS) To construct a new 1,810 sq.ft. (B) occupancy restaurant tenant space in existing shell building done under BLD02-01851 per approved plans on file. Work to include structural roof modifications to support additional rooftop equipment, two new accessible restrooms, new interior walls and doors, interior finish, new suspended ceiling, new soffit work, new walk-in cooler and freezer installations, (2) new Type I hood installations with one-hour rated duct enclosures, new mechanical work including all new rooftop equipment, new plumbing work, and new electrical work. One-hour rated tenant demising wall is existing from the shell building permit. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is NOT fire sprinklered. (PC#0626-02) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 12/20/200312/20/2003 DONE
Details
Fee Review-notes8/13/20038/13/20038/13/2003 DONE
First Notice 8/1/20038/1/2003 DONE
Permanent occupancy  8/1/2003 DONE
Perm. Occ. Cert. #9754 issued 8-1-03 to the Panda Express.
Temporary occupancy  3/14/2003 DONE
Temp. Occ. Cert. #4934 issued to Panda Express on 3-14-03
Code Occupancy Approval  1/10/2003 PASS
ALL LAND SCAPE IN OK FOR FINAL AND RELEASE OF BOND.
BLD-Final12/19/200212/20/200212/20/2002PPART
DetailsRuss Owen
###-####. ok for a temp oc , pending all required signatures for a permanent. 12/20/2002 12:58:07 PM
FIRE-Final Inspection12/19/200212/20/200212/20/2002APASS
DetailsTroy Cobbley
life safety finaled 12/20/2002 10:57:20 AM
DOC - Permit Expired12/20/200212/20/200212/20/2002PPASS
DetailsRuss Owen
Expired by inspector at 12/20/2002 12:31:49 PM
FIRE-Final Inspection12/18/200212/19/200212/19/2002PFAIL
DetailsTroy Cobbley
hood system tested ok. the only thing missing is the actual permit and the specifications. Also needs life safety inspection 12/19/2002 1:17:15 PM
BLD-Framing/Rough-in12/18/200212/18/200212/18/2002PPASS
DetailsRuss Owen
CEILING GRID; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok for tile. 12/18/2002 1:27:49 PM
BLD-Framing/Rough-in12/17/200212/17/200212/17/2002PFAIL
DetailsRuss Owen
CEILING GRID- GORDON ; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliec/n posted 12/17/2002 5:04:39 PM
BLD-Other12/16/200212/16/200212/16/2002PFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/16/2002 at 10:24:40. Contact: ###-####.c/n for perim wires. 12/16/2002 2:35:03 PM
FIRE-Conference12/12/200212/13/200212/13/2002ADONE
DetailsTroy Cobbley
I spoke with the contractor and the electrical contractor about the placement for the duct smoke detectors and electrical shutoff under the type 1 hood 12/13/2002 9:40:40 AM
BLD-Framing/Rough-in11/21/200211/22/200211/22/2002PPASS
DetailsRuss Owen
gordon ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in11/20/200211/21/200211/21/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/20/2002 at 14:44:44. Contact: ###-####. need trades ok'd, resubmit for duct wrap; ok to pre rock behind elec panels, etc 11/21/02 11:15:32 AM
Issue PAID IN FULL permit  11/6/2002 DONE
Routing - PLAN CHECK10/21/2002 10/23/2002 PASS
Permit and plans approved and taken to front desk.
Plan assigned to (JCB)9/24/2002 10/23/2002 PASS
DetailsJason Blais
10/23/2002 13:05:53 JCB - activity updated through activity BLDA022 from case BLD02-02321.
Plan resubmittals received  10/23/2002 DONE
Received two copies of Stapley Engineering's supporting structural calculations. Routed to Jason B. kmm
PLANS/APPL TAKEN TO FRONT DESK  10/23/2002 PASS
Print Pending Permit.LaserJet4  10/23/2002  
Inspection Record Card- Bld  10/23/2002 DONE
Print Occupancy Form  10/23/2002 DONE
Telephone call  10/23/2002 DONE
PERMIT READY AND FEES DUE
Routing - PLAN CHECK10/9/2002 10/21/2002 FAIL
One item, new rooftop equipment-structural verification, required to still be submitted.
Telephone call  10/18/2002 DONE
Called architect's representative, Ramulus, and let him know that one item was not adequately addressed. Need structural verification for roof loads for new rooftop equipment.
Plan resubmittals received  10/17/2002 DONE
Received two sets of resubmittal sheets T1.0, T2.0, T2.1, A1.0, A1.1, A1.2, A2.0, A2.1, A2.2., A2.3, A3.0, A3.1, A4.0, K1.0, F1.0, E-1.0, E-2.0, E-3.0, E-4.0, M-1.0, M-2.0, M-3.0, K-1, K-2, P-1.0, P-2.0, P-3.0, P-4.0, (1) Product Data on AutoFroth 9589, (1) Extruded Square Aluminum Tube, (1) MSDS on Acrylite, ICBO ER-3715 report, and cover letter. Routed to Jason Blais.
Routing - FIRE10/4/2002 10/8/2002 PASS
Plan Review Completed(1st rev)  10/8/2002 FAIL
Routing - PLAN CHECK10/1/2002 10/4/2002 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and written response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  10/4/2002  
Plan resubmittals and written response required for further review.
Routing - PLUMBING9/30/2002 10/1/2002 PASS
1. pot sink 40A shall discharge to the grease interceptor. 2. ice machine and soda machine may require additional backflow protection. 3. all water heaters may require a pan w/ drain effective nov. 1, 2002.
Routing - PLANNING9/25/2002 9/30/2002 PASS
Pass per CUP01-00142 and CUP02-00078, Mark Pecchenino
Routing - PLANNING9/30/2002 9/30/2002 PASS
Approved per DRH02-00097.
Routing - PUBLIC WORKS9/24/2002 9/25/2002 PASS
Plans ACCEPTED BY PLAN TECH  9/23/2002  
Application received  9/20/2002  
Recd Pcfee & Taken To Pln CK  9/20/2002  
Fee Review-notes9/20/20029/20/2002