Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD02-02339
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 6259 W EMERALD
Project NameDigestive Health Clinic
Customer Number 
ePlanReviewNo
Description
Digestive Health Clinic - To construct a 13,779 sq. ft. single story Type IIN fully fire sprinklered medical clinic with a 5110 sq. ft. basement with patio area. The medical treatment area Group I1.2 has been designed as a suite per UBC Chapter 10. Other work includes all site improvements, paving and landscaping per approved plans and attachments and DRH01-00196 CUP01-00131. Fire sprinklers used for area.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes9/23/20029/23/20028/10/2004 DONE
First Notice 11/6/200311/6/2003 DONE
Permanent occupancy UNPAID FEE  11/6/2003 DONE
Perm. Occ. Cert. # 9866 issued 11-6-03 to the Digestive Health Clinic.
Permanent Occupancy 11/5/200311/5/2003 DONE
Details
BLD-Final11/5/200311/5/200311/5/2003PPASS
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ 11/5/2003 1:55:32 PM
BLD-Final10/27/200310/28/200310/28/2003PPART
DetailsTom Arcoraci
Jan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes cn posted ok for temp 10/28/2003 3:50:57 PM
FIRE-Final Inspection10/27/200310/28/200310/28/2003APASS
DetailsTroy Cobbley
fire sprinklers, fire alarm and fire life safety finaled 10/28/2003 12:01:34 PM
FIRE-Final Inspection10/23/200310/24/200310/24/2003AFAIL
DetailsTroy Cobbley
Provide signage per review note 10, provide emergency light by south exit and provide verification that the sliding glass exam room doors meet ada 10/24/2003 9:08:33 AM
Code Occupancy Approval  10/17/2003 PASS
Compliance to DRH02-00203 Mod.
PubWorks Occupancy Approval10/16/200310/16/200310/16/2003 DONE
Drainage project complete, signed permanent occupancy 10/16/03. R.Rokovitz
BLD-Aging Inspection10/13/200310/13/200310/13/2003 PART
DetailsTom Arcoraci
wip 10/13/2003 9:23:22 AM
BLD-Framing/Rough-in8/11/20038/12/20038/12/2003APART
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 2 hr must go to deck 8/12/2003 10:55:28 AM
FIRE-Conference7/30/20037/30/20037/30/2003PFAIL
DetailsTroy Cobbley
I stopped at this project to verify that no fire alarm work was being performed and found conduit, boxes and fire alarm FPLP 12 guage wiring installed. A stop work order was issued to Quality Electrics (###-####) job foreman who's name is Alan. The actually man that installed the fire alarm, who also works for quality is Scott according to Alan.
BLD-Framing/Rough-in7/21/20037/22/20037/22/2003PCANC
DetailsTom Arcoraci
ROOF DRAINS
BLD-Framing/Rough-in6/13/20036/13/20036/13/2003PPART
DetailsTom Arcoraci
OK TO COVER- JAN; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover east side 6/13/2003 2:22:34 PM
BLD-Framing/Rough-in6/9/20036/10/20036/10/2003APART
DetailsJim Sly
jan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Bsmnt OK to cover.....S.C. 6/10/2003 11:47:01 AM
BLD-Framing/Rough-in6/2/20036/2/20036/2/2003PPART
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok 6/2/2003 2:33:39 PM
BLD-Framing/Rough-in5/21/20035/22/20035/22/2003APART
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Annette Moore wip ok 5/22/2003 10:32:34 AM
BLD-Framing/Rough-in5/5/20035/5/20035/5/2003PPART
DetailsDave Hannah
jan; Phone #: ###-#### Internet Inspection Request from: Annette Moore steel trusses on roof ok to cover areas that are tobe over built 5/5/2003 2:54:13 PM
BLD-Footing3/6/20033/7/20033/7/2003PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 3/6/2003 at 2:44:33 PM. Contact: ###-####.
BLD-Foundation3/6/20033/6/20033/6/2003PPART
DetailsTom Arcoraci
wip ok south side
BLD-Footing3/4/20033/5/20033/5/2003PPASS
DetailsTom Arcoraci
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Foundation3/4/20033/5/20033/5/2003PPASS
DetailsTom Arcoraci
bob; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD-Footing3/3/20033/4/20033/4/2003PPART
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in3/3/20033/3/20033/3/2003PCANC
DetailsTom Arcoraci
jan; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Footing3/3/20033/3/20033/3/2003PPASS
DetailsTom Arcoraci
wip ok west and south side
BLD-Foundation2/28/20032/28/20032/28/2003PPART
DetailsTom Arcoraci
rebar-jan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie sec a ok 1/3 of bld 2/28/2003 11:05:52 AM
BLD-Footing2/24/20032/25/20032/25/2003PPART
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung This is a partial inspection, all concrete is required to be done by a special inspection. 2/25/2003 2:01:10 PM
BLD-Footing1/7/20031/9/20031/9/2003PPART
DetailsRuss Owen
jan; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Work subject to special inspection. 1/9/2003 2:37:28 PM
(F) Reprint permit  12/18/2002  
Inspection Record Card- Bld  12/17/2002 DONE
Print Occupancy Form  12/17/2002 DONE
Telephone call  12/17/2002 DONE
permit ready and fees due
Issue PAID IN FULL permit  12/17/2002 DONE
Plan assigned to (MLO)9/26/2002 12/16/2002 PASS
DetailsMike Otto
12/16/2002 14:08:42 MLO - activity updated through activity BLDA022 from case BLD02-02339.
PLANS/APPL TAKEN TO FRONT DESK  12/16/2002 DONE
Routing - FIRE12/11/2002 12/13/2002 PASS
Routing - PLANNING12/9/2002 12/10/2002 PASS
Approved per DRH01-196; DrH02-120; DRH02-203 and as noted on sheet A1.1.
Routing - PLAN CHECK12/6/2002 12/9/2002 PASS
Routing Off Site - STRUCTURAL11/19/2002 12/9/2002 PASS
Contacted PDQ to take plans to outside eng. kmm
Plan resubmittals received  12/6/2002 DONE
Received six copies of revised sheet A1.1. Two copies of revised sheet A2.6 and A8.1. Routed to Mike O. kmm
Routing - PLANNING12/3/2002 12/6/2002  
Plan resubmittals received  12/3/2002 DONE
Sheet M8.0 received and forwarded to Mike Otto.
Routing - PLANNING11/29/2002 12/3/2002 FAIL
Plan resubmittals received  12/3/2002 DONE
Received three copies of reivsed sheet A1.1, however they were not signed. Contacted Sam B. of this need. Steve is out of office until Monday 12/9/02. kmm
Routing - PLUMBING11/27/2002 11/29/2002 PASS
per plans , 2000 upc and nfpa 99.
Routing - FIRE11/26/2002 11/27/2002 FAIL
Plan Review Completed(1st rev)  11/27/2002 FAIL
Routing - PLANNING11/21/2002 11/25/2002 FAIL
Plan resubmittals received  11/20/2002 DONE
Received three copies of comment response to Item no. 26. Routed to Mike Otto.
Routing - PUBLIC WORKS11/4/2002 11/12/2002 PASS
Route back to PW after intial review completed
Plan resubmittals received  11/7/2002 DONE
Received three sets of resubmittal sheets C1.0, C2.0, C3.0, C4.0, C5.0, A1.1, A2.2, A2.7, A3.1, A3.4, A3.5, A5.1, S1.1, S1.2, S2.1, S2.3, S3.1, S3.2, M2.1, M4.1, M6.0, M7.0, with (3) cover letter attached to structural calculations. Routed to Mike Otto.
Plan Review Completed(1st rev)  11/4/2002 DONE
Routing - FIRE10/30/2002 11/4/2002 FAIL
DetailsBill Alexander
Lack access turn radius, verify required separations, medical gas quantities, generator questions.
Plan resubmittals requested  10/30/2002 DONE
UBC structural and non-structural corrections
Routing Off Site - STRUCTURAL9/26/2002 10/29/2002 FAIL
contacted PDQ to take plans to outside eng. kmm
Routing - PLAN CHECK10/23/2002 10/29/2002 FAIL
corrections to architect at meeting 10/20/2002
Routing - PLUMBING10/11/2002 10/22/2002 FAIL
2" waste in room 226 needs to be 3", thermol expantion tank st-5 is too small, drainage required for medical air compressor and must be located separatly from med gas cylinder storage, show compressor intake and vacuum pump exhaust locations.
Routing - PLANNING10/3/2002 10/10/2002 FAIL
Passed to DR on 10/07/02. Approved per CUO02-00081 (Mod) applicant red-lined drawings adding (3) handicape parking spaces, (1) of which is Van Accessible.

DR- This application is going to need a Committee level modification for the changes to the roof, windows, and site. Sam Burrows has been notified and we are working on the application.
Routing - Erosion and Sediment10/2/2002 10/3/2002 PASS
ESC Plan approved with conditions attached to drawings.
Routing - PUBLIC WORKS9/26/2002 10/2/2002 FAIL
Requires drainage plan revision per Brian M. kmm
Plan resubmittals received  9/30/2002 DONE
Received five copies of revised sheets C1.0, C2.0, C3.0 and C4.0. Had Rob of Kriezenbeck put with plans. kmm
Plans ACCEPTED BY PLAN TECH  9/26/2002 DONE
Waiting for two copies of soils report. kmm
Routing - PLANNING Land Div9/26/2002 9/26/2002 PASS
Approved as per ROS 5847.
Plan routing begun/NEW & ADDTN  9/26/2002 DONE
Application received  9/23/2002  
Recd Pcfee & Taken To Pln CK  9/23/2002