Permit Information
Permit NumberBLD02-02367
StatusFinaled
Name BOISE AIR TERMINAL (LOADING WALKWAY)
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - CONCOURSE B EXPANSION - AIRCRAFT LOADING WALKWAY) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To construct a new entrance vestibule and support structure to serve a new aircraft loading walkway at "Concourse B Expansion". Work is to include a concrete foundation, cantilevered beams, concrete floor deck, spray applied fire-proofing, steel roof deck, and equipment all per approved drawings, engineering, and plan review conditions on file. The 2nd floor level shall be maintained as a 1-hr occupancy separation. The new aircraft loading walkway shall comply with NFPA 415. The location of fire sprinkler heads shall comply with NFPA 13-1999 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - L/C Approved  1/31/2003 DONE
#15256
BLD-Final1/27/20031/28/20031/28/2003APASS
DetailsJim Storey
###-####
DOC - Permit Finaled1/28/20031/28/20031/28/2003APASS
DetailsJim Storey
Finaled by inspector at 1/28/2003 11:05:52 AM
FIRE-Final Inspection1/20/20031/23/20031/24/2003PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 01/20/2003 at 13:40:16. Contact: ###-####. door was sticking on carpet and is fixed according to GC; alarm tested and okay; card not there to sign off 1/24/2003 8:17:42 AM
BLD-Framing/Rough-in12/18/200212/19/200212/19/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/18/2002 at 09:06:36. Contact: ###-####.
BLD-Framing/Rough-in12/16/200212/17/200212/17/2002PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2002 at 09:47:48. Contact: ###-####.
Issue PAID IN FULL permit  12/2/2002  
Telephone call  10/29/2002 DONE
CALLED 10-29-02
Inspection Record Card- Bld  10/17/2002  
Telephone call  10/17/2002 DONE
left mess that permit is ready
Plan assigned to (CJW)9/27/2002 10/16/2002 PASS
DetailsCarl Westfall
10/16/2002 10:27:33 CJW - activity updated through activity BLDA022 from case BLD02-02367.
Routing - PLAN CHECK10/15/2002 10/16/2002 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/16/2002 PASS
Routing - FIRE10/11/2002 10/15/2002 PASS
DetailsBill Alexander
Plan Review Completed(1st rev)  10/15/2002 DONE
Routing - PLAN CHECK9/27/2002 10/11/2002 PASS
UBC plan review started Oct. 9, 2002 and finished Oct. 11, 2002. The drawings were approved with conditions. See the conditions list.
Plans ACCEPTED BY PLAN TECH  9/27/2002 DONE
First Notice9/25/20029/25/20029/25/2002 DONE
Application received  9/25/2002