BLD-Final | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PASS |
Dave Hannah
|
|
|
entry thru garage 2580 enter.; Phone #: ###-#### Internet Inspection Request from: alan gossi c.c # 22629 2/3/2003 3:24:58 PM
|
DOC - Permit Finaled | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 2/3/2003 3:25:03 PM
|
BLD-Final | 1/30/2003 | 1/31/2003 | 1/31/2003 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 17:19:17. Contact: ###-####. need fire place sign off and gaurd rail out side master bed rm 1/31/2003 11:37:49 AM
|
BLD-Final | 1/30/2003 | 1/30/2003 | 1/30/2003 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/30/2003 at 09:56:10. Contact: ###-####.c/n posted, need trades signed off, etc. 1/30/2003 3:22:51 PM
|
BLD-Wall cover | 12/9/2002 | 12/10/2002 | 12/10/2002 | A | NR |
Carl Dependahl
|
|
|
This is interior sheer inspection; Phone #: ###-#### Internet Inspection Request from: alan gossi
|
BLD-Framing/Rough-in | 12/10/2002 | 12/10/2002 | 12/10/2002 | A | NR |
Carl Dependahl
|
|
|
int shear t 12/10/2002 2:36:51 PM...recall. 12/10/2002 3:04:19 PM
|
BLD-Framing/Rough-in | 12/10/2002 | 12/10/2002 | 12/10/2002 | P | PASS |
Dave Hannah
|
|
|
int shear
|
BLD-Energy code compliance | 12/4/2002 | 12/5/2002 | 12/5/2002 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: alan gossi
|
BLD-Framing/Rough-in | 12/3/2002 | 12/4/2002 | 12/4/2002 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: alan gossi ok to insulate 12/4/2002 9:14:27 AM
|
BLD-Framing/Rough-in | 12/2/2002 | 12/3/2002 | 12/3/2002 | P | FAIL |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: alan gossi needs 12/3/2002 2:58:29 PM fail needs mec c/n items completed and seal package installed no inspection done at this time 12/3/2002 3:15:17 PM
|
BLD-Wall cover | 11/9/2002 | 11/12/2002 | 11/12/2002 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: alan gossi ext shear ok to cover ext walls 11/12/2002 2:37:05 PM
|
BLD-Foundation | 10/21/2002 | 10/21/2002 | 10/21/2002 | P | PART |
Steven Webb
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung wip--65% ready 10/21/2002 1:57:14 PM
|
Inspection Record Card- Bld | | | 10/17/2002 | | |
|
|
|
|
Telephone call | | | 10/17/2002 | | DONE |
|
|
|
talked to mike to verify plans are ready
|
Issue PAID IN FULL permit | | | 10/17/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/16/2002 | | |
|
|
|
|
Plan Review Report | | | 10/16/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/16/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/1/2002 | | 10/16/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/7/2002 | | 10/16/2002 | | PASS |
Steve Munroe
|
|
|
10/16/2002 16:12:46 SAM - activity updated through activity BLDA022 from case BLD02-02375.
|
BLD-Footing | 10/8/2002 | 10/8/2002 | 10/8/2002 | P | PART |
Jim Sly
|
|
|
###-#### Early start footing.... 10/8/2002 3:47:47 PM
|
Case Summary (BLD) | | | 10/8/2002 | | |
|
|
|
|
Plan Review Report | | | 10/8/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/8/2002 | | PEND |
|
|
|
10/8/02 9:45 I called and left a message for Mike with Roth Homes. I need new engineering that matches the front elevation of the house.
Mike called and let me know that the home owner wants to add 2 feet to the house. He will get me new plans and engineering.
|
BLD-Footing | 10/7/2002 | 10/7/2002 | 10/7/2002 | P | NR |
Jim Storey
|
|
|
###-####
|
Early Start Permit | | | 10/7/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 9/26/2002 | | 10/7/2002 | | DONE |
Dan Overy
|
|
|
10/7/2002 14:08:14 SAM - activity updated through activity BLDA183 from case BLD02-02375.
|
Routing - PLANNING | 9/26/2002 | | 9/30/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/30/2002 | | 9/30/2002 | | PASS |
|
|
|
|
Application received | | | 9/26/2002 | | |
|
|
|
|