Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD02-02381
StatusFinaled
Name MIKE CULLEN
Site Address 2014 S BROXON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To move a 891 sq. ft. single family dwelling with an attached 48 sq. ft. porch from outside of city limits (1875 Locust, Nampa) to 2014 South Broxon Street and bring up to code at new location in accordance with owners agreement on file (MIS02-00217), $5000 bond on file (BND02-00089) and attached conditions. Work to include construction of a 939 sq. ft. unfinished basement and hard-surfaced off-street parking. New roofing and siding will be included in project. Seperate permits are required to finish basement. Setbacks approved per AJB & DAA (Planning/Zoning) PC #576 DJO
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/16/20031/16/20031/16/2003PPASS
DetailsTom Arcoraci
mike ###-####
DOC - Permit Finaled1/16/20031/16/20031/16/2003PPASS
DetailsTom Arcoraci
Finaled by inspector at 1/16/2003 2:35:58 PM
BLD-Conference12/11/200212/12/200212/12/2002APASS
DetailsTom Arcoraci
###-#### ok to cover 12/12/2002 11:33:17 AM
BLD-Framing/Rough-in10/22/200210/22/200210/22/2002PPART
DetailsJim Sly
###-#### Should be Foundaton insp......found. OK. 10/22/2002 4:16:11 PM
BLD-Footing10/18/200210/21/200210/21/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2002 at 12:07:33. Contact: ###-####.
Issue PAID IN FULL permit  10/10/2002  
Plan assigned to (DJO)10/9/200210/9/200210/9/2002 PASS
DetailsDan Overy
10/9/2002 13:36:51 DJO - activity updated through activity BLDA022 from case BLD02-02381.
PLANS/APPL TAKEN TO FRONT DESK  10/9/2002 DONE
Case Summary (BLD)  10/9/2002 DONE
Plan Review Report  10/9/2002 DONE
Inspection Record Card- Bld  10/9/2002 DONE
Telephone call  10/9/2002 DONE
PERMIT READY AND FEES DUE
Plans ACCEPTED BY PLAN CHECK  10/9/2002  
Routing - PUBLIC WORKS9/30/2002 9/30/2002 PASS
Routing - PLANNING Land Div9/30/2002 9/30/2002 PASS
Land division approved with property lines on survey and corrected site plan. Talked to Barb Cullen and she said that was their plan.
Routing - PLANNING9/30/2002 9/30/2002 PASS
Routing - PLANNING9/26/2002 9/30/2002 FAIL
Sent to land division. Parking needs to be changed. Mike Cullen bringing new site plan.
Application received  9/26/2002  
Pending Assignment by DJO9/26/2002    
DetailsDan Overy
Routing - PLAN CHECK10/1/2002