Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD02-02385
StatusFinaled
Name ROLLING STONE INC
Site Address 1766 S WHISPER COVE AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
To build a new 2333s.f. 2-story single family dwelling with 1633s.f. on the main level and 700s.f. on the upper level. There is a 576s.f. 2-car garage attached with a breezway. setbacks ok per akt. All per the approved plans as marked and attached engineering; engineering details and conditions list. PC#0579 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/26/2007  
BLD-Final1/28/20031/29/20031/29/2003APASS
DetailsRuss Owen
###-#### ray
DOC - Permit Finaled1/29/20031/29/20031/29/2003APASS
DetailsRuss Owen
Finaled by inspector at 1/29/2003 10:42:24 AM
BLD-Final1/27/20031/27/20031/27/2003PFAIL
DetailsRuss Owen
###-####-ray re-insp for fn -front door will be unlocked c/n posted. 1/27/2003 2:00:31 PM
BLD-Final1/24/20031/24/20031/24/2003PNH
DetailsRuss Owen
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung. locked out. 1/24/2003 3:23:32 PM
BLD-Energy code compliance12/11/200212/12/200212/12/2002APASS
DetailsRuss Owen
BLD-Energy code compliance12/11/200212/11/200212/11/2002PCANC
DetailsRuss Owen
reyes ###-#### unable to do to many others. 12/11/2002 6:39:10 PM
BLD-Framing/Rough-in12/11/200212/11/200212/11/2002PCANC
DetailsRuss Owen
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieunable to do to many others 12/11/2002 6:39:27 PM
BLD-Framing/Rough-in12/10/200212/10/200212/10/2002PFAIL
DetailsRuss Owen
ray; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, addnl repairs required addl c/n. 12/10/2002 4:45:58 PM
BLD-Framing/Rough-in12/6/200212/9/200212/9/2002APART
DetailsRuss Owen
-BRIAN- ###-####--CALL 1ST BEFORE INSP. meet withthe framer about c/n , stairs is the issue,as drawn on plans stair are difficult to construct framer will reconstruct from landing down. 12/9/2002 11:27:02 AM
BLD-Energy code compliance12/5/200212/6/200212/6/2002AFAIL
DetailsRuss Owen
###-#### ray Corrections not completet posted c/n to meet contractor on site. 12/6/2002 12:26:32 PM
BLD-Framing/Rough-in12/4/200212/4/200212/4/2002PFAIL
DetailsJim Sly
ray; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N for truss issues and C/N pending from Steve. 12/4/2002 4:46:47 PM
BLD-Framing/Rough-in11/25/200211/25/200211/25/2002PFAIL
DetailsSteven Webb
RAY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N posted--Also mechanical rough in not granted--Do not insulate. 11/25/2002 3:58:00 PM
BLD-Framing/Rough-in11/14/200211/14/200211/14/2002PPART
DetailsTom Arcoraci
###-#### ok to side 11/14/2002 3:34:42 PM
BLD-Foundation10/10/200210/11/200210/11/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 10/10/2002 at 17:23:23. Contact: ###-####.wip. 10/11/2002 11:07:29 AM
BLD-Footing10/9/200210/10/200210/10/2002APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/09/2002 at 17:16:08. Contact: ###-####. wip okm 10/10/2002 11:07:53 AM
BLD-Footing10/9/200210/9/200210/9/2002PNR
DetailsRuss Owen
###-####
Inspection Record Card- Bld  10/8/2002 DONE
Telephone call  10/8/2002 DONE
permit ready and fees due
Issue PAID IN FULL permit  10/8/2002 DONE
Plan assigned to (PEP)10/7/200210/7/200210/7/2002 PASS
DetailsPerry Paine
10/7/2002 16:53:06 PEP - activity updated through activity BLDA022 from case BLD02-02385.
Inspector's copy Bld permit  10/7/2002 DONE
Plan Review Report  10/7/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/7/2002 DONE
Pending Assignment by DJO9/27/2002 10/7/2002 DONE
DetailsDan Overy
10/7/2002 16:20:32 PEP - activity updated through activity BLDA176 from case BLD02-02385.
Routing - PLANNING9/27/2002 9/30/2002 PASS
Routing - PUBLIC WORKS9/30/2002 9/30/2002 PASS
Application received  9/27/2002  
Routing - PLAN CHECK10/1/2002