BLD-Final | 1/15/2016 | 1/19/2016 | 1/19/2016 | P | PASS |
Mike Jordan
|
|
|
Diana// please call before Phone #: ###-####. All previous issues from inspector #407 have been resolved. Ok for perm occ.
|
Permanent Occupancy | | | 1/19/2016 | | DONE |
|
|
|
|
Permanent Occupancy | | | 1/19/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/15/2016 | | DONE |
|
|
|
Okay per Rita Deyoung
|
Second Notice BLD | 9/25/2006 | 9/25/2006 | 9/25/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 8/1/2006 | 8/1/2006 | 9/25/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 8/1/2006 | 8/1/2006 | 8/1/2006 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/1/2006 | 8/1/2006 | 8/1/2006 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 5/31/2006 | 5/31/2006 | 5/31/2006 | | CANC |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 3/28/2006 | 3/28/2006 | 3/28/2006 | | CANC |
Mike Jordan
|
|
|
Store was closed at time of arrival for insp.
|
BLD-Final | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | FAIL |
Russ Owen
|
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows. Need rest room sign and claer path to rest room. 7/23/2003 9:37:24 AM
|
FIRE-Final Inspection | 7/3/2003 | 7/3/2003 | 7/3/2003 | P | PASS |
Troy Cobbley
|
|
|
Fire alarm, fire sprinkler and fire life safety finaled. Fire alarm system is complete
|
FIRE-Final Inspection | 11/26/2002 | 11/27/2002 | 11/27/2002 | A | PART |
Troy Cobbley
|
|
|
a temporary occupancy was given with Dave millers permission for the fire alarm system until the drawings are approved and the system tested. The owner has until 2-28-03 to complete work 11/27/2002 9:35:07 AM
|
BLD-Final | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 09:57:45. Contact: ###-####.ok temp oc pending fire/life safety for a final oc. 11/27/2002 3:41:26 PM
|
Issue PAID IN FULL permit | | | 10/29/2002 | | DONE |
|
|
|
|
Plan assigned to (JCB) | 10/7/2002 | | 10/23/2002 | | PASS |
Jason Blais
|
|
|
10/23/2002 09:03:53 JCB - activity updated through activity BLDA022 from case BLD02-02390.
|
Routing - PLAN CHECK | 10/9/2002 | | 10/23/2002 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2002 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/23/2002 | | |
|
|
|
|
Print Occupancy Form | | | 10/23/2002 | | |
|
|
|
|
Telephone call | | | 10/23/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 10/22/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets T1.0 with (1) copy of details/submittal form. Routed to Jason Blais.
|
Plan resubmittals received | | | 10/17/2002 | | |
|
|
|
Received two sets of resubmittal sheets A1.0 with cover letter. Routed to Jason Blais.
|
Routing - PLAN CHECK | 10/7/2002 | | 10/9/2002 | | FAIL |
|
|
|
Plan review letter sent and faxed to architect. Plan resubmittals and response required for further review.
|
Routing - FIRE | 10/2/2002 | | 10/7/2002 | | PASS |
Bill Alexander
|
|
|
|
Routing - PLUMBING | 10/2/2002 | | 10/2/2002 | | PASS |
|
|
|
1. all plumbing fixtures will be installed by a licensed plumbing contractor. 2. water heater will require a pan with a drain and expansion protection 3. existing floor sink must be properly vented. 4. premise and equipment backflow protection may be required.
|
Routing - PUBLIC WORKS | 9/30/2002 | | 10/1/2002 | | PASS |
|
|
|
|
Routing - PLANNING | 10/1/2002 | | 10/1/2002 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2002 | | DONE |
|
|
|
|
Application received | | | 9/27/2002 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/27/2002 | | |
|
|
|
|
First Notice | | 1/29/2016 | | | |
|
|
|
|
First Notice | | 1/29/2016 | | | |
|
|
|
|
Fee Review-notes | 9/27/2002 | 9/27/2002 | | | |
|
|
|
|