BLD-Final | 3/25/2003 | 3/26/2003 | 3/26/2003 | A | PASS |
Russ Owen
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
DOC - Permit Finaled | 3/26/2003 | 3/26/2003 | 3/26/2003 | A | PASS |
Russ Owen
|
|
|
Finaled by inspector at 3/26/2003 11:23:07 AM
|
BLD-Framing/Rough-in | 12/30/2002 | 12/31/2002 | 12/31/2002 | A | PASS |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung ok to complete all drywall . 12/31/2002 11:05:21 AM
|
BLD-Framing/Rough-in | 12/27/2002 | 12/30/2002 | 12/30/2002 | A | FAIL |
Russ Owen
|
|
|
shear steve; Phone #: ###-#### Internet Inspection Request from: Marsha SmylieNeeds to be a 6d cooler or provide alternate for screws nails,called builder and posted note. 12/30/2002 2:05:14 PM
|
BLD-Framing/Rough-in | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 13:51:06. Contact: ###-####.
|
BLD-Energy code compliance | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 13:51:54. Contact: ###-####.
|
BLD-Wall cover | 12/18/2002 | 12/19/2002 | 12/19/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/18/2002 at 13:52:54. Contact: ###-####. great room wall drywall on one side is a shear wall nailing is 6 oc to the 10 ft high level 12/19/2002 3:14:44 PM
|
BLD-Wall cover | 12/17/2002 | 12/17/2002 | 12/17/2002 | P | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/17/2002 at 10:27:01. Contact: ###-####.c/n posted. 12/17/2002 3:17:11 PM
|
BLD-Framing/Rough-in | 12/9/2002 | 12/9/2002 | 12/9/2002 | P | PART |
Russ Owen
|
|
|
steve--shear wall ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylieok to side, still need interior shear wall and bloking at top of this wall as per plan. 12/9/2002 5:00:27 PM
|
BLD-Framing/Rough-in | 12/5/2002 | 12/5/2002 | 12/5/2002 | P | FAIL |
Russ Owen
|
|
|
steve shear; Phone #: ###-#### Internet Inspection Request from: Marsha Smyliec/n posted reg prior c/n. 12/5/2002 2:36:41 PM
|
BLD-Framing/Rough-in | 11/27/2002 | 11/27/2002 | 11/27/2002 | P | FAIL |
Russ Owen
|
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawsonc/n posted. 11/27/2002 2:49:41 PM
|
BLD-Framing/Rough-in | 11/26/2002 | 11/26/2002 | 11/26/2002 | P | FAIL |
Jim Sly
|
|
|
shear steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie NR Need letter from Eng for any changes and staple equivil table. 11/26/2002 3:17:14 PM
|
BLD-Framing/Rough-in | 11/25/2002 | 11/25/2002 | 11/25/2002 | P | FAIL |
Steven Webb
|
|
|
###-#### C/N posted--SHEAR--Many items --Do not side. 11/25/2002 1:44:15 PM
|
BLD-Foundation | 10/30/2002 | 10/30/2002 | 10/30/2002 | P | PART |
Russ Owen
|
|
|
###-#### DIRK
|
BLD-Footing | 10/29/2002 | 10/29/2002 | 10/29/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/29/2002 at 10:29:05. Contact: ###-####.wip. 10/29/2002 4:20:28 PM
|
BLD-Footing | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | FAIL |
Dave Hannah
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung hole dug but no one on site 10/22/2002 2:29:28 PM
|
Issue PAID IN FULL permit | | | 10/17/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/14/2002 | | |
|
|
|
|
Telephone call | | | 10/14/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 10/4/2002 | | 10/14/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/10/2002 | | 10/14/2002 | | PASS |
Steve Munroe
|
|
|
10/14/2002 13:09:51 SAM - activity updated through activity BLDA022 from case BLD02-02415.
|
Print Pending Permit.LaserJet4 | | | 10/11/2002 | | |
|
|
|
|
Plan Review Report | | | 10/11/2002 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/11/2002 | | PEND |
|
|
|
10/11/02 I called and left a message for the engineer to call me regarding the rear of the master bedroom. I also let the builder know that I am waiting to hear from the engineer and that the plans will be on hold till I do.
|
Pending Assignment by DJO | 10/1/2002 | | 10/10/2002 | | DONE |
Dan Overy
|
|
|
10/10/2002 16:06:38 SAM - activity updated through activity BLDA183 from case BLD02-02415.
|
Routing - PLANNING | 10/1/2002 | | 10/4/2002 | | DONE |
|
|
|
Per setback corrections. Please represent R-1B setbacks on plans rather than R-1C. See red lined covered patio. AKT
|
Routing - PUBLIC WORKS | 10/4/2002 | | 10/4/2002 | | PASS |
|
|
|
|
Application received | | | 10/1/2002 | | |
|
|
|
|