Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02442
StatusFinaled
Name BOISE CITY AIRPORT
Site Address 3201 W AIRPORT WAY
Project NameAIRPORT
Customer Number 
ePlanReviewNo
Description
(BOISE AIR TERMINAL - CONCOURSE B EXPANSION - ROOF ACCESS STAIRWAY) This building is fire sprinklered to substitute for 1-hr fire-resistive construction. To construct a new roof access exterior stairway on the North side of "Concourse B Expansion". Work is to include a concrete slab on grade, concrete piers, steel columns, steel stair stringers, steel treads, and landings made of steel metal grating all per approved drawings, engineering, and plan review conditions on file. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  4/24/2003 DONE
BLD-Aging Inspection2/4/20032/4/20032/4/2003 DONE
DetailsJim Storey
as per plan. 2/4/2003 7:43:15 AM
DOC - Permit Finaled2/4/20032/4/20032/4/2003APASS
DetailsJim Storey
Finaled by inspector at 2/4/2003 7:43:18 AM
Issue & PRINT to be Invoiced  11/1/2002 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/29/2002 PASS
Inspection Record Card- Bld  10/29/2002 DONE
Telephone call  10/29/2002 DONE
permit ready and fees due
Routing - PLAN CHECK10/14/2002 10/29/2002 PASS
(10-16-02) Failed first UBC review. UBC plan review started October 15. 2002 and finished October 16, 2002. A response from the architect/engineer was required. See the conditions list. Waiting for response. (10-29-02) The drawings were approved, with conditions, after the resubmittal review.
Plan assigned to (CJW)10/14/2002 10/29/2002 PASS
DetailsCarl Westfall
10/29/2002 13:36:53 CJW - activity updated through activity BLDA022 from case BLD02-02442.
Plan resubmittals received  10/25/2002 DONE
Received two copies of struct. calculations. Routed to Carl W. kmm
Routing - Erosion and Sediment10/4/2002 10/14/2002 PASS
ESC Permit or Plan not required for this project. Minor Disturbance.
Additional plans submitted  10/4/2002 DONE
Received ESC permit application with waiver letter. Attached to plans.
Routing - PUBLIC WORKS10/3/2002 10/4/2002 PASS
First Notice10/3/200210/3/200210/3/2002 DONE
Plans ACCEPTED BY PLAN TECH  10/3/2002 DONE
1. Informed applicant that ESC might be required, directed him to contact Jim Rogers.
Application received  10/3/2002  
Recd Pcfee & Taken To Pln CK  10/3/2002 DONE