BLD-Final | 4/8/2003 | 4/9/2003 | 4/9/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/8/2003 at 4:48:50 PM. Contact: ###-####.
|
DOC - Permit Finaled | 4/9/2003 | 4/9/2003 | 4/9/2003 | A | PASS |
Jim Storey
|
|
|
Finaled by inspector at 4/9/2003 9:10:59 AM
|
BLD-Final | 4/7/2003 | 4/8/2003 | 4/8/2003 | P | NH |
Jim Storey
|
|
|
kevin please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore called no responce for access. 4/8/2003 4:38:23 PM
|
BLD-Final | 4/2/2003 | 4/3/2003 | 4/3/2003 | P | CANC |
Jim Storey
|
|
|
call for access code ###-#### called and cancled 4/3/2003 9:41:45 AM
|
BLD-Footing | 1/14/2003 | 1/15/2003 | 1/15/2003 | A | PASS |
Jim Storey
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n made ok 1/15/2003 8:14:38 AM
|
BLD-Energy code compliance | 1/3/2003 | 1/6/2003 | 1/6/2003 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 01/03/2003 at 12:24:42. Contact: ###-####. ft at front porch stil missing needs insp. 1/6/2003 3:15:20 PM
|
BLD-Energy code compliance | 1/2/2003 | 1/3/2003 | 1/3/2003 | A | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 01/02/2003 at 11:54:59. Contact: ###-####.
|
BLD-Wall cover | 1/3/2003 | 1/3/2003 | 1/3/2003 | A | PASS |
Alan Hauser
|
|
|
|
BLD-Framing/Rough-in | 12/30/2002 | 12/31/2002 | 12/31/2002 | P | FAIL |
Dave Hannah
|
|
|
kevin--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie truess ok but shear panels still not nailed per plans ok to insulate 1/2/2003 7:39:43 AM
|
BLD-Framing/Rough-in | 12/23/2002 | 12/24/2002 | 12/24/2002 | P | NR |
Jim Storey
|
|
|
###-#### ###-####c/n 12/24/2002 1:50:57 PM
|
BLD-Foundation | 11/7/2002 | 11/8/2002 | 11/8/2002 | A | PART |
Steven Webb
|
|
|
###-#### wip--5% ready at time of inspection. 11/8/2002 10:09:23 AM
|
BLD-Footing | 11/7/2002 | 11/7/2002 | 11/7/2002 | P | PART |
Dave Hannah
|
|
|
###-#### jerad work in progress crew is checing with arc on rebar plans call for two in ftg and two in wall crew wants to use rebar only in walls with hold downs 11/7/2002 1:32:45 PM
|
Issue PAID IN FULL permit | | | 10/31/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/28/2002 | | |
|
|
|
|
Telephone call | | | 10/28/2002 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 10/21/2002 | | 10/25/2002 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 10/24/2002 | | 10/25/2002 | | PASS |
Steve Munroe
|
|
|
10/25/2002 15:52:43 SAM - activity updated through activity BLDA022 from case BLD02-02495.
|
Plan Reviewer's activity | | | 10/25/2002 | | PEND |
|
|
|
10/25/02 11:30 I talked to the engineer and the designer. They will get me information on the upper floor brace panels at the rear, deck framing, beam locations and garage door header size.
|
Print Pending Permit.LaserJet4 | | | 10/25/2002 | | |
|
|
|
|
Plan Review Report | | | 10/25/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2002 | | DONE |
|
|
|
|
Pending Assignment by DJO | 10/11/2002 | | 10/24/2002 | | DONE |
Dan Overy
|
|
|
10/24/2002 11:36:39 SAM - activity updated through activity BLDA183 from case BLD02-02495.
|
Routing - PLANNING | 10/11/2002 | | 10/21/2002 | | DONE |
|
|
|
Plans revised.
|
Routing - PUBLIC WORKS | 10/21/2002 | | 10/21/2002 | | PASS |
|
|
|
|
Application received | | | 10/11/2002 | | |
|
|
|
|