Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD02-02495
StatusFinaled
Name HIGH DESERT CONSTRUCTION
Site Address 2179 S WHITE PINE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three bathroom 3018 sq. ft. two story single family dwelling (1850 sq. ft. first floor/1168 sq. ft. second floor) with a attached 694 sq. ft. two car garage and a 466 sq. ft. covered front deck. Per approved plans, engineering and requirement list. PC#626 (SAM)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/8/20034/9/20034/9/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/8/2003 at 4:48:50 PM. Contact: ###-####.
DOC - Permit Finaled4/9/20034/9/20034/9/2003APASS
DetailsJim Storey
Finaled by inspector at 4/9/2003 9:10:59 AM
BLD-Final4/7/20034/8/20034/8/2003PNH
DetailsJim Storey
kevin please call for access; Phone #: ###-#### Internet Inspection Request from: Annette Moore called no responce for access. 4/8/2003 4:38:23 PM
BLD-Final4/2/20034/3/20034/3/2003PCANC
DetailsJim Storey
call for access code ###-#### called and cancled 4/3/2003 9:41:45 AM
BLD-Footing1/14/20031/15/20031/15/2003APASS
DetailsJim Storey
kevin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie c/n made ok 1/15/2003 8:14:38 AM
BLD-Energy code compliance1/3/20031/6/20031/6/2003APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/03/2003 at 12:24:42. Contact: ###-####. ft at front porch stil missing needs insp. 1/6/2003 3:15:20 PM
BLD-Energy code compliance1/2/20031/3/20031/3/2003ANR
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 01/02/2003 at 11:54:59. Contact: ###-####.
BLD-Wall cover1/3/20031/3/20031/3/2003APASS
DetailsAlan Hauser
BLD-Framing/Rough-in12/30/200212/31/200212/31/2002PFAIL
DetailsDave Hannah
kevin--re-insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie truess ok but shear panels still not nailed per plans ok to insulate 1/2/2003 7:39:43 AM
BLD-Framing/Rough-in12/23/200212/24/200212/24/2002PNR
DetailsJim Storey
###-#### ###-####c/n 12/24/2002 1:50:57 PM
BLD-Foundation11/7/200211/8/200211/8/2002APART
DetailsSteven Webb
###-#### wip--5% ready at time of inspection. 11/8/2002 10:09:23 AM
BLD-Footing11/7/200211/7/200211/7/2002PPART
DetailsDave Hannah
###-#### jerad work in progress crew is checing with arc on rebar plans call for two in ftg and two in wall crew wants to use rebar only in walls with hold downs 11/7/2002 1:32:45 PM
Issue PAID IN FULL permit  10/31/2002 DONE
Inspection Record Card- Bld  10/28/2002  
Telephone call  10/28/2002 DONE
left mess that permit is ready
Routing - PLAN CHECK10/21/2002 10/25/2002 DONE
Plan assigned to (SAM)10/24/2002 10/25/2002 PASS
DetailsSteve Munroe
10/25/2002 15:52:43 SAM - activity updated through activity BLDA022 from case BLD02-02495.
Plan Reviewer's activity  10/25/2002 PEND
10/25/02 11:30 I talked to the engineer and the designer. They will get me information on the upper floor brace panels at the rear, deck framing, beam locations and garage door header size.
Print Pending Permit.LaserJet4  10/25/2002  
Plan Review Report  10/25/2002  
PLANS/APPL TAKEN TO FRONT DESK  10/25/2002 DONE
Pending Assignment by DJO10/11/2002 10/24/2002 DONE
DetailsDan Overy
10/24/2002 11:36:39 SAM - activity updated through activity BLDA183 from case BLD02-02495.
Routing - PLANNING10/11/2002 10/21/2002 DONE
Plans revised.
Routing - PUBLIC WORKS10/21/2002 10/21/2002 PASS
Application received  10/11/2002