BLD-Final | 5/29/2003 | 5/30/2003 | 5/30/2003 | P | PASS |
Tom Arcoraci
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Grading Inspection | 5/30/2003 | 5/30/2003 | 5/30/2003 | | PASS |
Rita DeYoung
|
|
|
Final grading and drainage is approved
|
DOC - Permit Finaled | 5/30/2003 | 5/30/2003 | 5/30/2003 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 5/30/2003 2:00:20 PM
|
BLD-Final | 3/13/2003 | 3/14/2003 | 3/14/2003 | A | CANC |
Jim Storey
|
|
|
Internet Inspection Request from: Curtis Claytom called dave hail said no resone for insp. 3/14/2003 2:58:39 PM
|
BLD-Framing/Rough-in | 2/12/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Tom Arcoraci
|
|
|
requests Carl Dependahl ###-####
|
BLD-Energy code compliance | 2/12/2003 | 2/13/2003 | 2/13/2003 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 02/11/2003 at 13:30:43. Contact: ###-####...c/n: fireblocks, post/beam connections ( strap steel beam ) roof spans (2x12 instead of tji's) ok to insul pend plbg. 2/12/2003 1:07:05 PM
|
BLD-Framing/Rough-in | 1/22/2003 | 1/23/2003 | 1/23/2003 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/22/2003 at 15:52:54. Contact: ###-####.shear ok to cover ext 1/23/2003 3:51:57 PM
|
BLD-Footing | 12/23/2002 | 12/24/2002 | 12/24/2002 | A | PART |
Carl Dependahl
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...garage walls ok; ret. wall for entry- courtyard not shown, built as per 4' wall detail 12/24/2002 10:38:42 AM
|
BLD-Foundation | 12/5/2002 | 12/5/2002 | 12/5/2002 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/05/2002 at 07:41:21. Contact: ###-####.
basement wall 12/5/2002 3:28:35 PM
|
BLD-Footing | 11/25/2002 | 11/26/2002 | 11/26/2002 | A | PART |
Dave Hannah
|
|
|
###-#### ftg for basement section of home all rebar in forms are up setbacks look ok but are rigthon on front and north side 11/26/2002 11:42:57 AM
|
BLD-Grading Inspection | 11/25/2002 | 11/25/2002 | 11/25/2002 | | PASS |
Rita DeYoung
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
Plan assigned to (DJO) | 11/1/2002 | 11/1/2002 | 11/6/2002 | | PASS |
Dan Overy
|
|
|
11/6/2002 08:20:03 DJO - activity updated through activity BLDA022 from case BLD02-02535.
|
Plan Reviewer's activity | | | 11/6/2002 | | DONE |
|
|
|
received revised elevations with modified grade changes. lower level basement area originally was classified as a story. will now be considered basement area only. footing, post calculations and framing addendums stapled into plan sets. ok to issue.
|
Case Summary (BLD) | | | 11/6/2002 | | DONE |
|
|
|
|
Plan Review Report | | | 11/6/2002 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2002 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/6/2002 | | |
|
|
|
|
Telephone call | | | 11/6/2002 | | DONE |
|
|
|
CALLED 11-6-02
|
Issue PAID IN FULL permit | | | 11/6/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/1/2002 | | PEND |
|
|
|
have contacted Jim Glancey 10/31/02 and 11/01/02 about structure being classified as three story. other items discussed were framing addendums around both stair cores, post calculations and exterior footing design which will include pier design.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/1/2002 | | |
|
|
|
|
Routing - FIRE | 10/22/2002 | | 10/23/2002 | | DONE |
|
|
|
No fire sprinkler requirements (Horizon View Sub.)
|
Routing - Erosion and Sediment | 10/22/2002 | | 10/22/2002 | | PASS |
|
|
|
ESC plan approved with conditions attached to plans.
|
Routing - PLANNING | 10/17/2002 | | 10/22/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 10/15/2002 | | 10/17/2002 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3 with conditions of aproval in letter attached plans and this case.
|
Routing - PUBLIC WORKS | 10/17/2002 | | 10/17/2002 | | PASS |
|
|
|
|
Application received | | | 10/15/2002 | | |
|
|
|
|
Pending Assignment by DJO | 10/15/2002 | | | | |
Dan Overy
|
|
|
|
Routing - PLAN CHECK | 10/23/2002 | | | | |
|
|
|
|