Permit NumberBLD02-02546
StatusFinaled
Name CARL HARRISON
Site Address 8455 W WESTPARK ST
Project NameSCP Technologies
Customer Number 
ePlanReviewNo
Description
SCP Global Technologies, New N2 Plant Pad. To prepare site for construction of new 23' x 40' x 1'-9" deep with (2) layers of #5 bar @ 12" o.c.e.w. and a new 13' x 36' x .67' deep pad, #4 bars @ 12" o.c. e.w., for future compressor & other equipment support. Pads being installed for future N2 Plant. Separate application and plans to be submitted for equipment installation per letter from Ben Hill, Architect, in behalf of SCP. New N2 Plant and equipment upgrade deleted from scope of work under this permit. All per approved plans notes & attachments to plans by all design review agencies. A "Letter of Completion / Compliance" is required. CZC02-00148 PC#669-02/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20031/8/20031/8/2003APASS
DetailsRuss Owen
ok by special inspection completion,and zoning certificate of compliance issued. 1/8/2003 1:24:47 PM
DOC - Permit Finaled1/8/20031/8/20031/8/2003PPASS
DetailsRuss Owen
Finaled by inspector at 1/8/2003 1:24:50 PM
Code Occupancy Approval1/8/20031/7/20031/7/2003APASS
DetailsScott M.Brown
YES PAD IN OK FOR FINAL 1/8/2003 10:19:37 AM
BLD-Final1/3/20031/6/20031/6/2003PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/03/2003 at 12:03:24. Contact: ###-####.This need zoning as indicated by the required signature area, I called contractor will call for this then recall. 1/6/2003 4:53:50 PM
BLD-Footing12/10/200212/11/200212/11/2002APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 12/10/2002 at 11:56:49. Contact: ###-####.ok pending s-i. 12/11/2002 6:04:27 PM
Issue PAID IN FULL permit  12/3/2002 DONE
Inspection Record Card- Bld  12/3/2002  
Telephone call  11/27/2002 DONE
CALLED 11-26-02
Routing - Erosion and Sediment11/25/2002 11/26/2002 PASS
ESC plan approved with conditions attached to plans.
Routing - PLAN CHECK11/26/2002 11/26/2002 PASS
Per approved plans notes and attachments. Scope of work changed by architect in behalf of SCP to permit concrete pads only. No equipent installation, electrical or utility with this permit.
PLANS/APPL TAKEN TO FRONT DESK  11/26/2002 PASS
To permit desk for issue.
Plan assigned to (DRS)10/16/2002 11/26/2002 PASS
DetailsDan Stuart
11/26/2002 16:34:51 DRS - activity updated through activity BLDA022 from case BLD02-02546.
Routing - FIRE11/21/2002 11/25/2002 PASS
Telephone call  11/21/2002 DONE
Called Ben Hill to request additional values for electrical & equipment for N2 Plant. Value on C.V. submitted only covers the concrete. Ben will check with owner to see if he wants to remove scope of equipment & electrical from this permit. This permit is tied to CZ02-00148 to allow the new equipment placement as presented to zoning. Would need to verify with planning if changes are needed for reference to permit. The installation of the equipment and electrical would need a building permit and connection to fire code permit for compliance with Article 75 & UFC Standard 80-4 and having a permit to tie the electrical code items and special inspection concerns for use of adhesive / epoxy anchor for support of the tank & other equipment.Ben will get back with me.
Waiting for Cert. of Value  11/21/2002  
Certificate of value submitted with plans does not reflect the equipment or electrical values for permitting of project and separate electrical permits etc. Contacted Ben Hill to let him know new C.V. was needed before permit could be issued.
Routing - PLAN CHECK10/29/2002 11/21/2002 PEND
Architect to provide new C.V. to include electrical & equipment or letter from owner removing from scope of work for this permit. Separate plans and permit would be needed for equipment inspallation, anchoring and to show compliance with fire code Article 75 & UFC Standard 80-4; and NEC 2002. routing to fire code analyst for review.
Routing - PLANNING10/21/2002 10/29/2002 PASS
Approved per CZC02-148.
Additional plans submitted  10/28/2002 DONE
Received 2 copies of 18 X 24 size esc plans. Routed to Dan S. kmm
Plan resubmittals received  10/23/2002 DONE
Received two copies of the ESC Plan with narrative. I requested from Ben Hill that (2) copies of minimum 18"x24" plans must be submitted also. Routed to Dan Stuart.
Routing - Erosion and Sediment10/17/2002 10/18/2002 FAIL
Waiver request not approved.

Contacted Ben Hill at ###-#### regarding requirement for a ESC plan.
Routing - PLANNING Land Div10/16/2002 10/17/2002 PASS
Lot 1 of Block 1 of Westpark Subdivision.
Routing - PUBLIC WORKS10/17/2002 10/17/2002 PASS
First Notice10/16/200210/16/200210/16/2002 DONE
Application received  10/16/2002  
Recd Pcfee & Taken To Pln CK  10/16/2002  
Plans ACCEPTED BY PLAN TECH  10/16/2002 DONE
Brian Murphy does not requires grading and drainage. kmm
Plan routing begun/TENANTS  10/16/2002 DONE
Routing Off Site - STRUCTURAL10/16/2002    
contacted pdq to take plans to outside eng. kmm